Loading...
HomeMy WebLinkAboutLot Certifications - 12/21/2001 (2)NORTHERN December 17, 2001 Mr. Jay Barber City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Lan ings Bay Drainage Certification (Buildings E & F) Dear Mr. Barber: On behalf of our client, Spanjer Construction Corporation, we would like to submit to you a drainage certification letter for both Building E and Building F in the Landings Bay project. Northern Engineering has reviewed the as -constructed elevations provided by RJL Surveys for the buildings noted above. Building E was constructed with a finished floor elevation of 41.80 for the main level, and a lower level elevation of 32.26, Building F was constructed with a finished floor elevation of 39.62 for the main level, and 32.24 for the lower level. Attached for your convenience are two exhibits, one indicating design elevations and the other showing the as - constructed elevations (handwritten and/or circled). The surveyor's field notes are also included to further clarify the spot elevations. Thank you for your time and consideration of this request. Please call us if you have any questions. Roger A Jurtiss, P.E. Vice President cc: Steve Spanjer - Spanjer 27362 STORMWATER RECEIVED DEC 2 0 2001 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159 03 Jo.. %4co DE441osw VtEVAT TOWS 4 I I I I I 1 I I 1 I I I I .4 F.E.S. INV.=26.50 mo Al bit WNW "I I AMU fi:1mi'llilli }. • r, ":3;C R�Y� .it ii�:`c ']T Cr+. 'ia•�uw'4fi..fR n. _� ✓.:� b Q l� I �! I I I I N{ �k t4 t�1� %� OI o`i V! J\ �i n1 lot tn co V) �'`� SriVr {3 �'I 1 of of �i al Ni of f �'f a� u zt 1`) rA N I t3� N u — - to Td] N �TN �'ff� n Jltrt,(4� - "' il *