Loading...
HomeMy WebLinkAboutLot Certifications - 10/03/2001October 3, 2001 Mr. Jay Barber City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80521 RE: Landings Bay Drainage Certification (Building D) Dear Mr. Barber: STOAT," -,'ATEA 3995 L OCT.O S. 2 On behalf of our client, Spanjer Construction Corporation, we would like to submit to you a drainage certification letter for Building D in the Landings Bay project. Northern Engineering has reviewed the as -constructed elevations provided by RJL Surveys for the building noted above. Building G was constructed with a finished floor elevation of 45.10 for the main level, and a lower level elevation of 36.70. Attached for your convenience are two exhibits, one indicating design elevations and the other showing the as -constructed elevations (handwritten and/or circled): Thank you for your time and consideration of this request. Please call us if you have any questions. Sincerely, Roger A Qurtiss, P.E. Project ManagerNice President cc: Steve Spanjer - Spanjer 27362 420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 221-4159 -mod 1A 1 0 m !7 No Text