Loading...
HomeMy WebLinkAboutLot Certifications - 06/11/2001May 30, 2001 W. Jay Barber Stormwater Utilities City of Fort Collins Fort Collins, Colorado 80524 RE: Landings -Bay- - Drainage Certification (Bu ding,C),,, Dear Mr. Barber: On behalf of our client, Spanjer Construction Corporation, we would like to submit to you a drainage certification letter for Building C in the Landings Bay project. Northern Engineering has reviewed the as -constructed elevations provided by RJL Surveys for the building noted above. Building C was constructed with a finished floor elevation of 45.30 for the main level, and a lower level elevation of 37.03. Attached, for your convenience is an exhibit, indicating the as - constructed elevations (handwritten and/or circled). Thank you for your time and consideration of this request. Please call us if you have any questions. Sincerely, Roger A gurtiss, P.E. Project ManagerNice President cc: Steve Spanjer - Spanjer 27362 420 SOUTH HOWES, SUITE 202, FORT (OLLINS, (OLORADO 80521, (970) 221-4158, FAX (970) 221-4159 1 m k q� �\w r