Loading...
HomeMy WebLinkAboutSite Certifications - 09/21/2000Sep-20-00 09:50A Northern Engineering 970 221 4159 P.01 September 18, 2000 Mr Jay Barber Stormwater Utilities City of Fort Collins 700 Wood Street Fort Collins, CO 80522 RE: Landings Bay Drainage Certification Jay, STORNA WATE R SEP 2 0.2000 N O R T H E R N ENGINEERING The following letter is intended to serve as a recap of the status of the site certification for Landings Bay. On March 15, 2000, we submitted a certification for the pond and outlet structure. This was submitted so the contractor could proceed with landscaping the pond area. We then submitted a second certification letter on May 10, 2000, stating that all of the drainage improvements had been installed with the exception of the final asphalt. Based on the improvements completed at that date, we requested that the City release an additional 25% of the available building permits, or 50% for the site. When the asphalt surface had been completed, we would provide the City with an As -Built of the site grading/drainage improvements (minus finished floors and minimum opening elevations, which will need to be done separately, as buildings are constructed). Therefore, it would be my understanding that the contractor should be able to obtain at a minimum of 50% of their available permits at this time. We are currently working on verifying the grading/drainage for the site, and will be submitting the results to your office for your files. Please call if you have any questions regarding this letter, or any previous certifications for this site. mcere 1 Roger A rtiss Project Engineer cc: Steve Spanjer 420 SOUTH HOWES, SUITE 202, FORT (OLLINS, COLORADO 80521, (920) 221-4158, FAX 1970) 211-4159