Loading...
HomeMy WebLinkAboutSite Certifications - (25)I May 10, 2000 Mr. Jay Barber Stormwater Utilities City of Fort Collins Fort Collins, Colorado 80524 STORMWATER MAY 10 2000 RE: ; Landings Bay Partial Site Drainage Certification No. 2 j Jay, On behalf of our client, Spanjer Construction Corporation, we would like to submit to you a partial drainage certification letter. All of the improvements have not yet been installed, but are either under construction or have been scheduled for construction. There was also a partial site certification submitted to you for your approvals regarding the onsite detention pond dated March 12, 2000. Essentially, all items pertinent to the onsite drainage system have been installed, with the following exception. a. Asphalt in the residential areas has not yet been installed It is also my understanding from Brian with Spanjer Const. That all erosion control measures have been cleared by Bob Zachely. When the above listed items have been completed, we will provide the City with a final certification letter including a completed list of final elevations and locations. Because of the drainage improvements that have been installed, and due to the fact that the remainder of the.improvements will soon be installed, we would like to request that an additional 25% of the remaining building permits be released for Landings Bay. Thanks for your time and consideration of this request. Should you have any questions, please call. Roger A Curtiss, P.E. = 2 27362 Project Engineer cc: Brian - Spanjer Construction 420 SOUTH HOWES, SUITE 202, FORT (OLLINS, (OLORADO 80521, (970) 221-4158, FAX (970) 221.4159