Loading...
HomeMy WebLinkAboutSite Certifications - 12/02/2004Stantec Consulting Inc 209 South Meldrum Street Fort Collins CO 80521-2603 Tel: (970) 482.5922 Fax: (970) 482-6368 stantec.com DEC 0 2 2004 Stantec November 30, 2004 Mr. Basil Harridan Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado 80522 Re: Drainage Certification for Lind Filing 1, Phase 1 Dear Mr. Harridan: The purpose of this report is to complete the drainage certification for Lind Filing 1, Phase 1. Stantec Surveying visited the site on September. 20, 2004, to topo the pond, located in the southeast corner of the site. The topographic survey revealed a top -of -pond elevation of 5021.70, which allows 25.87 acre-feet of storage. This volume exceeds the required 100-year detention volume of 21.51 acre-feet at an elevation of 5021.75. It is important to note that Centex will install the outlet structure and overflow structure, for Pond 1, in the next phase of construction. Stantec Consulting Ltd. also visited the site on October 12, 2004, and also on November 17 and 30, 2004 to confirm the installation of the storm pipe, structures, and erosion control measures for Phase 1, as seen on sheets CS100 and CS220 of the plans. Temporary riprap and swales have been installed at the east ends of Brightwater Drive, Clipper Way, Bowside Drive, and at the south end of Fairwater Drive. Temporary riprap has also been installed in the northwest corner of Pond 1, as shown on sheet CS100. Furthermore, the temporary swales have been constructed correctly and allow conveyance of stormwater from the site to enter Pond 1. Grass is becoming established in the swales, and straw bales have been installed to mitigate erosion. Upon construction of Phase 1, irrigation tailwater along the north property line was encountered and presented ponding problems. Therefore, a temporary swale/ditch was constructed to transport the water south and into Pond 1. Riprap was placed at the swale/ditch's entrance into Pond 1, to prevent erosion. V:\52870f\active\JOBS\614003\docs\Lindl Phasel Drainage Cert 11-30-04.doc Stantec a It is important to note that the inverts and rims of the storm drain system manholes, and record information for other storm drainage structures will be completed with the Phase 2 certification. Overall, the elevations observed for storm drainage features were within construction tolerances. The pond exceeds the required 100-year detention volume of 21.51 acre-ft, as seen from the provided rating curves. This certification is signed and stamped. By signing this letter, I attest that to the best of my knowledge, the conditions of the site are as shown on the attached redlined photocopy. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any storm water utility holds on the Building Permit or Certificates of Occupancy. Thank you for your time and consideration of this submittal. Sincerely Yours, ;00P�0 REnlS,�g� Stantec Consulting Ltd. P , ..•••..•.. 0 '•� 0 a VV% " C° 35329 Bret Cummock P.E. '-'/��FS ""•• ////�� cc: Elizabeth Brogan, Centex Homes File V:\52870f\active\JOBS\614003\docs\Lind] Phase] Drainage Cert 11-30-04.doc j yy Z Sa MINIMUM SLOPE - D5X A Y My UM SLOPE — I.Op Ask TQ POtARY SWAT£ FOR PHASE I D tW 4a0 a00 M,MENfEEr is 1 he 1 13 1 a 1 N I W 4 1 s 1 e 1 1 1 a I a TEMPORARY TDIN—A—R W 50' RADIUS (TYP.) (SEE DETAIL SHEET CSS01) G SEWER ME 'A' PORARY ENERGY DISSIPATION RIPRAP DETAIL V.L& — S2 INST TEMPORARY MPRAP AS DETAIL THIS SHEET friaxiOl 1.0'Tw CLASS 6 MPRAR (TER.) CONSTRUCTION PHASE 2 SEE SHEET CS101 ETE As capitals (CLASS 6) lDidi DRAWINGS OF RECORD 02 9re OawFP al Taw bn ppMi eM n a Survey ttnWclaE by Bss OsF1N1H .Miles .eml CONSTRUCTION NOTES: PHASE 1 WAS W 1. WAT NES AND WATER SERVICES SHALL BE CONSTRUCTED TO THE EXTENT SHOWN ON THIS DRAWING. STORMWATER 2. WATERLINE STUB OUTS SHOWN ON THE DRAWING S( CIDNEO CONSTRUCTED PER THE DETAIL BELOW. DEC 02 2004 SANITARY SEWER 1. SEWER LINES AND SEWER SERVICES SHALL BE CONSTRUCTED TO THE EXTENT SHOWN ON THIS DRAWING. 2. PROPOSED SEWER LINE "A" MUST BE INSTALLED AND OPERATIONAL BEFORE ME EXISTING SEWER CAN BE ABANDONED. ROADS SHALL BE CONSTRUCTED TO THE EXTENT SHOWN ON THIS DRAWING. INSGLL TYPE III BARRICADES AT ALL STUBBED CUT ROAD LEGS. AND WHERE TEMPORARY TARN —A —ROUNDS ME SHOWN. INSTALL TEMPORARY RIPRAP AT LOCATIONS INDICATED AS PER 'TEMPORARY ENERGY DISSIPATION RIPRM DETAIL'. RM MD STORM DRAINS MD DETENTION PONDS SHALL BE CONSTRUCTED TO THE EXTENT SHOWN ITN THIS DRAWING. COIISWUCT V—DITCH SWAIE AT LOCATIONS INDICATED. MAINTAIN V—DITCH SWAIE UNTIL 2ND PHASE CMSMCT N IS STARRED. THE V—DITCH SWME MLL MAN NEED TO BE RELOCATED IN SUCH A WAY THAT THE SIOtMWATER STLL DRAINS TO THE DETENTION POND. DRIB OOVEE{R.LLOOT{GRADING FOR ENTIRE SITE TO BE COMPLETED IN PHASE 1. EA[L RO5101!RACONTRD_ METHODS TO BE INSTALLED IN PHASE 1, PER SHEET CS200. V—DITCHES TO BE MAINTAINED BY THE DEVELOPER. G—DITCHES ENTERING DETENTION POND SHALL HAVE TEMPORARY 6- DIAMETER RIP RAP INSTALLED 6 FEET WIDE. INSTALL TYPE 3 BARRICADES WERE ALL SIDEWALKS TERMINATE CONSTRUCTION`.. Roll/PHASE 1 m we I WATERLINE STUB —OUT DETAIL A i Ch La w. City of Loveland, Colorado SUCK REVIEWED BY ' CITY OF IDVETAND — Sr. Tramportauon Engineer PROPOSED Br. DATE DETENTION POND CITY OFLOVTIAND — *Wr/Waetewater Engineer BAG DATE:— o '25' ELCO Water DiiBr: ORY OF IOALND — Sormwalx Engineer DU : F UTILITY PLAN AP OVAL CITY OF LOWIAND — Fee Marshal pZp U APPROYID: DMbkt Marogm BIG DATE— CRY OF LOWILAND — Electrical BginMNrq I Superviho W 0 wC — Date Or MR:_ J LL x D. CRY OF LWELWO — CuCurrent Planning Division COUNTY R D 52 ALL CHMGES, ADDEND AND MHDDFI ATOMS TO : DEt CT S ESE WO DRA'MNGS MUST BE WRITING. BY THE ELCO •-. 1 BOXELDER SANITATI UTILITY PLAN APP APPROWD OWD. IN AMR DISTRICT. BY. DATE— W M 4 0 O = r g a i J U i6 e2 kU� Q. The CRY of Loveland review sometimes compliance with the City's Development Standards. Review by the City does not constitute approval of the plan design. This wine does not constitute review/approvala of any private an —$Re improvements which may he shown. DISTRICT OVAL p6pNECT w. 614003 P rick Mmerwr Dote These Plana are intended to be for Nty review of public imprommenis adjacent to the sho V CaneWMion I site private improvements canner w anm all ALL CHARM ADnENO AND MODIFICATIONS TO DRAWINGS MUST BE API DEAE IONS HIM ROVED. IN required Dame worxsMat or study(s), final development plon(e), special reniew(e), Grid building barrels) are complete, approved oral on file with the Es, of Lovemad. DRAwwc xD. !w0"l 00 WRITING, BY BOXIEDER MUTATION lA0 1 DISTRICT. .SHEET 3 0E 3''- l ILl �► UNINE' �■■■■1■■i 11111118 ��ot�t► � .'o'er°o' �, 7ra E � °e`.O..o�.oAAiJ... �cc c���c���A,��.� ,.� 111114111111�OJJAAA••.�vAO� . 7 . 40 �MA NW�. IV4�i c ��������� Co�� v • %.oDIN N ..MW . e.� .. ,> .EMI call VICINITY MA NOTES I LF SILT FENCE 76 111 1 IN, oil TRAC ia LEGEND Nunn UNITS OF CONSTRI "MUSED FLOMME �fln NEW PIECE CONTOURS �, I � 11�'i;',�gWli: �II II-'—l�. II�� � �, �,1`�� �\ ����e''•��•V�. .. . _ __1 f .� ♦ `AAA SA'' mil''�IIII ♦ ��'�O ti�l�►`o iY I''J!im�Ii i it fi H I�� _ , ���► -X— MY PENCE GEOTEMLE LINER �W BALE CHECK DAH IINis ENRON CONWROL FABRIC GRAWEL WIDE. WI NOW'MAIN BANLE INLET nLM HAY OR MAW DRY MULCH �I Wt �� • BY •11• i . r-- .I ICE I�il�f�\\ \r`i �, �1 •: City of Fort Collins, Colorado 0 A =i �EEv�'rlll I--aUTY PLAN APPROVAL [-- �rOI_I�I : �► . �I= II '� /11� ii ��eC _ . 9 AIR ,WOOL Eli Date CHECKED BY. 0 zu � Ili MOW CHECKED BY. .� \'' lllrr'�w`iili'�aers�' j =ice i ,�fi� I1�il ��� . ME IIIII�► �► UNINE' �■■■■1■■i 11111118 ��ot�t► � .'o'er°o' �, 7ra E � °e`.O..o�.oAAiJ... �cc c���c���A,��.� ,.� 111114111111�OJJAAA••.�vAO� . 7 . 40 �MA NW�. IV4�i c ��������� Co�� v • %.oDIN N ..MW . e.� .. ,> .EMI call VICINITY MA NOTES I LF SILT FENCE 76 111 1 IN, oil TRAC ia LEGEND Nunn UNITS OF CONSTRI "MUSED FLOMME �fln NEW PIECE CONTOURS �, I � 11�'i;',�gWli: �II II-'—l�. II�� � �, �,1`�� �\ ����e''•��•V�. .. . _ __1 f .� ♦ `AAA SA'' mil''�IIII ♦ ��'�O ti�l�►`o iY I''J!im�Ii i it fi H I�� _ , ���► -X— MY PENCE GEOTEMLE LINER �W BALE CHECK DAH IINis ENRON CONWROL FABRIC GRAWEL WIDE. WI NOW'MAIN BANLE INLET nLM HAY OR MAW DRY MULCH �I Wt �� • BY •11• i . r-- .I ICE I�il�f�\\ \r`i �, �1 •: City of Fort Collins, Colorado 0 A =i �EEv�'rlll I--aUTY PLAN APPROVAL [-- �rOI_I�I : �► . �I= II '� /11� ii ��eC _ . 9 AIR ,WOOL Eli Date CHECKED BY. 0 zu � Ili MOW CHECKED BY. .� \'' lllrr'�w`iili'�aers�' j =ice i ,�fi� I1�il ��� . ME IIIII�► 2 D 8 SRI a�£ STANDARD EROSION CONTROL CONSTRUCTION PLAN NOTES: CONSTRUCTION SEQUENCE SEEDING CHART STRAW B S STARED Table 11.2. Recommanletl Species and Application Rates of Seeds MM STAKES SEQUENCE FOR 2003 AND 20U4 ONLY for Temporary Vegetation and/or Cover Crops. 3I 1. The City of Fort Collins Stmmwatw Utility woslm control knows a moat be noHRed at °9° PER TMNE �V least 24 hwm prior to any CanslsucUm an this ate. INDICATE BY USE OF A BAR UNE OR SYMBOLS MIEN EROSION CONTROL MEASURES WILL BE AT POINT A MUST BE V INSTALLED. MAJIXt MODIFICATIONS TO AN APPROVED SCHEDULE MAY REQUIRE SUBMITTING A °�°�°° Swean 1 Drlled Pounds/Acre /2. MI requlrM perimeter silt fencing shall be Inaldled pool to any land dialmNin9 activity NEW SCHEDULE FOR APPROVAL BY THE CITY ENGINEER. HIGHER THAN ( Anneal Rn9rase Cool 20 PANT B j5„a-'yj$+rT� (sl0ckp1 Inn, alripping, grading, etc). MI other required erosion onlrol measures Mall be oah Cool 70 aldled t fire appropriate time in the conabuclian eaqurnce as indicated In the approved project schedule. construction plan% and s ton control report. 3. Pre -disturbance vegetation shall be protected and retained wf wvc possible. Removal for disturbance of existing vegetation Mall be limited to Me ore; requkea for mmediote construction operations, and for the shortest pactical period of line. 4. All wile expand during land disturbing activity (stripping. grading, utility installations, stokpcenIn9. idling, etc.) shall be kept In a roughmetl condition by ripping ar dladng along land trust India mulch, vingetution. a other permanent exrosion control is instilled. No soils BE are Outside project street rights of way andl remainexposed by land delurbhg activity for more Man thirty (30) dad before required temporary or permanent soelon control (e.g. seed/mulch, landscaping, etc.) Is Installed, unless otherwise approved by lure Storm seter Utility. 5. The Properly Nall he watered and maintained of all times during construction aalstlee w as to prevent wind -caused erosion. NI land disturbing ac0v0lee about be mmetliatNy discontinued when fagRNe Arch Impacts ad)Nwf properties, as determined by the City of Fort Collins Engine ng Da rw ent. 6. All temporary (structural) eroalon canbul mwwres shall the inspected and rpoired or cosonstructed as necessary after each runoff event In order to assure cantk ed performance of their Intended function. All retched unsnarl particularly Masu an so rail surfaces, shal be removed and disposed of in a manner and lomtion a as not to muse their relwse into any drainageway. Z. No soil stockpile shall exceed ten (10) feet A height. All cell stockpiles °hall be protected ham segment transport by surface roughening, watering, and pMmelw sit fencing. My sal stall remaining otter 30 den °boll be faded and mulched. B. City Ordlnancehprohiblts the tracking. dropping• or depo9ling of sods or any other material onto City atreeb by a from my vehicle. Any Inadvertent depasked material shall be cleaned Immediately by Me contractor. 9. All disturbed areas Mall be reseeded and mulched. 14JI - II I_II)i_v�4111 SECTIONQ PLAN VIEW BACKALL 1. INSPECT, REPAIR, AND REPILACE. lu'=1h=11� IF NECESSAIR ME FILTERS AFTER I -II=- 1111= 2. ALL BALES MUST BE REPLACED AhTER 12 MONTHS UNLESS APPROVAL IS GRAINTEXT BY ME ENGINEERING DIVISION FOR LONGER 01 PROFILE VIEW EROSION PULP. CHECKI:e As CURB III BRAWL FIETER CMDREIDE RE SCREEN BE Nis (ADDED Ir • YEAR 2003 2004 Jul Aug Sep Oct Nov Dec Jan prof Mar Apr May Jan Jul Aug MONTH 0VERLOT GRADING wes WIND EROSION CONTROL Soil Roughening aw Perimeter Bonier Addnio of Barricre Vagelatiw Methods Son Swlant Ocher RAINFALL EROSION CONTROL STRUCTURAL Sediment Trap/Basin NeXT Inlet rulers Strove Barriers Sit Fence Barierallow Sand Bags Bass Soo Preparation Cwtmr Furrows Ter .Toy AaPhall/Concrete Paving Ocher -Gravel Mulch VEGETATIVE: Permanent Seed Planting Mulching/Sealant Temporary SeM Planting Sod Installation Netthg/Mate/Blankorm O(M1er Cared Rn Cool 10 %so( - center Cad 40 %cut - Spring Cad 60 Bailey Cad 50 Mulct Wmm 30 Hybrid Sudan Worm 15 z Sorghum Wmm 10 ED - Cod season grosses make their major ro Rdh IT�hhe spring. Warm amson grasses > n make their pr growth In late spring d summer. Table 11.4 Identifies planting ¢ dates for perennial and temporary/cover crap grosses. Table 11.4. Planting Dates for Perennial and Temporary/Cover Crop cremes. DATE PERENNIAL TEMPORARY/COWER GRASSES CROP GRASSES ra DE v ern - o Warm Cool Warm Cad 6 Jon DI - Feb 2d Yes Yea NNo 01 Mar - May 15 Yea Yee Nao Yea t 8 2 May 1a - May Yea No Yea No �p Jun 01 -Jul 31 l Na Na Yea No =syz 4 Aug 01 - Mg J No Yea No Yee i by ]d 1iilu4 Sep 01 - Sep 3u No No No yes qG y �4ybWea Oct Of - Dac 31No ' Yea Yea No EM Mulching Mdl be used to Deals In establishment of vagaatian. One or more of the d �' gbh$ followkg mulches shall be used with a perennial drNand grace rued mixture or a ¢((¢yy .$ �d°� q temporary wgelo Ion or cover crop. 5:2 38544E Mulch Acceptable Dates of use Application Rate Straw m Hay 1 Jon 01 - Dec 31 1 1/2-2 tonal Hnrmlk (wootl &paper) Mar 15 - May 15 1 1/2-2 tone/acre n Eroaon control DID or blankets) Jan of - On 31 Not applicable RUNOFF Hay or straw mulch Mall be free of noxious weeds and at twat 50% of the flow shall be 10 Inches or More In length. When es ing with native gmsms hay from a native z I grass Is a euggae'tol mulching material, if awlloble. R it Ad CURS INLET WIRE SCREEN if Irrigation a used. hydraulic mulches may be applied Iran March 15 through Sep X. J 5�fm ul w GRAVEL FILTER I 2'x4' WOOD 51UD, war EROSION CONTROL SUMMARY Hoy a Straw Mulchti Ga J z �i I PLAN VIEW SECTION A GENERAL NOTES A 1. INSPECT AND REPAIR FILTERS AFTER EACH STORM EVENT. REMOVE SEDIMENT MIEN ONE HALF OF THE FILTER DEPTH HAS BEEN FILLED. REMOVED SEDIMENT SHALL BE DEPOSITED Y1e °"MN Nleswlw AFiaMI a m A41MET d saf�MATs straw mulch will be anchored to the col by one at 1. Hay or,following Me Idlowinq methods: (a) A crimper which will CRnp the face four In<M1ea or more Into the soil. Al least BOX of the hoer shill be 10 Inches or more In length. 11F�7 ginirLIU l qA0 1 1 - % Q. M, K %i 85.0 BSR %2 tIJJ.BR a n -N. W. ra, 051, asp sal aC.2 %2 %e t24TTe IN Art AREA MIOUIAMI hU A xuwanh VANN Ut mncn FILTERING MEASURE. (b) Manufactured mulch netting Installed over Me bay 2. SEDIMENT AND GRAVEL SHALL BE IMMEDIATELY REMOVED ` a strow according to manufacturers Instructions. FROM TRAVELED WAY OF ROADS. (c) Takliless prond an the mulch to the EROSION CONTROL-CM-DILET GRAVEL FILTER `Eq manufacturer's rw mmendatim. 2. NI air" or hay moat be Me of noxious weeds. m �NDPTDIDS• Is CRFnON: 1 RMIT NOTES CLASSIFICATIOIJ, AND GRADATION OF ORDINARY RIPRAP , 1. SITE a. Single as multi famly moWential nonstmction which canasta of owriol Wading, affair wok VOTED nTwsa era oxx roadway canebucllw and the ca etlw of a Mwtlm/d twtim pond. VAR � run - lhmw e anwes lie rar: erI. nine ea activities are Drubbing necessary In ry f followkg erWmtw 1. Clearing ands are pI necessary far perimeter cma. was 'C 2. Inatallotion of existing canVd% 3. DmOltion f structures w� 4. Overiot grading Including temporary dlveraon awales. .= 5. Grading of detention/relentim facilities B. minty construction - Including strum hxlrn sum FILLsac A 2. Roadway conalrucifan B. Stabilization, Including sending 9. Rmowl of contrd su SECTION 1-A C. itch site con44.95 aces. All 44.95 a""of Me site are expected to undergo INLET PROIECTIIX2 m deadn9 and/a grading. ASK TO ell l'R1ILF LL10jai� • d Raemal C• 0.20 Defoe caneWcllm, Rational 'C' 0.63 Rw construction. The . y IFW rypRME s@, AT VA41 5g pflSOR a of Wa elwu a STadS EdN1 ro OR w Door�TK arrc DECIDE PmwrEAL ° ° t E Tra-1 ewKrou wmu .lnM T r F AAA � of site lies within the Moderate Rainfall Erodbdily Zme and Low Wind Erodalllly Zane pa the City m paFT®1, j RO.... Rrwv a a mm w sWIMR sru aW a♦➢liMlpll nWI 1HE a � ON KLMO /chip) CLASS b• To - lap a w - No So 25 - W 10 e 2 - 10 <1 d 12 ITT- am 4410 W - TO 275 25 - M To 12 2 - 10 3 a 10 led IVS W - To m 23 - 50 Us 1B 2 - 10 to L 24 Ion 35W A- A not 24 0 35 A • a A n bro, -" "-" of Fort crime zone mope with the existing site Mapes of approximately in to ON the new Wprotanmla BID be wbjacled to both wind and ra nfall erosion. " NXw al 4 To1 SlaEe OR c ROPE F Y ue sfinez I 1 1\ 1 No Theo ederw opmenl property canakls of war farm land Before conebucllon, Me site g.asesa and <Onaisled f farm Iona with uw weeds. • P swrma L There are no antkipatW pollution coal More will be no veblde storage a leaning on site. There will be no chemical storage on site. ' ,none m„ ue uorn:rymeu r,m,-awn,wurw wny,n.enm a. VHe...Wy.. wil ANTS MT�T We s nw wow van rsdrnm rrsDEr Pt•M era ,xhovEo nr�a rDEr ES WARN IN � ONCE nvE sravr° 1,[w summ. W mere rru w ��°6 es n The downstream receMng wales Is d Larkns ma wflo County Cma. Standswater mnolf d} xunawor wnp `VII nnv a, from Me dmeloped "aimof the site will be trawated to on corl detention/retwtim J i Mae NeXT n E TV A0 n riu.mr's">wUNF z" . END" cow °1'N puma by curb a guua pipes. channel: and overland street flaw. a Now � Real nv S or 2. SITE MAP: O SHALF See Drainage d Erosion Conlyd Plan O Y.�ACCUMULATED sa RUCT w ES ° a 1 CALLUTIL1TYtanNCKTION Z tlQIM 3. BMP'S FOR STq WAMR POLLUTON PREVENTION: CENTER OF IpLORAW < 1. VEHICLE TRM w MAT SHML BE ICI m veErosion and Sediment Controls: Sou an Erosion Cbal Notes and Sequence Table (this 1-800-922w1987 AT EYdY pIIRINCF/FA! To ME COHSIRIICMI SITE *set). ) SLCI� 2. Nw1G1£ 1W.CMHa MIT SWl1 BE WINENND °e�G80m an arA�v� AS Nr m PRLOTNT ANY WTMa•L mill BEwa b. Matia la Handling and Spill Pmtlw: Meats " Mould be undertaken to control building Z Z TRA IDED aao PN SIMET. materials and waste, and disposal of excess apholl and canaete to ensure these neutral do varew rAUTunea. LL JO not lean the site and enter Me detention ponm d which eventually Uets to Feral Gesk `I�' 3. M WY .AND office IMIM3AL mum. WAPPm Asphalt, Concrete. building material. waste, and deanup by-products should not be discharged k Y' OR Txsatm mlD arc 511RET SIagL BE IMIMIvmY Into Me m-site EVN Mats and slam sewer systems nor Mould they after the off -site F Ed detention pand. In the event of a spill from the site into an on -ale curb inlet or alarm sews City of Po Collins, Colorado THESE PLANS HAVE BEEN RENEWED BY K p p THE REWEWME LOCAL EDOES NONEMY TIMPLYEPT ONLY. d2 fU antem, appropriats meawree Mould be underbken Inlmmfataly to roman Me willed materiab I1T3WTY LAN APPROVAL 0 = rbO STATE CLASSIFICATION FOR NOMINAL and pewnl future pink ban mounting. C ¢ZO $ APPWAEb. RESPONSIBILITY BY THE REVIEWED JJ(( STONE SITE, ilk q. FINAL STABNZATON AND LAIC -TERM STORMWAIER NANAGEIAENT: Pl BoMaeer M4 DEPARTMENT, THE LOCAL ENTITY . 1 Fy ALL EWES WILL BE 'TOED' INTO ABOVE DIMENSION a. Sae Erosion Control Notes this Meet far final stabiizalion measures to can" Pollutants CHECKED Bi ENGINEER, OR ME LOCAL DITTY FOR w p Z 0 h awmwater discharges ACCURACY AND CORRECTNESS OF THE 'ace Z IU W 9 letw t RMwelw DOflt3 Mb CALCULATIONS. FURTHERMORE, THE o 7 U S RIP -RAP TO BE GROUTED, RENEW DOES NOT IMPLY THAT GROUT SHALL BE IN ACCORDANCE TO S. OTHER CONTROLR MEMO BY: OUANTTES OF ITEMS ON THE PLANS ASTMC1107-LATEST REVISION. a. Measures should be undertaken to remaw excpas waste products M1om the site and Mo ter UlitlLy Dab PIroJELT tp. GROUT SHALL BE VIBRATED IN PLACE Iyy�/4. MIFe 4vm depose of Mea¢ weals materiole oaf -site in an apPraprlala manner. In addition. measures ARE THE FINAL QUANTTES REQUIRED. TOPS OF EXPOSED RIP -RAP WILL BE (AA should be undertaken to limit off -wile soil tracking of mud and debris spilage from whiles MEL BY: THE RENEW SHALL NOT BE CONSTRUED 6�4003 VET BRUSHED AND CLEANED OF GROUT Imeng the site. Mud and debris Mould not be tracked along roadways and allowed to enter P IT BRerotlaA Deb IN ANY REASON AS ACCEPTANCE CIA TO EXPOSE RIP -RAP COLOR. IF MN. p FINANCIAL RESPONSIBILITY BY THE DMWNG No. on-prateded drainage wan which discharge eventually into Ma Calla La Padre River. tY1EIXFD BY: LOCAL ENTITY FOR SADDITIONALSHOWN C�vAyw50 B. INSPECTOFI AND MAINTENANCE: BoMn°w Dale QUANTITIESDECLARED OF ITEMS SHOWII THAT MAY I.AJJLLLL RIP RAP DRAIID'IG VEHICLE TRACKING MAT a. I6 of Me and maintenance should of be Inn Ser l a regular bawls as milked In CHEtl(f0 BY: BE REWIRED DURING WE Section B of Ua Tends and Conditions al Me CWS Gmwal PermlL Osb CONSTRUCTION PHASE. SHEET II OF 3 No Text (LMIJAND Y-2) (Wnf�ll[n) F I IH:IV H1:1V LLI SPILLWAY I Nk1V NTS N61V 25' S SECTION A —A L NTS EKTEND RIPRAP 4 FT. EACH SIDE OF PT CREST POND j WEIR LENGTH (TtJ TOP OF WEIR ELEV. WEIR WIDTH (It.) OUREf •D DEPTH OF A B' C FLOW OVER WEIR I 200 5021.70 5.00 020.70 LOFT POND OVERFLOW W�IR� To K )dTtkD�� NITS IN Aso Z - RE C INLLT If SE MESH GRA1 UEV = 5020.T (100YFAR visa 3/16• STEEL PULE 1/2• SELF ANCHORING e RCP N - 5017.TS mnc . 4( Iffs I6 re4i oM SECTION E-E f ORMCE OPENING TABLE 1 FOR DM. TABLE 1 ER ES) �Na CONSTRUCTED POND ID STWW2 SEWER OVERFLOW PIPE STORM p 121Z2 ONLYOVERFLOW PRE STORM D I AND IIOVERFLW PIPE STORM D 1 I, II PND III ORIFICE PLATE DETAIL STORM D — OVERFLOW PIPE mmmmmmmm 1,WW C*xNLn M mingin AmtivE SNx AN CMmN. m amlm w eenertle I •xvm ulmmAxvn mm lma�Nrovm N'M M 1g0.M 11m. H Q ME GAUGE SW11 BE CONSTRUCTED OF D PRESSURE TREATED SQUARE POST MEASURING H - 1.)3-(n I MY) 6•x 8' WITH BOTH 8• SIDES ROUTED WITH 60 x - I" "m I Am 0 NUMBERS AND GAUGING MARKS. (SEE MAL x = 214' (g L S AND II) AM.) THE ROUTED MARKINGS AND NUMBERS SHNL BE PANTED WITH WHITE WATERPROOF PRINT SHALL BE ONE FOOT TALLER THAN THE MAMMUM DEPTH OF THE POND. THE POST iHI' POST SHALL BE EMBEDDED IN CONCRETE aAwW M�-'YTH A DIMENSION OF 16•x LIN 3' IN DEPTH. THE GAUGE SHALL BE PLACED NEAR ME DEEPEST AREA OF THE POND, AND SELL BE POSITIONED SO WIT IT CAN BE READ FROM ME NEAREST POINT OF PUBLIC ACCESkS. THE mxFaW -HORDING DEPTH DEPTH SHALL RE REFERENCED TO THE 14DEEPEST POINT OF THE POND, POND Miami GAUGE 2 1/20 x 2 1/2• As 3/e0 2 - EACH SIDE W/ 3/4• GALVANIZED ANCHOR BOLT EMBEDDED 6• "1 12• (TYP.) 3/4• REA ND OR SQUARE ROD CONTINUOUS NUOO ffz�o TO E SPACING TYP. 5 REEDS) N 2M ORIFIM/TRASH RACK SW Porfpmbd PIoM�� jT� ♦ m 1/2•x3• R TYP. —� NOTES: 1. ALL STEEL USED FOR THE CONSTRUCTION OF THE TRASHRACK SHALL BE HOT DIP GALVANIZED AFTER WELDING AND FABRICATION. 2. CONTRACTOR SHALL FIELD VERIFY ALL INLET STRUCTURE MEASUREMENTS PRIOR TO CONSTRUCTION OF TRASHRACK. 3. TRASHRACK TO BE CONSTRUCTED IN ONE SECTOR. 4. ALL STEEL IN TRASHRACK TO BE A-36. TRASHRACK PLAN O.S. RIIM Stom"s vex Wen-vran As equip Per Tadn No-]. Bo-2 GROVE Arerinin Slams nuct al 2M CAprael Famed QUANTITIES BAR LIST FOR 11=2'-60 FOR ONE— INK AND RFNMNG IIIMPAM N AND NEED rT m n o r4 No m rT M o r4 'r ED I r{ II Ell 2 Pa IS in PT In IN 2 rd 11 IQ 3 rT I4 IY 3 r-5• m Im 3 rr B A ra u IN 3 rf IW r4 v wM e r-r 1 2.7 M 5 r4 Go 215 6 x•-r 31 41 e n ANA..»1w. dorm Tu Trash Rod DER 6• Cmyn wAx �,, IAg. IBNm rim x ra r-U• rim a r-r rim � Is•-r ImeAE gRo®x v r m2 sow r xaAa a x aaE r-r. _r Im OE v BA va Rm xaAw a x .BEEN r-r RLWrs m RE lyi GA CN m BEND mm FIRES As REtVIFP 4G2 In [AGEWU BE EX ALI al® Ross 4FFI PPATF rfl AN lcc insist of tltle 4q5 (nm HI) a FtOw MNmoL CR ME PU E C1SM.'E OW . 6b• fYm D Is &3 ORIFICE Cog 6' CONSTRUCTION r1 RUAS INm D OF CM )(mM COISIRYCTIOx Of F5W5 4 I AND Nm In) Trash RM Onion ' 9/ HmNIbM R51! CION A. OWMI RP 3r IN .A -a so ♦. 3' Section A -A Fmm Rpro a Censor Cpiiip QIM g1HER)ToV CHANNEL An/LHLU TO cEEDS m wnEramAvr wens 4 Standardardized Trash Rack and Outlet Des'gn For WQCV Outlets With ircular Openings ` W vRE" i UN.S. P BWa :A '. Nw U 9m5s • � ,ivr s Tar j or Eqm* We. r / Tlvlr ROLL Mtrled ,. �'L V/R.,LLILA'tlnY4WR- YF. Ra. YYIl19 N IiaM Section B—B — Plan View 0.13r 6.INo• Fmm Rgum 6. Cimm Ogadpst Gry Section C—C IYNN for Inia SWnrh and 0. 'gn. Fmm Fly 6. Cmn ga ONE 1. All 1. ay pninga are erosion.R Wb . (Mirtular men Gorr/ (grow Cook oreo) - AEG 2. Msvnorm dameler or womiq - 2 won. MS. FUND St Paw, Mnneaom. U5A DETENTION POND OUT L DETAIL -b To BE IA5TAueA IN P445E 2. CNy or Fort ollins, COloTedo UTILITY Pr APPROVAL THESE PUNS HAYS BEEN ENDING BY THE LOCAL ENRTY TOR CONCEPT ONLY. ME APPROVED: RENEW DOES HOT IMPLY RESPONSIBILITY BY City Engineer Dote THE REVIEWING DEPARTMENT, ME LOCAL CALL UTILITY NOTFlCATION CHECKED BY: I ENTRY ENGINEER. OR ME LOCAL ENTRY FOR CENTER OF COLORADO Wrier A: e"oter THIN, Dale ACCURACY AND CORRECTNESS OF THE 1a800a9224987 DOES NOT IMP FURTHERMORE. THE REVIEW CHECKED BY: DOES NOT IMPLY THAT E FINAL QUANTITIES ITEMS _ Slam aler UUI'Ry Oste ON ME Pf ME ARE THE FINAL OTHE Fy rwaw'aBEnaie CHECK RI BY: REQUIRED. THE RENEW SHALL NOT BE MEGAIER mm66. Pao Rmresbors GETS CONSTRUED IN ANY REASON AS ACCEPTANCE CHECKED W.- OF FINANCIAL RESPONSIBILITY BY THE LOCAL. Trdek Enmileer DWe EMITY FOR ADDITONA, QUANTITIES OF ITEMS SHOWN THAT MAY BE REWIRED DURING THE aHECKED W. CONSTRUCTION PHASE Oslo (O Z Lim �UJ Of GO O� a K . a o azE t a7U PROJECT NO. 614003 DRAWING NO. CS223 SHEET 14 OF 3 0 HYDROLOGY TABLE Design ompoaiLe Point Basinls) Ama(acm) "C' Q2 IGN) gtgp(da) 1 1 1.18 0.65 1.78 8.89 2 2 0.76 OAO 0.64 2.51 3 3 0.37 0.65 0.67 2.85 4 4 GAS 0.50 0.53 2.50 DRAINAGE INLET SUMMARY GENERAL DRAINAGE NOTES 5 5 0.25 0.65 0.40 2.00 6 6 2.68 0.65 3.92 18.94 6A 6A 0.17 0.67 0.32 1.42 1. All street sanitary se . storm sew. and water construction snail conform to City of Fort calms standards a d Specificationsr, cement at date of execution of the Development 7 7 2.19 0.65 3.33 16.56 Agreement Enriching to this development. My construction occurring three years after 8 8 2.37 0.6$ 325 15.86 execution of the devN Indent agreement mall require re-examination of the plans by the 9 9 1.40 0.73 2.52 12.11 City Engineer who may quire that they be made to conform to standards and specifications current t that time. 10 10 D76 0.67 1.58 2. The type, size. Iocae and number of all known and«ground utilities are approximate 11 11 0.32 0.87 0.58 2.77 67 2.87 s shown on the drowiods. It shoe be me responsibility of me contractor to verity the 12 12 0.94 0.67 1.56 7.69 existence and location l an underground utilities along the halite of the work. Before 13 OA1 0.67 0.74 3.42 commencing new canalction, the contractor mall be responsible far locating unknown 13 udrround utilities 14 14 0.67 2.23 it 3. The Engineer who he prepared these plans, by execution and/or seal hereof, doss 15 15 2.32 2.32 0.57 2.80 2.80 13.35 hereby affirm responslbill@y to the City of Fort Collins, as a third party beneficiary at sold 18 16 0.31 0.67 0.57 2.58 Engineer's work, for an Arcane snare and omission. contained In Nero plane, and approwi of 17 17 1.00 0.67 1.63 7.82 these plans by the Dire or of Engineering wool) of relleve the Engineer wM10 has prepared Further, Engineer hereby these plans of all such sponsibility. the agrees to hold alms, is 18 0.95 0.67 1.63 7.89 harmless all liabilities. and demands which may orbs from any errors and 19 19 2.01 0.65 3.01 14.89 omissions conmmee In these plans. 20 20 1.40 0.85 2.17 10.40 4. Prier to commencement of any construction, the contractor snail give fie City Engineering Department (221-6609) and Erosion Control Inspector (221-M89) 21 21 0.94 0.85 1.46 7.14 (wanly -four (24) hours adwnaw notice. 22 22 0.98 0.70 1.80 8.51 23 23 2.58 0.70 4.11 19.90 5. Maintenance of onsite drainage facilities shall be the responsibility of the property Owners. 24 24 0.53 0.73 0.97 4.78 223 ) GAS 226 10.40 6. All recommendations of the final drainage and erosion control study For the 25 25 development by Sear -Brawn will be compiled with. 26 26 0.35 0.73 0.72 3.16 27 0.89 0.73 1.67 8.04 by me City, c«HBcaem of the drainage 7.27 Prior to final Inspection and Ronal once fo a rwgistered professional engineer, moat be submitted to and approved by IodllStor 28 28 0.88 0.73 1.38 8.14 w the stormwm«umuy. 29 29 0.07 0.73 0.14 0.63 a. Far =pm sad mot-iamlly developments, C«tial of an drainage facilities 30 30 0.13 0.73 027 1.17 shall be submittedto me Stermwater Utility at least two weeks prior to the release of a 31 31 2.06 0.70 3.56 n.15 certificate of occupancy. inedto lotcertification.specified In thedespoilment agreement,utuily at least two weeks prior to the 32 32 0.07 0.85 0.17 0.70 POND SUMMARY elea a of a,nenust a 1euof occupancy such lot. car o«u 33 33 0.18 0.86 0.43 1.79 .� a A b . E�IllkdlM uficatlon of all drainage facilities shall be 34 34 0.32 0.85 0.73 3.18 submitted to Storm ater uuuty m deeardence with ail conditions as prescribed by the t 1.09 aewlapment agreelnsZtiogsagate l with all condNims as prescribed by the development 35 35 0.11 0.85 0.26 agreement associated with this development. Individual lot certification, as specified In 36 38 0.11 0.85 026 1.09 the development agr nint. must be submitted to me Slormwater Utility at least two 37 37 0.62' ,/ 1 0.85 126 weeks prier to the rElou of a certlficote of occupancy for such lot. 37A 37A 0.45 0.85 0.85 4.34 4.34 B. If dewatering is µpea Install utilities, a Stage Construction Dewatering Wastewater Discharge, is if discharge Is Into storm irrigation ditch, Point relquir a sewer, channel, or 38 38 4.28 0.28 3.18 14.11 any water. of the united totes. 39 39 0.63 0.85 1.37 6.08 9. NI construction pallet a must comply with me Stale of Colorado permitting process •Stormwoter 40 40 0.31 0.85 0.75 3.08 for Dbcho Associated with Construction ActiNly.' For Mformatlon, please 41 41 0.47 0.85 1.13 4.68 tact the Colorado D dment of Heath, Willer Quality Contid DMalon, WOCO-PE-B2, Q00 Cherry Creek Drive tie, Denver. Colorado 80222-1530. Attention: Permits and 42 42 0.86 0.35 0.57 2.61 Enforcement Swedish. Pe: (303) 692-3590. 43 GAS 0.85 1.08 4.48 43 to. Bmchmork3: L«o my survey. 44 44 1.41 ( 0.85 3.08 14.03 Vertical oowm: 45 45 0.49 0.85 0.98 4.37 B.M.Number Ncw 192) adjusted. Elev.- 5071.90. Description: City of Forl Callas 92-14, Northeast corner of County Road 54 and County 46 46 0.19 0.85 I GAS 1.89 Rood If. an the tap o1 igoeon structure. 47 47 0.37 d 0.85 0.80 3.60 Horizontal Datum: N=1.470.181.54 E-41 .305.63 48 48 0.18 1 0.86 OA3 1.79 Description: Colorado St is Plane Coordinates NAD B3/92 Datum. Horizontal Con" 49 49 0.28 0.85 OA7 2.79 board upon NO pant )l let F1 2.65 0.70 423 20.59 FIA F1A 1.48 0.70 2.33 11.68 F2 F2 1.35 0.70 2.33 11.08 F3 F3 1.12 0.70 2.07 9.72 F4 F4 1.07 0.70 1.94 9.29 ' FAA FAA 0.13 0.67 025 1.08 F5 F5 0.81 0.70 1.57 7.03 '. F6 FB 0.54 0.85 1.27 5.37 F7 F7 0.81 0.70 1.39 8.91 F8 FS 1.59 0.70 2.68 13.37 FBA FBA 1.81 0.70 2.55 13.03 F9 F9 1.98 0.70 3AS 16.88 CALL UTILITY NOTIFICATION F10 F10 2.20 0.70 3.50 18.80 `? CENTER OF COLORADO Fit Fit 1.35 0.70 2.39 11.72 v , 1400w922-7987 F12 F12 3.56 0.70 SAO 27.02 F13 F13 1.31 0.70 220 10.95 ,.aHaenur,,,,� n°"a F14 F14 1.15 0.70 1.94 9.80 F14A F14A 0.24 0.70 GAS 2.08 City of Fort Collins, Colorado THESE PUNS HAVE BEEN REAMED BY F15 F15 1.02 0.35 0.74 3.38 UTILITY PLAN APPROVAL THE LOCAL ENTITY FOR CONCEPT ONLY. F16 F16 0.88 0.35 0.65 2.94 THE RENEW DOES NOT IMPLY APPROVED; RESPONSIBILITY BY THE RENEWING F17 F77 28.12 0.70 56.$4 248.72 Gty Engnwr Date DEPARTMENT, THE LOCAL ENTITY F18 F18 1.62 0.70 3.22 14.04 ENGINEER. IXµ THE LOCAL ENTITY FOR OiEQaD BY. ACCURACY AND CORRECTNESS OF THE 0S1 081 1.58 0.85 2.14 9.96 CCCURA ➢OAN FURTHERMORE, THE "a n Wmtesaler UBay pole OS2 OS2 1.86 0.85 2.59 11.35 - - WECI® BY RENEW DOES NOT IMPLY THAT OS3 083 0.18 0.85 OA1 1.79 ' QUANTITITEMS ON 1-11L I'LANZs �emsOth UaRy i ME THEE FINAL S OF IOUANTITES REQUIRED. OS4 OS4 0.36 0.85 0.78 3.51 CHE4%m BY: THE RENEW SHALL NOT BE CONSTRUED OS5 085 1.13 0.85 1.92 8.52 _ Pah a Remedisn bate IN ANY REASON AS ACCEPTANCE OF FINANCIAL RESPONSIBILITY BY THE OSB OSS 1.02 0.85 2.06 9.27 CHEyJ® BY LOCAL ENTITY FOR ADDITONAL TmHk Deft QUANTITIES OF SHOWN THAT MAY OS7 OS7 0.46 0.85 1.00 4.58 - BE REQUIRED DURING '}' _ CHEII® BY: Dote CONSTRUCTION PHASE. sew INLET NUMBER CONTRIBUTING BASINS FLOW (CFS) INLET SIZE 1 F7-F3 50.45 15'Combinatlon 2 29, 30, F4, F5, F6 7 4.77 10' Type R 3 31-34, F4A, F6-F9 62.94 15'Combinetlon 4 26-28, 39 17.63 10'TypeR 5 2-25 34.74 20' Type R 6 5-18 24.22 10' Canbinatlon 19-21 23.70 10' Type R 8 1-14 13.85 10' Type R 9 8-10 30.60 10' Combination 10 [7 -3, 6-7, 6A, 49 35.29 10'Combinatlon 11 , 37, 40, 4348, OS-6 33.85 10' Combinatlon 12 OS-3, OS-4 5.17 5' Type R FUTURE F1-F1600 6PR{WAhL VOLUME VOLUME POND DESC � -r ELEV. PROVIDED REQUIRED _(� (AC -FT) (AC -FT) RETENTION seal.9e 1 (Filing I only) �^p �a 21'S1 zs 17 BASINS CONTRIBUTING 1-40, 42-45, 49 1 RETENTION PONR 5021.75 21.68 15.51 i-40, 42-44, 47-49, BASINS CONTRIBUTING OS4, F8A-F16 1 RETENTION POND 5021.75 21.68 19.19 1-40, 42-44, 47-49 BASINS CONTRIBUTING 054, OS6, F1-F16 z 0 rc e a �� wy '.a 3J J �a o iu ai= 8 SSA di 16 m� N,�i 1-LL i J z J $❑ Q LL W �w 1- 2 i ai 9wQ w❑X tK a2� »U O