HomeMy WebLinkAboutLot Certifications - 09/01/1994September 1, 1994
Project No. 1418-01-94
Glen Schlueter, Civil Engineer
City of Fort Collins Storm Water Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: 3737 Landings Drive (Building l); Fort Collins, Colorado
The Wharf at the Landings P.U.D. Phase Two
Dear Glen,
This letter serves as final certification for a portion of The Wharf at the Landings P.U.D. Phase
Two drainage improvements in the vicinity of Building H only. (See attached exhibit from Sheet
6 of 8 of the approved Utility Plans for the Wharf at the Landings Phase Two; by James H.
Stewart & Associates; plan approval date 05/18/82).
All street and drainage improvements delineated on the utility plans for The Wharf at the
Landings P.U.D. Phase Two, including the inlet, the storm sewer and the detention pond, had
already been completed with construction of the subdivision infrastructure according to the
approved Utility Plans for the Wharf at the Landings Phase Two.
All drainage facilities in the immediate vicinity of Building H, including the swales around the
building are functioning properly and meet the intent of the original drainage design for The
Wharf at the Landings P.U.D. Phase Two and the Site and Grading plan prepared by Allen D.
Curtis, architect; Plan dated 12/31/93. No modification was made to the original overall
drainage design intent of the subdivision with construction of Building H. Drainage facilities
have been cleaned and are functioning more efficiently than prior to construction of the
Buildings F, G and H units. D
If you have any questions, please call at 226-5334. Ile f q -/t /0so
Sincerely, E� O K J Q. � (� I e ' .eo l I
'00000
-osm 20
Brian W. Shear, P.E.
Shear Engineering Corporation 00000*0
^ .•r ��
BWS / be A1.E�'�
attachments
cc: Albrecht Homes
4836 S. College, Suite 12 Fort Collins, CO 80525 (303)226-5334
September 1, 1994
Project No. 1418-01-94
Glen Schlueter, Civil Engineer
City of Fort Collins Storm Water Utility
P.O. Box 580
Ft. Collins, Colorado 80522
Re: 3737 Landings Drive (Building B); Fort Collins, Colorado
The Wharf at the Landings P.U.D. Phase Two
Dear Glen,
This letter serves as final certification for a portion of The Wharf at the Landings P.U.D. Phase
Two drainage improvements in the vicinity of Building H only. (See attached exhibit from Sheet
6 of 8 of the approved Utility Plans for the Wharf at the Landings Phase Two; by James H.
Stewart & Associates; plan approval date 05/18/82).
All street and drainage improvements delineated on the utility plans for The Wharf at the
Landings P.U.D. Phase Two, including the inlet, the storm sewer and the detention pond, had
already been completed with construction of the subdivision infrastructure according to the
approved Utility Plans for the Wharf at the Landings Phase Two.
All drainage facilities in the immediate vicinity of Building H, including the swales around the
building are functioning properly and meet the intent of the original drainage design for The
Wharf at the Landings P.U.D. Phase Two and the Site and Grading plan prepared by Allen D.
Curtis, architect; Plan dated 12/31/93. . No modification was made to the original overall
drainage design intent of the subdivision with construction of Building H. Drainage facilities
have been cleaned and are functioning more efficiently than prior to construction of the
Buildings F, G and H units. p
If you have any questions, please call at 226-5334. Ile
Sincerely,
Brian W. Shear, P.E'--�
Shear Engineering Corporation
BWS / be
attachments
cc: Albrecht Homes
_...�,,,�,..... O K
J
cQj (eL k`(
5/I J¢
4836 S. College, Suite 12
Fort Collins, CO 80525 (303)226-5334
y
s
N
is I
oT
41111,
I�
ss
II
1
P