Loading...
HomeMy WebLinkAboutSite Certifications - 06/29/2009ADDRESS: PHONE:970.221.4158 NORTHERN 200S.CollegeAve. Suite100 WEDSRE: ENGINEERING Fort Collins, CO 80524 FAX; 970.221.4159 www.northernengineering.com June 21, 2007 Jay Barber Fort Collins Stormwater Utility 700 Wood St. Ft.Collins, CO 80522 PE: Lemay Avenue Estates Drainage Certification Project Number: 110-004 Dear Jay: We have completed our review of the as -constructed major drainage improvements for the above referenced project as it relates to the approved final construction plan design. This certification is intended to verify compliance of the constructed major drainage improvements for the approved construction plans. Field surveys of the site were conducted by King Surveyors, Inc. in December of 2006 and June of 2007 and have been used to verify general conformance to the Plans. The project engineer conducted site visits also in December of 2006 and June of 2007 to verify grading and major drainage improvements\ Based on the survey data provided by Northern Engineering and personal site inspection, we believe that all major drainage improvements have been constructed in general compliance with the design. The volumes for Detention Pond 1 and Water Quality/Detention Ponds 2 and 3 were calculated from the topography provided by King Surveyors. The design volume for Pond 1 was 6.40 acre-feet achieved at a water surface elevation of 4933.50. The as -built pond achieves the required 6.40 acre-feet of storage at water surface elevation 4933.78. Thus, we conclude that Detention Pond I will perform adequately with the design intent. The design volume for Pond 2 was 4.32 acre-feet (3.80 acre-feet of detention achieved at WSEL 4922.66 and 0.52 acre-feet of water quality capture volume). The as -built pond achieves the required detention volume of 3.80 acre-feet at water surface elevation 4922.60. The 0.52 acre-feet of water quality capture volume is not fully provided. The volume between the 100-year water surface of 4922.60 and the spillway crest elevation of 4922.80 is 0.20 acre —feet (thus short by 0.32 acre-feet). We feel this will not pose any problems, as the assumption that the water quality volume is full prior to a 100-year storm event leaves for an extra safety factor in the pond design volume. The design volume for Pond 3 was 0.09 acre-feet achieved at a water surface elevation of 4929.07. 07 C�5' f -,-( The as -built pond achieves the required 0.09 acre-feet of storage at water surface elevation 4929.49. Thus, we conclude that Detention Pond 3 will perform adequately with. the design intent. It is noted that the emergency spillway for Pond 3 was constructed with its crest roughly 6" higher than design. We have provided calculations showing that the 100-year emergency spill from the pond of 3.8 cfs will still be adequately handled by the weir in its as -built condition. Please see the attached as -built information for Ponds 1 - 3, and the attached grading and detail sheets showing as -built information pertinent to Ponds 1— 3. There are minor inconsistencies throughout the site; however, the performance of the drainage design, in my opinion, will not be hindered. To the best of my knowledge the major drainage improvements for Lemay Avenue Estates, are constructed in substantial compliance with the design intent of the approved construction drawings. If you require additional information or analysis regarding this project please contact me at 221-4158 ext.106. Sincerely, NO RN INEERING SERVICES, INC. Aaron Cvar, P.E. Senior Engineer cc: Stan Everitt, Everitt Companies FEB-12-2004 THU 08:37 AN FT COLLINS UTILITIES FAX NO, 9702216593 DRAINAGE CERTIFICATION FORM Please fill out all applicable items in this certification form for single family, multi` -family and commercial properties. Write "OK" for items checked or actual number checked in field. Use "N/A" for items that are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification a. topographic records and volume b. cross -sections and spot elevations -positive fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap -side slopes -grading -orifice plate installation and size -compaction of berm -structural integrity of pond 2. Swales O S -location (are they within easement) 0k- -dimensions and cross-section verification Olr- -longitudinal slopes and side slopes -spot elevations ok�_ P, 03 hEH-12-'LUU4 1HU U8:31 AM HT UULLINS UTILITIES FAX N0, 9702216593 P. 04 -permanent erosion control measures (drop structures, riprap, etc....) .-tie-in to pipes, pans, curbs, etc.... -weir size (elevations, size, opening, etc...) -available freeboard -landscaping infringement on swales 3. Pipes -size and type -slopes (as -built and comparison to minimum 0.4% slope) -pipe capacity calculations if slopes are significantly altered -invert elevations -installation and backfill material -cover -encasement and clearance from other utility lines close by -joints 4. Concrete Pan Chance is -size -slope -super elevation -cross-section -thickness -elevations 41-- ok Z hL-6-12-2UA 'IHU U8:3l AN FT UULLINS UTILITIES FAX NO, 9702216593 P. 05 s. inlets size and type OA' -size of opening (or name of standard used) -grate elevation -invert elevation -box size •-�� 6. Cross pa -size _ type -grade -elevation J= L<< -cross-sectional depth _JJ� -tie-in to curb and gutter Off' 7. Culverts R= -size -type -invert elevation -headwalls 8. Underdrains -size -type -cover -backfill -geotextiles 3 f tb-I&ZUU4 lHU UH:�V Aft FY UULLINS Uf1LlTIE6 FAX NO, 9702216593 P. 06 -cleanouts 9. Curb cuts -size -tie in to Swale, pipe, etc.... �Pt H. Certification of Grade Elevations Adjacent to Drainage Facilities: -minimum opening elevations _=IA- -top of foundation elevations. -comparison to 100 year WSEL's _ (Freeboard requirements and floodplain issues) c. certification of Erosion control Measures: 1. Permanent Measures: -Permanent vegetation (6" bare spots and weeds under control) -riprap -riprap bedding --0�1�-�� -drop sections '= -sediment basins/water quality ponds -netting mats/blankets -mulching Al— A htd-l'-2UU4 'IHU U8:37 AM FT UULLINS UTILITIES FAX N0, 9702216593 P, 07 2. Temporary Measures: -mulching -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. site cleanup After Construction -construction clean up -smoothing of ruts -reseeding Ts. Statement of Compliance This certification is signed And stamped and by signing this form the engineer(s) attests that to the best of his knowledge the as -built conditions of the drainage facilities are as. described in the above form and in the redlined plans enclosed. Failure to properly disclose all known, information could result in the rejection of this certification and prevent the release of any stormwater utility holds on Building Permits and/or Certificates of Occupancy. F. Signature and Stamp by a Colorado Registered Profe'saional 8ngineer. POND #. Elev Acea FICummUVAv-90 CummlLCon_L"c 4934 1.6944 6.8275 6.7606 4933 1.5739 5.1934 5,1269 4932 1.4865 3.6632 3.5969 4931 1.4 2.2199 2.1538 4930 1.041 0.9994 0.9377 4929 0.0311 0 0 '#.Elev'x'CummlTAvCumConic 4923 0.9687 4.2085 4.1641 4922 0.8748 3.2868 3.2427 4921 0.7889 2.4549 2.4112 4920 0.7058 1.7075 1.6643 4919 0.6252 1.042 0.9992 4918 0.5284 0.4652 0.423 4917 0.2005 0.1007 0.0715 4916 0.0009 0 0 POND3 L# Elev Affi-a= ,_ CummliAvHLCumml Con MENMENEM L ft acft 4930 0.0841 0.128 0.1274 4929 0.0644 0.0537 0.0534 4928 0.0431 0 0 i+ sr Gorz�►� a� Ponic a ZZ.Qj Trapezoidal Weir Performance Curve: POND 303 Project: 110-004 Date: 6/28/05 By: ATC Governing Equation: The trapezoidal weir is a broad -crested weir governed by the following equation: " where Q = discharge (cfs) (-0 • where C = weir coefficient 0 = Cw L + 0.8H tail H whereL = crest length (ft) J " where H = head on weir (ft) where b = 1,5 For 4:1 side slopes, 0 = 151,9276' so that tan (02) = 4 Input Parameters: Top of Weir Elevation (ft) 4931.04 Crest Elevation (ft): 4930.56 Length of Crest (ft): 9 Weir Coefficient: 2.60 Death vs. Flow: Depth Above Crest (ft) Elevation (ft) Emergency Overflow Weir Discharge (cfs) 0.00 4930.56 0 0,10 493066 1 0.20 4930.76 2 _ 0,30 4930.86 4 0.40 4930.96 7 0.50 4931.06 10 WSS� 0,60 4931,16 13 h6 0.70 4931.26 17 �t�SJL !tst 0.80 4931,36 22 0.90 4931,46 26 1.00 4931.56 32 A I eg sB \ ®g eg lie also, UFr M lip, LEMAY AVENUE ESTATES J!F ' I NORTHERN ENGINEERING DRAINAGE DETAILS b. = IIIIIIIIIIIIN OR Q yyyyy,,. g� ❑2 C r¢i-O,g a"6 7�7p�a' I I ggaP y\ m t�e e�3[ 3 g"i 4�• X � i� b° � � ' L r i r> � ° M1 p ! ad i dC g g �( �a��•6j � � e ; d 3ii� p � I��l� M1 � ._ t a i A LL- I§ ; tl2igj BI j 7a •9e o to m • i �x t�:� t� m` I Cn Y 1 t o i z =_� t • 90 A ! E� fill W OF Z � ��• e � �I IIII C'a E" II� NORTHERN DRAINAGE DETAILS J l _ EncinEEeiN $,",Fn 3 Gygl�� pi? � Y.pviX £d ;. ,R siz d R ev� $LE i £h LSG Py 8° Pvf g. cR erl o F ''���' Ndoca i.Fvxytvk e $fig �AiZvi yY ofaev aR @a�ScY}a� ry. `" odw 4 s 3s�CSR-'z €i was gdsRrii yM pz i 3 Cd v> 1 Vi g no �yiy:C � 1r1r LBVR7 AVENUE ESTATES G) LNORTHERN N GRADING PLAN W NGINEERING ATCHLINE SE H� EET R,.���, 1� a T �PJ g�gs; %YpE,B{A H�hy '9 5i gy 9 i �H tY f y d R APR i y Es �}N3 �i y f8 M 94! PP' "# .r5 �RAS P � a vtY R >#F a d s �.fi aed gtq b�%id n� a i ��°dRli d p y t ss�� i3� BFsbF9j qua s� Pr.Fn v 0v �iEn ,� 5+yi� HA. „55 9 M t F'a E ff p4 d�qE Rv� ypp �� s YYpps �9y g ��a ro P d�+s : ai s�i i3 y � >�> y tlp9 gH�A aA9�� P�Y9F %ER A'� �st�� 24 NORTHERN GRADING PLAN _� ....,.�...� `NI,.iNi I h r,^ 2,3 " m 1 N • 0� 1 P I i 2 _ \\ I - i I N.I.-, � � ,♦ V�vv A IIIIpII I �� ` vv a -49 \ vy \ I.I II iII 1 / `� f ��aa 492 rJ • • • 21 maul I 49p-p2,i 2 j \\— • J v,l 1. I uIP I / _ 4923 _ 4918 �- - I I I I Y "6- �I.III�JII I I / 49-- 4919-___ �4923� - - 4923 ro _ _ \ Q, �II IIIII 1 I J IY'// _-4918_-_ -4920 �I 11A, 11111��1I � 4gj811 _� I III! ,_--_--_____- -,49 _ -' i I !I - - -4924- 4924 - - _4g2 _ - - - - 24 �rwwrr r � - ! i r 4933- 39 i� I� ` �A, � 44 A —42 — _ — ------a93e�— i _ 2 L — _ _ _ _ — _ -- G — —4942— - _ _ _ _ —4997� _ - — _4935:. I tc,6 i Lb 46 f >. - � "45- ____ ♦\ � J ///,// \ 11 IIIIIII/I IIIII I11/ / /' i /•!I � \ 1 II11 I I I 1 I \ ♦♦\ \\I . 4r_I 11: I I! 11 / / � I 1 � / i !IIIII I! / I 1 II / ♦\ \ I I I III IIII 'Illl�l II 11II III / I I�I III I \\ \ r `♦ it ♦♦♦ \ r � IIIII Ij111 I I � 1 III \9 III I111 _ _ ml Iv II II I II I I N r I� 1 � v I IoI Il 1plq II I I a T IM 1\ O� `Y9 Ifl I l lI a� I I III I� _ ♦\ 1 \♦ III I I r 1' 1 1 F. I I � I I \ I\ I I IIII "� 11% 1 \ \ \ \\1 I \\\ ♦ \\IIIII 1 I l I l I l r 1 1� 1 \ I \ \\\ � _' �♦ cs \ ' IIII I I I ♦ 9�1/111 �1 / \1\\11 \\\•. \ \ \ \ 1\1 \ 1 \ \ \ \ \ \ \ � \ \ \\ \ 1 \ \ / ♦ \ II � / \ / ♦ / I IIIII 0o", \ \ \. \ \\\1 / I'Ill I I / in ♦\\\♦♦\♦ \ I \ \\1\ ��' e \♦\♦♦♦\♦♦\ 1 1 1 \ \\\\yyam •qA \♦\\♦\\\\\\\I I \ \\\b / / II IIII ;II . 1 \\\♦\\\\\\\\ I\ 1 \ \\M // /�// IIIII . - \IIIII I1 � 4) V A\, Ilr -II I III I I11111 ��I I In 1 1 111 1 ,II 111'' '' �'I�11mI�1�° � lV 49.�0' - I I� I •qA � P� /J IIII 1j1i1„1 1� -♦\\\` -- ��� -- -, /1, �_- ___-___ --_-___ _ `\-________-_______________-____ P ___ _-- /-.I19 -'1S nu 111111r1 \ \ -� • r/ \ 1 1 _ ___ I - 51 53 r 7 142 I I I It/ 11 1 I 1 j IIIII I