HomeMy WebLinkAboutLot Certifications - 07/24/2011,
ADVANCED
ENGINEERING,• L L C
6TRUCT.RAL DRAINAGE DRAFTING ✓�/ D�
�IIOVERLOT GRADING OBSERVATION 0
Site Observation Date Advanced Engineering, LLC Project Number:
Site Observation by: Client Name:
Site Address:
Site Legal: Lo, 15, A`f A4jS..iv1r--
Site Plan and/or Grading Plan by: nl ,F'n1G,Z 110 -OOci DA rev 2- (-eL
�,p,/a,.ic�o E�dr� � r�-}1^oJ-�16 Aa•t-so 3-1�•�11
We have observed portions of the above referenced site. During our observations our representative measured the relative
elevations at the lot sides and corners, top of foundation, and lowest openings. The observed elevations were compared to the
Site Plan and/or Grading Plan referenced above. Based upon our findings it is our opinion that:
The elevations as measured are in general conformance with the above noted Site Plan and/or Grading Plan.
K The elevations as measured are in general conformance with the above noted Site Plan and/or Grading Plan with the
It is our opinion these exceptions, as noted above, should not adversely change the grading scheme as shown on the above
referenced plan.
O During our observations our representative noted that the as measured elevations do not conform to those indicated on the
above referenced Site Plan and/or Grading Plan. However, it is our opinion the grades as measured should provide an
adequate substitute to the above referenced grading scheme (see comments below).
See the attached "As -Built" grading plan.
o The elevations measured are not in conformance to the above referenced Site Plan and/or Grading Plan. Deficiencies
include:
Other comments and/or observations:
Limitations: It is our opinion the above referenced site, as graded on the observation date, should not interfere with offsite flows
unless the grades are changed or barriers are created such as fences, garden terracing, sidewalks, and/or any landscaping which
may change the established flow patterns by diverting or slowing runoff flow. Backfill adjacent to the residence may settle over
time, this settlement may allow ponding to occur adjacent to the foundation walls. To prevent this ponding and related problems,
the backfiII adjacent to the residence must be monitored and maintained to ensure that runoff will flow away from the foundation.
The grades measured were compared only to there uirements shown on the abova referenced site plan and/or grading plan. Other
minimum grading requirements which may soils report or by other construction documents are beyond the
scope of this report. QD 0E.
p �pN Bgf'.F�
33739
Reviewed by: Jason E. Baker, P.E.j'•
SS/ONN-���\
146 Barberry Place, Loveland, Co Telephone 970-278-1909 Fax 970-278-1910
40.9
413
Wj
IB.OW) ..
/ s
GAR I
✓ s
42.0 43.9
(B.O.W-) /
\ 41. ,
42.9 \ '
lHF4
41.9
35B \
32�
T,0P-- TOP OP F*=AnaN 31S
.0=. SAC 'AS -BUILT° OVERLOT
� � T FO AR `� GRADING INCH 085ERV,4t I ONS
Ten-1 • TEPOW OF
BFNCM'IA.fdC I
NP.. wcu POW cP duaLe � � 30.9
0 •bee ADVMICIW Lff"ER MI-01-OIE DATED 1-22-11 \.
1234 LARAMIE RIVER DRIVE
T5M-1
40.4
C- o.4a
41.1
(HP.)
t
422
TOP OF BERM
433
36.1
a WALKOUT
35.0
z
\39.0
33.1
33.1
35.9
\
0
322
353
350
323
31.2
DAM ADVANCED Luxury Homes of N. CO
1)25/II Lot 13, Lema Avenue Estates, Ft. Collins, CO
SCAM
r3o ENGINEERING, LLC y
STRUCTURAL DRAINAGE DRAFNG SIQEf xt11�
TI
CPH 148 BARBERRY PLACE, LOVELAND, COLORADO B0937 II1 or 1
TELEPHONE 97D•270-1909