HomeMy WebLinkAboutLot Certifications - 09/03/2015 (2)City of
Utilities
electric. stormwater• wastewater. water
Forst
Collins
700 Wood
PO Box 580
Fort Collins,, CO 80522
/ \
970.221.6700
970.221.6619619 fax . 970.224.6003 TDD
utilitiesOfcoov.com . fcgov.corrvutikties
CERTIFICATION OF LOT GRADING
Pursuant to City Code 2§ 6-544 and City Land Use Code § 3.2.2 (e
Date: August 28. 2015 r VFI
Permit Application No. BP1501147 COT(.a eg �
Address: 2433 Cooper Crest Lane c
Lk
Lot: 9 Block: 3
Subdivision: Kechter Crossing Planned Land Division
(,(Print) Steven M. Stricklina , a Colorado registered professional engineer, verify that the above referenced
property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately qualified professional under
my direct supervision, and verify that construction of all stormwater facilities and grading is complete, and that the
elevations and drainage patterns shown on the attached drawing(s) which were developed from a survey performed
on (Date): Auoust 20 2015 —,accurately and truly depict the elevations and drainage patterns as they existed
on the date of the survey. Based on this information, I certify that (check one):
xThe elevations and drainage patterns of the lot/site are in substantial conformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
The elevations and drainage patterns of the lot/site as measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional judgment the elevations
and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically approved
drainage plan, and will affect stormwater drainage on and off the lot/site in a manner consistent with the
approved drainage plan. SEE NOTE. 0
31237'
u., l Q•
For and On Behal l' of
�`rS/ONgLE�G CIVAS Entineering, LLC
By:
(signature, PE stamp)
10056 Brisbane Lane, Littleton CO 80130
(address of signing party)
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the IoUsite, Including but not limited to drawings of the lot/site showing the approved design and as -built surveyed
elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written
information/explanation of discrepancies, and other information necessary to confirm the above certification to:
Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80521
(970) 221-6700
Rev. 1,127,12 At least Two Weeks Prior To Requesting A Certification Of Occupancy For The Property
B
C.
6841 SOUTH YOSEMITE STREET 1100
CENTENNIAL, CO 80112
.00' — s' aE.
0
1
722 =�
919U SQF[ z N
N
0
O
xjd31 x431 xq I a' Ix z x43.2
a
k.f Gf of
d o 'µ4 TOF=44944.86
'v
o
.3
o ]
o on I PORCH ,
wK.
xU I
IL E'BNC. �RtlE
0.5 WALK 00 �ww
B.6' TREE/UWN
COPPER ER CREST LANE
G
53' R.O.W.
8
amuNE OF
EKISDNO MOUSE
5 4 I, RAINACE CER➢F
PASSED ON 01-C
`x
-TOP B46M OF CURB
FLOW LINE
SCALE: 1"-20PREPARED FOR. MEP.ITAGE HOMES
LOT 9, BLOCK 3, KECHTER CROSSING PLANNED LAND OVISION. COUNTY OF LARIMER, STATE OF COLORADO.
ALSO KNOWN AS:2433 COPPER CREST LANE
ELEVATION AND DRAINAGE CERTIFICATE
I HEREBY CERTIFY THAT THE ELEVATIONS AND DRAINAGE PATTERNS SHOWN WERE DEVELOPED FROM AN SURVEY PERFORMED UNDER
MY DIRECT SUPERVISION ON THE DATE SHOWN. TO THE BEST OF MY KNOWLEDGE AND BELIEF, THE GRADING FOR THE LOT SHOWN
HEREON WAS MEASURED TO THE NEAREST TENTH OF A FOOT AND ACCURATELY REFLECTS THE DESIGN OF THE APPROVED AREA
GRADING PLAN PREPARED BY THE ENGINEER OF RECORD. ELEVATION$ AND PATTERNS MAY CHANCE SUBSEQUENT TO THIS AS A
RESULT OF NATURAL AND/OR MAN-MADE OCCURRENCES.
THIS DOCUMENT IS NOT AN IMPROVEMENT LOCATION CERTIFICATE OR LAND SURVEY PLAT
m ui
i
6' CROSSPAN ----
I�
I
1
f
d)
m
! !
00
tovi
m
cnv
PROPERTY BOUND
END ROAD
CONSTRUCTION
STA:13+83.26
END CONC
CHANNEL
4940.72 FL
N 1427738.5E
E 3130886.51
ANGLE POINT
CONCRETE CH
N 1427733.4(
E 3130815.4,
5' OLMOT WI'
CONCRETE CH.