Loading...
HomeMy WebLinkAboutLot Certifications - 10/03/2000 (2)$TEWARr&k, SOCIATE$ Consulting Engineers and Surveyors September 20, 2000 Mr. Jay Barber Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Jay, STORMWATER Rg=rc; I\/ar) SEP S 0;2000 G� 3/� h' 64 The enclosed plan is the red lined "AS BUILT" survey of the finish ground at the addition to Ken's Muffler at1219North College Avenue, Fort Collins, Colorado. The finish grading was done in substantial compliance with the Grading Plan enclosed. If you have any questions regarding this certification, please call. Sincerely, Richard A. Rutherford, P.E. & L.S. Q RAR/meh *' .A James H. Stewart and Associates, Inc. 103 S. Meldrum Street • P.O. Box 429 • Ft. Collins, CO 80522 970/482-9331 • Fax 970/482-9382 GENERAL NOTES 1 All street aambry sewer, worm sewer and waterline construction shall conform to The City or Fan Collins standards and specifications cument at The date of execution of the Oevelapmenr Agreement pensnin0 to this development Any construction Occumng three years after the execution Of the Development Agreement shall require m exammatmn of The plans by the City Engineer Coro may home that they be mace to conform to the standards and specifications current aunanime. 2 No street work heading the placement at curb, guttersidewalk, and pavement shall begin unki me soils repon and pavement design are approved by the City Engineer and meet The requirements stated in the "Cosign and COnsuuction Coastal Standards. and Sperifiutions For Streets. Sdesralks. Alleys. and Other Public WaysManual 3 The type. size, location, and number of all known underground undides are approximate as shown the drawings It shall be the responsibility of the Contractor to verify the existence and location of all underground ,andes along the route of the work Before commencing new construction, the contractor shall be responsible for locating unknown underground ubllles. a The mginwr who has prepared these Plansby execution andior seal morofdoes hereby aspmm responsibility to The OW of Fan Collins, as bene0nary of said engineers win*. for any erors and omissions Contained an these plans. add approval of these pans by me Gry Engineer shall not bell the engineer veto has prepared these plans of all such responsibility 5 Wnen an existing asphalt street must be wet. the street must be restored to a Condition equal to or better than its onglwlr rum This existing street Condition shall be documented by The Clry Construction inspeclor before any cars am made Patching shall be done In accordance with The City a' Fort Collins Street Repair Standards The finished patU shall blend in sin ON into the existing sNT All large patches shall be paved with an asphalt lay-0own machine In straets where more than one cut is made. an overlay of the entire street sadth. including the patched areamay be required. The determination of need fora Complete overlay shall be made by The City Engineer III The City inspector at The time the cuts are made. 6 Pnol to the mmme ment of any construction, the warrants shall contact all Widely to Coordinate schedules and contact The City Forester to schedule a site Inspection for any tree removal requiring a permit ] Prior to the commencement of any construction, the Contractor shall give The City of Fan Collin Engineering Department (22 1 E605) and The Effect Control InspecTor(221-6569) twenty4crur(26) hours advance notice e All damped existing cur, puller, and sidewalk shall be replaced prior to the acceptance of completed improvements 9 Prior to the Commencement of any construction that will effect trafi¢ signs of any type the contractorshall correct The ON of Fan Collins Streets [forced. who will Temporarily remove or relocate the sign at no cost t o the contractor- however d the contractor moves are traffic 9 himself the booda cr All be charged for the labor. materials and equipment to reinstall the sign as needed 10 Maintenance of all Made drainage buttes shall be the amenability oftM1 propenY 0I. All recommendations of the final drainage and erosion normalStudy for the development by Newan b Assocates Allb pit a win 12 The minimum cover over waterlines s a 5 feet and the 5 5 feet. 13 Prior m final inspectiond acceptance by The Cry of Fan Collins r rut of drainage (woes. by a registered engineer must he submitted to and approved by The Stomrxal¢ldNy Department (binficausin shall be submitted to the Slounhwer Utlury Cepanmem at least two weeks prior 10 the reease Of a Cen6Caa of upancy for single famny units. For wmme¢tal PmPemasumo finon shall be submitted toMe Stmmwala utility Cepanment at least NO weeks prior to the release of additional building permits to those Llowed prior to carbonation per the Development Agreement. 14 if dewatenng is used to install the muwes,a State oonstrvclmn Oewateong Wastewater mrrarge Permit is required it the discharge is int Channel e t Cited y walers 0the Umeal5 tender 15 Ad coroM i didComply Colin Mr State of Colorado swimming pfor -Slorrywher D,hargss Assamoned wM Uneducated Poorly For informationplease cori The Colorado Getramnent of H 11. Water Ouady Con" DWOCDPEW 430)) Cherry, Gk Drive South Center Colorado 60222-1530 Aft nt n Permits and Enforcement Sectioph (303)6933590 Identifying the needf P 't preparing thptl ton. and paying Or the w and suborner fees necessary to secure this permit II be dise harlifloorpololly M the cantranar. 16Proledbenchmark . City ofFan Collins located ithe FNChr" r I brad fle A via Gnu r c if,F .< 4 4c An Is A jt 21 4Bw -wet d cf Q N f eU .1 Elevation 4f7e,&4 B Ate Vern 17ProlwTCetl ra.Ciy WFWC burod IMe NaCT4a' FS N Air A graven ur. N-1l Enei 4183 P<' 16 Temporary mosion controld 0 demarcation shalle provided as ShOedthe EmancCwVd PI 19 The Developer is resp zbit for all costs for the initial inslailation of traffic iga and sli for the Development relatedt the oforhopment s Iscal street operations In additionthe asystroper is responsible for an costs For traffic signingandsurt Tested! to directing traffic to and from the Dewhopmem 20 The Cry of Fan Collins mu not be responsibleifor any damages sustained in this Oevempieem as resuu of groundwoner S"Page whether u g form groundwater flooding t t ral damage or came, damage sorb d ge sustainedCollins sult of The city of Fan failure to pFOp mann it e s %sitar wastewater d sor m drainage b dies in the Oavelopmem I STANDARD EROSION CONTROL CONSTRUCTION PUN NOTES 1 The GIN ofF M COAMS St USIY Shaped Control inspector must be tT d at least 24 hours yi 10 airy anstma,,r On this site_ 2 As requuee pentrai sit fencing nub till a PRIOR to any land distudiffoll atlivily (slpdgilYq, grading war All other required erosion control measures Nall Of insialled at the appropMse ten in ma catamaran e9 radingled in IN approved YORd sUe , crostructm. plans aM arpwn euttr npM. 3 Pre disturbance vegetation shall be protected and retained wherever possible Rw W Of - OF e,zN, vegetation snarl be limited to the area require n for immedwe consirudiOn opera scud W she eat prad¢al period of time 9 All adds exposed during land disturbing audi shipping gradingu0my instaWtionsto kp".<Mq, a1 be kept in a roughened condition by ripping Or dating along land Contour MM mWN, vaWFaGori ..e....en.ni wcnn control is installed No soils in areas Canada project Shalt npnls0l-way alW rMNe' __ seedlmulab landscaping -etc) Is installed unless omerwnr appruvau UY LP IV o.......—V— 1 5 The Nobody Mae u watered add maintained AT ALL TIMES during Co"'Smtion activiYes w a' sed erosion NI Mna eiswrdrg adivltiea snau ce-mmMiateh eiscommued wn•n M1pXNe auaF orWenms as determined by the City of Fen Collins tagmeenng Department. 6 All lemporary Istructuran a ndi control measures snail be impeded and repainw Or racmabu aeeream ,hose on a ed Medway oulsbinued removed and disposed a .slice not 10 Cause Methei re eased roadway aunaces. snag be removed and eisposee ofm a mwrW' not m eafse made release No any dra(Mu NOT t No sail trough i II M (ndl feet ty.gM Apical stokgles shall okpxlgMl ini sill by sulfa roughening deg. dip It fencing Any sot amckpb remantp aM seeded and mulChad e. Cry Ordinance p eel the tracking dpp 0 or deposing of Cols Or arty MhnmMlYl< or from any vehicle An inadvertent deposited material shall be deali Immedpley y"I" s i.wmaw� Fntw rr.. grC.j brands What'. Ne s, Sunny b NA 3 u1.. WwadNo C«ry"IN Sill <.w:.:.r T Col " i ial 9fRIOM VIFW jaw Fix NO N, 11 all SILT FENCE Wisawl lyr u•Iyyn wwr�Me NO CIl': OF FORF COLIINAI IORMWATEX UIIf m. ��iuw vwlxr Mvry ar. H icicocy fTKEET AS BUILT" Soevey OF 6SEA o„oo u u 2 u m S CPT I9, Zaoo W Q� (,EGE^>_� Cif ..i:"P%� ., y r -(✓A 02a,,City (25 o/ Fort Collins, Colorodo UTILITY PLAN APPROVAL W Z - YS ___-_ Ex Gre N /ourcuc APPROVED:) m— Y cn<e•9;.d.n mr. z rv-- -- ---- CHECKED BY wr.r a Ivoer..ef.r rmluy car. CHECKED BY- sro,mrde. unnly case +e�i I a CHECKED BY. 'Ilk, An a.L 11ty, care CHECKED BY: fad 30 Y? Tmba migNe, dare INSIST au CHECKED BY ! aR bore 04 an