Loading...
HomeMy WebLinkAboutSite Certifications - 09/12/2001 (3)Mr. Basil Hamdan City Of Fort Collins Stormwater Utility Department P.O. Box 580 Fort Collins, Co 80522-0580 Re: Fossil Creek Parkway Extension Stormwater Certification Project No. 0952-003 Dear Mr. Harridan: August 27, 2001 / lx o lzl1441 Please .find enclosed our Stormwater Drainage Certification for the Fossil Creek Parkway Extension for the as -built condition as of August 24, 2001. TST, Inc. surveyed the above drainage facilities on June 25 and July 3, 2001, as they were installed by the contractor. Included is a redlined print of the storm sewer showing the as -built condition. Please contact me at 226-0557 should you have any questions or require further information. Sincerely, TST,.IAIC. CONSULTING ENGINEERS zz Eric M. Fuhrman, P.E. EMF cc: Bob Campbell, Andover Development Marc Palkowitsh, MSP Companies Enclosures TST, INC. 748 Whalers Way - Building D Fort Collins, CO 80525 Consulting Engineers (970) 22641557 Aletru(303)595-9103 Fox Emil lnf @@dill lnfo@tsllnc.com into�tstinc.com ww•u.wine.enm i i / / ass B/on 912.79 ,- '-4912.35 . 912.96\ I �14o15a r09pl 3 DRAINAGE CERTIFICATION FORM Please fill out all applicable items in this certification form for single family, multi -family and commercial properties. Write "OK" for items checked or actual number checked in field. Use ON/All for items that are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification ,/ a.25,4e- a. topographic records and volume ✓ b. cross -sections and spot elevations ✓ -positive fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap -side slopes -grading �/O 'ri' B�Kc Hits/ 7e flE CowvcsrrD. Sr5 uvrr!e� Rw�' r= B� %qcE�. orJ/oe Riii_.aP IAJ 4 -orifice plate installation and size -compaction of berm -structural integrity of pond_ 2. Swales -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations )WV car eftwgffa ,tee srv. MP. & A?6CVav a%xs ONsi s 4OWWO14" v oK 09 PA r 2 . Temoorary Measures : /FMZ .f 14MA"/ 40044te7W W 4eEF,r SiaF of A,,p Ory4/AJM-'% 70 Of &9ND1G4P_cV r +/ /iR9RT7YtEJ �%S, -mulching 96e -inlet filter installation ,4.*Mr r E7.YiFD. t .� O oWele s r -check bale dams N/A -seeding and temporary vegetation -silt fence D. Site Cleanup After Construction -construction clean up -smoothing of ruts -reseeding E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that to the best=of his knowledge the -as-built conditions of the drainage facilities are -as"",", described in the above form and in the redlined plans enclosed. Failure to properly disclose all known information -could result in the rejection of this certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of ,Occupancy. F. Signature and Stamp by a Colorado Registered Engineer. 34716 g_Z,,01 (-I -permanent erosion control measures (drop structures, riprap, etc....} -tie-in to pipes, pans, curbs, etc.... -weir size (elevations, size, opening, etc...) -available freeboard -landscaping infringement on swales 3. Pibes -size and type -slopes (as -built and comparison to,minimum 0.4% slope) -pipe capacity calculations if slopes are significantly altered -invert elevations -installation and backfill material -cover encasement and clearance•from�other utility lines close by -joints 4. Concrete Pan Channels -size -slope -super elevation -cross-section -thickness -elevations I OK OK Oic NA �A S. Inlets -size and type OK lif -size of opening (or name of standard used) %Ypx- R .-grate elevation -invert elevation OK -box size jOK 6. Cross moans -size -type -grade OK -elevation OK cross -sectional -depth OK -tie-in to curb and gutter BK 7. Culverts -size GK -type 9- -invert elevation OK -headwalls S. Underdrains -size _1L -type -cover -back€ill -geotextiles 'SO? -cleanouts 9. Curb cuts -size -tie in to swale, pipe, etc.... B. Certification of Grade Elevations Adjacent to Drainage Facilities: -minimum opening elevations -top of foundation elevations -comparison to,100 year WSEL's (Freeboard requirements'and floodplein issues) C. Certification of Erosion Control Measures: 1. Permanent Measures: -Permanent vegetation (6" bare spots and weeds under control) -riprap -riprap bedding -drop sections .-sediment basins/water quality ponds -netting mats/blankets -mulching