Loading...
HomeMy WebLinkAboutSite Certifications - 04/18/2002 (2)L�J Mr. Jay Barber City Of Fort Collins Stormwater Utility Department P.O. Box 580 Fort Collins, Co 80522-0580 Re: Huntington Hills P.U.D. — Filing No. 7 Bldgs. 4, 7, 8, 9 & 11 Stormwater Certification Project No. 0893-003 Dear Mr. Barber: April 15, 2002 'zv Zsr/Cee /3wY Please find enclosed our compliance check of Buildings 4, 7, 8, 9 and 11 for Huntington Hills P.U.D. — Filing No. 7 for the as -built condition as of March 19, 2002. TST, Inc. surveyed the above improvements October 30, 2001, February 20, 2002, and March 19, 2002, as they were installed by the contractors. The following are the finished floor elevations of the buildings: Building No. As -built FF Design FF 14 4919.65 4919.60 L 7 4918.48 4918.45 8 4918.07 4918.00 9 4918.39 4917.38 4918.30 1 4917.30 11 1 4921.49 4921.50 All pans, swales, and grading have been completed around the buildings as shown on the approved plans. At the time of the survey, minor grading and landscaping were still required around some of the buildings, however, the storm drainage facilities are in place and should function as designed. Spot elevations for the pans south of buildings 8 & 9 were provided at the time of the site certification. Spot elevations for the pan around building 11 are enclosed. In addition to the building checks, the Pond A & B orifice plates have been corrected to be the proper diameter. TST, INC. 748 Whalers Way - Building D Fort Collins, CO 80525 Consulting Engineers (970) 226-0557 Metro (303) 595-9103 Fax (970) 226-0204 Email info@tstinc.com 4J1� www.istinc.com .com :TST, INC. Please contact me if you have any questions regarding this compliance check of these two buildings. Sincerely, TST, INC. CONSULTING ENGINEERS ZA - Eric M. Fuhrman, P.E. EMF/sjk cc: Bob Campbell, Andover Development Ron Ryan, Davis Brother Construction ow