Loading...
HomeMy WebLinkAboutSite Certifications - 07/01/2002r Mr. Jay Barber City Of Fort Collins Stormwater Utility Department P.O. Box 580 Fort Collins, Co 80522-0580 Re: Huntington Hills P.U.D. — Filing No. 7 Bldgs. 2, 3 and 12 Stormwater Certification Project No. 0893-003 Dear Mr. Barber: May 15, 2002 49-0-41-11 Please find enclosed our compliance check of Buildings 2, 3, and 12 for Huntington Hills P.U.D. — Filing No. 7 for the as -built condition as of March 19, 2002. TST, Inc. surveyed the above improvements September 25, 2002, October 30, 2001, and March 19, 2002, as they were installed by the contractors. The following are the finished floor elevations of the buildings: Building No. As -built FF Design FF 2 4922.01 4922.00 3 4920.31 4921.34 4920.30 4921.30 12 4921.95 4921.85 All pans, swales, and grading have been completed around the buildings as shown on the approved plans. At the time of the survey, minor grading and landscaping were still required around some of the buildings, however, the storm drainage facilities are in place and should function as designed. Spot elevations for the pan around building 12 are enclosed. As of this compliance check, the only outstanding check is that for the clubhouse which is currently under construction. Please contact me if you have any questions. Sincerely, TST, INC. CONSULTING ENGINEERS Gam--: w Eric M. Fuhrman, P.E. EMF/amb cc: Bob Campbell, Andover Development Ron Ryan, Davis Brother Construction TST, INC. 748 Whalers Way - Building D Fort Collins, CO 80525 Consulting Engineers (970) 226-0557 Metro (303) 595-9103 Fax (970) 226-0204 Email info@tstinc.com www.tstine.com % � 9v y Q M