Loading...
HomeMy WebLinkAboutSite Certifications - 08/16/2002' August 14, 2002 Mr. Jay Barber City Of Fort Collins Stormwater Utility Department P.O. Box 580 Fort Collins, Co 80522-0580 Re: Huntington Hills P. U. D. — Filing No. 7 Bldg. 1 Stormwater Certification Project No. 0893-003 Dear Mr. Barber: Please find enclosed our compliance check of Building 1 for Huntington Hills P.U.D. — Filing No. 7 for the as -built condition as of August 14, 2002. TST, Inc. surveyed the above improvements August 14, 2002, as they were installed by the contractors. The following are the finished floor elevations of the building: Building No. As -built FF Design FF 1 4921.27 4921.00 All pans, swales, and grading have been completed around the building as shown on the approved plans. At the time of the survey, minor landscaping was still required around part of the building; however, all storm drainage facilities are in place and should function as designed. Please contact me if you have any questions. Sincerely, TST, INC. CONSULTING ENGINEERS Eric M. Fuhrman, P.E. EMF/sjk cc: Bob Campbell, Andover Development Ron Ryan, Davis Brother Construction TST, INC. 748 Whalers Way - Building D Fort Collins, CO 80525 Consulting Engineers (970) 226-0557 Metro (303) 595-9103 Fax (970) 226-0204 Email info@tstinc.com 6V www.tstinc.com