HomeMy WebLinkAboutLot Certifications - 07/21/1999June 23, 1999
Project No: 1207-46-98
Jay Barber
City of Fort Collins Stormwater Utility
P.O. Box 580
Ft. Collins, Colorado 80522
STORMWATER
im IS 10,
Re: Lot 82, Huntington Hills P.U.D., Filing No. 5
500 St. Michaels Drive; Fort Collins, Colorado
Dear Jay,
This letter serves as final certification for the above referenced address according to the
requirements of the Stormwater Utility in the Stormwater Building Permit Notice for this address
dated 01/25/99. Certifications include the items noted on the Stormwater Building Permit Notice
and are as follows:
• Grading certification
• Swale certification
• Finished floor elevation certification
• Property lot corner elevation certification
• Lowest building opening elevation certification
All final grading, including the swales along the sideyards of the residence, and rear lot grading,
are functioning properly and meet the intent of the original subdivision grading and drainage
design according to the Final Utility Plans for Huntington Hills Filing No. 5 by JR Engineering,
Ltd.; JR Project No: 9018.0.5.
Attached are the record field shots obtained for the site. Also attached is a copy of that portion of
the Grading, Drainage and Erosion Control Plan from the subdivision utility plans, of which this
site is a part. This is for reference only.
If you have any questions, please call at (970) 226-5334.
Brian W. Shear, P.E.
Shear Engineering Corporation
BWS / mb
attachments
cc: Bonnema Construction
4836 S. College, Sulte 12 Ft. Collins, Co 80525 (970) 226.5334 FAX (970) 282.6311
A �0 8'02 UN, R AV 1 0 S89'59 2"E ( I
'S 77• 1
.DRIVE
9*421.4
"yV
/ J 8�6 84O U 1.4�2� ;
68.7 66 I L--'-------
/.': 6
0 97; / of=6e.7 S00'00'18".W
TOF=67,9 '
°I p6h 104
643
a t .. 63. — — — — — — — — _ — — --
o
98 �` � o J,�J 62.1
' TOF=64-0 r
TOF= 3.5 TOF=63.0 TOF=62.4 TOF=60.8
8 / 82 0 0
•. 8 79.
ro
0
�00�S8J'5
9 2"E
4
94 0.53
59.9
.eI)4
TOF=63,� 60.G _ _777
—
.4
62 `,.
' l 2..63 •64 ... 66
\\ - TOF=63.0 , 60.
0..,- 70F=62.7 ,TOF=62.4 TOF=6119 TOF=60,4
W r
W
-_
�.;
X SII St
48.. 49.3. 50. �c ,-I
_ ,.3
Y
._l
-49,1 I TOF=49.7 TOF=50.4 TOFa51:0 70F=51.7. TOF=52:3 "TOF=53.
I. OI A
r
BONN(MR CONSTRUCTION P.O. Box 270991 Fort Collins, CO BOS27
65,%.
F3.41
I