HomeMy WebLinkAboutLot Certifications - 06/25/1997 (2)FOUNDATION II Consulting
ENGINEERING Engineers, Ltd.
June 18, 1997
Commission No.: 1852-08-04-05
Rossi Construction
P.O. Box 272283
Fort Collins, Colorado 80527
RE: Lot 80, LHuntington Hills Fifth Filing (512 St. Michaels Drive)
Fort Collins, Colorado
Gentlemen:
We have measured the relative elevations of the top of foundation,
lot corners, and at several points including the drainage swale
which begins at the vicinity of the northwest corner of the back
yard and flows down weither side of the property for the above
referenced address. Based upon our observation, the lot has been
graded in substantial conformance with the grading plan by JR
Engineering, Job No. 9018.05, dated June 6, 1995.
If you have any questions, please feel free to call.
Respec�.,full
Clifford P. (X#am,�- !6 " a,.m::c,„»,,,,nq,.
Environmental/Ear h,� _',C 9 P t)ecialist
Reviewed
E*M
Kevin Tvr Pa rson, �C>
FOUNDATION GINEEF afi „ bfTLTING ENGINEERS, LTD.
CPH/jle
5110 Granite Street . Loveland, Colorado 80538 • (970) 663-0138 . Fax (970) 663-1660
515 Main Street, Suite C . Longmont, Colorado 80501 . (303) 702-0661
s3.s
620
6L6
61.6 f
SCALE; P.2W
ELEVATIONS SURVEYED
6-16-97 62.0
6U e
60.8
`622
( 80.ad0c of WA) L_
REVISED GRADING PLAN
LOT 80, HUNTINGTON HILLS P.U.D.
51h FLING
FORT COLLINS, COLORADO
63.6
6L4
sh
60.3
60J
TOP OF FOUNDATION
63.2
LOWEST OPENING
62.5
Gil 39 8
• 69.3 Band Mark
•. (Bade of Wd)
512 St. MICHAELS DRIVE
Note-. This Oradlny plan Is based an the bast
lnformallon ova a of the time of sway.
c .;r
`S{
&W: