Loading...
HomeMy WebLinkAboutLot Certifications - 06/25/1997 (2)FOUNDATION II Consulting ENGINEERING Engineers, Ltd. June 18, 1997 Commission No.: 1852-08-04-05 Rossi Construction P.O. Box 272283 Fort Collins, Colorado 80527 RE: Lot 80, LHuntington Hills Fifth Filing (512 St. Michaels Drive) Fort Collins, Colorado Gentlemen: We have measured the relative elevations of the top of foundation, lot corners, and at several points including the drainage swale which begins at the vicinity of the northwest corner of the back yard and flows down weither side of the property for the above referenced address. Based upon our observation, the lot has been graded in substantial conformance with the grading plan by JR Engineering, Job No. 9018.05, dated June 6, 1995. If you have any questions, please feel free to call. Respec�.,full Clifford P. (X#am,�- !6 " a,.m::c,„»,,,,nq,. Environmental/Ear h,� _',C 9 P t)ecialist Reviewed E*M Kevin Tvr Pa rson, �C> FOUNDATION GINEEF afi „ bfTLTING ENGINEERS, LTD. CPH/jle 5110 Granite Street . Loveland, Colorado 80538 • (970) 663-0138 . Fax (970) 663-1660 515 Main Street, Suite C . Longmont, Colorado 80501 . (303) 702-0661 s3.s 620 6L6 61.6 f SCALE; P.2W ELEVATIONS SURVEYED 6-16-97 62.0 6U e 60.8 `622 ( 80.ad0c of WA) L_ REVISED GRADING PLAN LOT 80, HUNTINGTON HILLS P.U.D. 51h FLING FORT COLLINS, COLORADO 63.6 6L4 sh 60.3 60J TOP OF FOUNDATION 63.2 LOWEST OPENING 62.5 Gil 39 8 • 69.3 Band Mark •. (Bade of Wd) 512 St. MICHAELS DRIVE Note-. This Oradlny plan Is based an the bast lnformallon ova a of the time of sway. c .;r `S{ &W: