Loading...
HomeMy WebLinkAboutLot Certifications - 03/20/1995 (3)ok Q3, D bl� RMINC. Engineering Consultants Fort Collins, Colorado 80521 303/482-5922 FAX:303/482-6368 '�>lzC)/oc March 3, 1995 3r45Y" Mr. Glen Schlueter A City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 RE: Centre --for Advanced-Technolog-y-Six-teenth Filing-P UU.D. Drainage Certification qkq; C,,;&int? Ssner� PROJECT NO.: 578-002 Dear Glen: Attached is a blueline markup showing as -built spot elevations obtained from RBD survey crews. Some of the spot elevations differ from what the utility plans call for. The volume for the detention pond has been recalculated using the as -built elevations and it has been determined that the 100 year water surface elevation will raise from the intended 49.13 to 49.21 to obtain the required volmue of 1.51 ac-ft. The release rate through the orifice plate will be 1.93 cfs instead of the intended 1.91 cfs. The area and curb inlets have been installed as intended as well as the riprap at the pipe outlet. The orifice plate has been installed on the outlet structure as called for on the plans. The hay bales have been. installed in the bottom of the pond. All paving has been completed on the site, including the parking lot and Worthington Circle. The temporary retention pond east of Worthington Circle has been installed and the volume has been calculated to be 0.32 ac-ft, which is more than the required volume of 0.26 ac-ft. The pond areas are to be sodded when the weather allows this to be done, in the meantime the owner is going to provide the City bond money. It appears that the constructed improvements will function as intended. Thank you for your consideration of this Certification submittal. Sincerely, RBD Inc., Engineering Consultants Tim J. ailey Design Engineer W •i Kevin W. Ginger , P.E.' DenVBY'303R49-5; Fources Project Manager DRAINAGE CERTIFICATION FORM Please fill out all applicable items in this.certification form for single family, multi -family and commercial properties. Write "OK" for items checked or actual number checked in field. Use "N/A" for items that.are not applicable to the property that is.being certified. A. Drainage facilities certification 1. Pond Certification -volume verification a. topographic records and volume b. cross -sections and spot elevations -positive fall to pan M/A -side slopes -invert elevation _ -spillway elevation. -placement and size of riprap 6k_ -side slopes v K -grading. -orifice plate installation and size OFC -compaction of berm Nct Vet-i�i�d -structural integrity of pond O K 2. Swales -location. (are they within easement) NA&a -dimensions and cross-section verification T -longitudinal slopes and side slopes NIA, -spot elevations -permanent erosion control measures (drop structures, riprap, etc....) -tie-in to pipes, pans, curbs, etc.... -weir size (elevations, size, opening, etc...) -available freeboard -landscaping infringement on swales 3. Pipes -size and type -slopes (as -built and comparison to minimum 0.4t slope) -pipe capacity calculations if slopes are 0 !c significantly altered -invert elevations O+C installation and backfill material -cover 41� -encasement and clearance from other utility lines close by N -joints Ne} 4. Concrete Pan Channels -size -slope -super elevation Mkk 7— .-cross-section -thicknessi P -elevations *141\ S. Inlets -size and type -size of opening (or name of standard used) .-grate elevation invert elevation -box size 6.` Cross Pans -size -type -grade " -elevation -cross-sectional depth �- -tie-in to curb and gutter 7. Culverts -size -type invert elevation -headwalls 8. Underdrains -size -type -cover -backfill -geotextiles" OK :6 0K Ccna-e�� OIc D 1� Var;eb *A' -cleanouts. 9. Curb cuts i���SE c��i -size 'Z�ae0` -.tie in to swale, pipe, etc.... Q�C H. Certification of Grade Elevations Adjacent to Drainage Facilities: -minimum opening elevations OK -top of foundation elevations ° K 1 -comparison to 100 year WSEL's p 6Ve WELL (Freeboard requirements and floodplain issues) C. Certification of Erosion Control Measures: 1. Permanent Measures: Permanent vegetation (6" bare spots and weeds under control) -riprap .-riprap bedding C!c -drop sections IVA. -sediment basins/water quality ponds -netting mats/blankets N a -mulching 2. Temoorary Measures: -mulching ; -inlet filter installation -check bale dams -seeding and temporary vegetation -silt fence D. Site Cleanup.After Construction -construction clean up -smoothing of ruts -reseeding E. Statement of Compliance -ok a K, o� TO �G LOM Igt�d This certification is signed 'and stamped and by signing this form the engineer(s) attests that to the best of his knowledge the as -built conditions of the drainage facilities are as described in the above form and -in the.redlineA plans.enclosed. Failure to properly disclose all known information could result in therejection of this.certification and prevent the release of any Stormwater Utility holds on Building Permits and/or Certificates of Occupancy. F. 'Signature and Stamp by a Colorado Registered Professional Engineer. Cinema Savers 014-047 Detention Pond Rating Curve Cumulative Elev Area Storage (ft) (ac) (ac-ft) 42.4 0.000 0.000 V = d/3•(A+B+(AB)" 0.5) 43.0 0.010 0.002 44.0 0.025 0.019 45.0 0.044 0.053 46.0 0.062 0.106 47.0 0.094 0.183 48.0 0.184 0.320 48.5 0.881 0.564 49.0 1.471 1.146 /, 49.5 2.028 2.017 W5f�a4y,Z/ Ares -Capacity Curare 0.1 0.00 0.00 0.04 0.02 0 42 47 44- 45 45 47 stwMM + Aron Gp;Ry T:IDINC Engineering Consultants CLIENT 1"-1tSeW4. ��"'V=�J JOB NO. r"F~"'�'l� PROJECT AT /6'-�- FI 1 CALCULATIONS FOR 12n2 y`Q- }Y�MADEBYYASHEET-OF DATE - SHEET _ OF Cinema Savers Retention Pond Rating Curve Cumulative Elev Area Storage (ft) (ac) (ac-ft) 46.1 0.084 0.000 47.0 0.114 0.089 48.0 0.136 0.214 49.0 0.166 0.364 578-002 ' V = d/3"(A+B+(AB)110.5) Vela �.fv, ►V . P 0.3