Loading...
HomeMy WebLinkAboutLot Certifications - 09/29/2000AIRES ASSOCIATES September 21, 2000 Mr. Jay Barber City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, Colorado ez/ G� 80521 Re: Lot 39, Huntington Hills Filing 5 � Dear Jay, I was requested to review the site drainage for the above reference lot. Based on the design Drainage, Overlot Grading and Erosion Control Plan (Sheet 6 of 40) by JR Engineering, drainage on the lot was intended to split at approximately the midpoint of the house. The front of the lot would drain to Parliament Court and the rear of the lot would drain north to Fossil Creek Parkway. Spot elevations at the property corners were shown to be 25.8, 25.6, 26.3, 27.3, and 27.0, clockwise starting from the back northeast corner. The top of foundation (TOF) grade was shown as 28.7. Small swales were to run along the side lot lines to direct drainage either to the front or back. The other lots around Lot 39 have already been built. As=built conditions of Lot 39'indicate that the front portion of the lot does drain to Parliament Drive and:the rear lot drains to Fossil Creek Parkway, all asdesigned. The property corner elevations were surveyed to be 26.9, 25.6, 26.3, 28.0, and"27.6, clockwise starting from the back northeast corner (see enclosed as -built grading sheet). The front corners match the design, .but the rear corners are 0.7, 0.6, and 1.1 feet high from west to east; respectively. The highpoints separating front from back are 1.1 and 2.0 feet higher than designed. The first floor was built to an elevation of 33.3, which is 4.6 feet higher than the designed minimum top of foundation. There is positive drainage away from the house on all sides. Downspouts were also installed on the gutters to direct roof drainage away from the house. Although several lot corner grades and the first floor are significantly higher than designed, the drainage still functions with the intended patterns and the adjacent properties are not affected. In fact, finished grading on the adjacent lots dictated grading.for Lot 39. It is my opinion that Lot 39's drainage patterns are in general conformance with the design grading plan. I hope this provides the information you require. If you have any questions, please feel free to call. Sincerely, Ow 'Ayres sociates,.Inc: _ `Project Manager:: CC:sp Owen Ayres & Associates, Inc. Engi nee rs/Scientists/Surveyors 3665 JFK Parkway, Building 2, Suite 200, P.O. Box 270460, Fort Collins, CO 80527 (970) 223-5556, Denver Metro (303) 572-1806, FAX (970) 223-5578 BARB9LTR 32-0356.00 Printed on recycled paper Ossil Cr . 27.62 27.97 Lot 39 Huntington Hills 5th 2a29 27.41 Pc r vv ay 26.93 20 a 15 5 10 GRAPHIC SCALE 1"=20' 27.66 26.30 —,\ I ' /" 25.61 ParUament Court