CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-5U and City Land Use Code § 3.2.2 (e)
Date:
co If e'r'-Sea
7/ % -'/� 2/I$�Ztcl�
�/bAk
Permit Application No. 1B1301 oo $ �313obOc} —a
Address:(
Lot: Block: (-f r+-le a.SaJ Il/iy./Zol4-
Subdivision: L.00;ltS 42R S �HYTGowlt3 CAZIZiAQ1 - 14005E {Ir a..-i;ra let: la
I,(Pdnt)4-tff/✓ i 13 _ a Colorado registered professional engineer, verify that the
above referenced property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately
qualified professional under my direct supervision, and verify that construction of all stormwater facilities and grading
is complete, and that the elevations and d inage attems shown on the attached drawings) which were developed
from a survey performed on (Date): L L accurately and truly depict the elevations and drainage
patterns as they existed on the date of the survey. Based on this information, I certify that (check one):
❑ The elevations and drainage patterns of the IoUsite are in substantial conformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
The elevations and drainage patterns of the lot/site as measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional judgment the elevations
and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically
approved drainage plan, and will affect stormwater drainage on and off the IoUsite in a map
aer.consisten
with the approved drainage plan. SEE NOTE. aE.1
,tF1
Y. _
B (sig PE stamp) c b21���e�
u
9. a°
(address of signing partyykkj R
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificateof;Occupai
for the loVslte, including but not limited to drawings of the IoUsite showing the approved design and as-bulli suiveyeecc
elevations of all structures, drainage and grading features (e.g. swales, retaining walls, lot comers), written
informationlexplanation of discrepancies, and other information necessary to confirm the above certification to:
Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80521
(970) 221-6700
Rev. 1127112 At least Two Weeks Prior To Requesting A Certification Of Occupancy For The Property
�'owr�.S1o�T �f I�1�. COfJ�tl
4, 42c� 40 A'trec} 1` Ao AV-e S4TX,4
Is
"AS-BUIL T" CRADINC
429 S WHI TCOMB ST., FT. COLLINS.. COLO.
XS#4715
5004.5 FT
NGVD
29
12�:=�
SCALE 1" =
30'
100 YEAR
HIGH RISK
(f)
FLOOD FRINGE
BOUNDARY—
y
NGVD 29
5004 BFE
BENCH MARK
CITY OF FORT COLLINS BM #1-11
NGVD29 ELEVATION Q 5005.44
LOCATED AT THE SOUTHEAST CORNER
OF MULBERRY STREET AND LOOMIS
AVENUE, AT THE NORTHEAST CORNER
OF A CONCRETE TRAFFIC SIGNAL BASE
SHIFT ALL ELEVATIONS +3.18• TO MATCH
INTO NAVDBB VERTICAL DATUM
THIS PROPERTY IS LOCATED WITHIN
THE CITY OLD TOWN FLOOD PLAIN
5 FT
Prepared By. Forbes Engineering
3 1 �---------
E-- ss 20' ALLEY
wry _ gry
34 sr3 5 �� g
\ e, „�" ` 100 YEAR
y soa6ea MODERATE RISK
_ I BOUNDARY FLOOD GE
a+ a+.
:F
� I
�o^ 0lO 1
I � I
I 1
I s
GARAGE
AMMON 1
5
h� 6.21 Nye
g� �96 " ( 100 YEAR
�I� MODERATE RISK
& W FLOOD FRINGE
R BOUNDARY
I +�96 4.19
I I
�gof I
100 YEAR
33j — HIGH RISK
FLOOD FRINGE
0000000,
BOUNDARY
XS 4358 I —>
5002.8 FT S. WHI TCOMB A VENUE
NGVD 29
S ` I Sheldon House B&B
616 W Mulberry St -
I �ry
�s J �ti 20' ALLEY
1
100 YEAR FLOOD
_t PLAIN BOUNDARY
PROPOSM
CAMAGE
FF-W s5o
0 r
i
i
I
yti�
I�
jr
cp
I i
BENCH MARK
¢
O A
moo
CITYMFFOR UNS
ARK
BEN5005.44
5004 B FE /
ok6
ELEVATION _
PROPOSM
GM,GE
LOCATED AT THE
SOUTHEAST CORNER OF
\/
AMMON
MULBERRY STREET AND
LOOMIS AVENUE, AT THE
NORTHEAST CORNEOF A
RSIGNAL
CONCRETE TRAFFICR
C I I
r
h
BASE
I
'
11 I { I
421 . South
�,.
Whitcomb
'
o
l ;���
°
100 :YEAR FLOOD
I _j`
PLAIN BOUNDARY
ff
t e
3
—
PROPOSED GRADING
SCALE I • - 30'
S. WHl TCOMB A VENUE
.
FORBES ENGINEERING
CUL:M.•
coNOR FLAmGAN
Y PREPARED B
KEVIIV FOReEs
2908 CHERLY STREET,
Ft. Collins, Colorado 80524
PROJECT'
429 S WHTCOMB ST
DRAWN.
DATE
Tel,. (970) 295-4874
fT.COL1lN$ CO
KEF
2-25-13
sync a> 0. aW7M A AV DESM SHEET
�RU- FDf77017MN_% LAfM : KNOPA PLAMW
ME PROPOSED GRADING
do DRAIA14GE PLAN
PROJECT �
13-1720
DWG if
1720—PR
Dan Mogen
From: Kevin Forbes <kevinforbes@frii.com>
Sent: Tuesday, December 16, 2014 9:52 AM
To: Dan Mogen
Subject: RE: Grading Cert
Attachments: 429 Whitcomb Grading Certification.pdf
Dan,
Here's the grading cert with the proposed grading plan and the appropriate box checked.
The only exemption being the finish floor of the garage being built below the proposed elevation.
Thanks,
Kevin
Forbes Engineering LLC
2908 Cherly St., Ft. Collins, CO
Office (970) 295-4874
Cell (970) 232-6014
kevinforbes@frii.com
From: Dan Mogen [mailtoAmogen(Mcgov.coml
Sent: Monday, December 15, 2014 12:49 PM
To: 'Kevin Forbes'
Subject: RE: Grading Cert
Kevin,
Attached is the grading plan that you put together for this.
Dan Mogen, El, CFM
Stormwater Engineer
City of Fort Collins Utilities
(970)224-6192
dmosen@fcaov.com
From: Kevin Forbes [mailto:kevinforbes(Wrii.coml
Sent: Monday, December 15, 2014 10:21 AM
To: Dan Mogen
Subject: RE: Grading Cert
Dan,
Here's the grading cert for Conor Flanagan.
Let me know if you need anything else.
Kevin
Forbes Engineering LLC
2908 Cherly St., Ft. Collins, CO
Office (970) 295-4874
Cell (970) 232-6014
kevinforbes@frii.com
From: Dan Mogen [mailto:dmooen@fcgov.coml
Sent: Friday, December 12, 2014 2:57 PM
To: 'kevinforbes@frii.com'
Subject: Grading Cert
Dan Mogen, El, CFM
Stormwater Engineer
City of Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80522
(970)224-6192
dmosen@fcsov.com
Fort Collins