HomeMy WebLinkAboutLot Certifications - 01/13/1999 (11)FOUNDATION I
AND SOILS
November 16, 1998
Commission No.: 1036-07-01-04
Griess Construction
225 Park Place Court
Fort Collins, Colorado 80525
Engineering,
Inc.
RE: Lot 95, Huntington Hills, Sixth Filing (524 Saturn Drive), Fort Collins, Colorado
Gentlemen:
We have measured the relative elevations at the above referenced address. During the investigation,
we measured elevations at the lot sides and corners, top of foundation, and the drainage swales on
either side of the lot.
Our representative noted that the swales on either side of the lot had continuous fall to the sidewalk
and to the rear of the subject lot at the time of our investigation. The residence to the west of the
subject lot (Lot 89, Huntington Hills, Fifth Filing) was complete but had not established landscaping
at the time of our investigation. The lot east of the subject lot (Lot 96) was unoccupied at the time
of our investigation. Based on our observations, and the information available to this office, the
slopes and elevations as measured are in substantial conformance with the FHA grading plan
completed by JR Engineering, Ltd., Job No. 9018.13, dated February 5, 1997.
Furthermore, it is our opinion that the subject lot, as graded, will not interfere with offsite flows, nor
cause runoff to flow into another residence unless the grades are changed or barriers are created such
as; fences, garden terracing, sidewalks and/or any landscaping which may change the established
flow patterns by diverting or slowing runoff flow.
If you have any questions please feel free to call. Vp�%MDii1111111/,
0 R �i
Respectfully,Rt('by
Clifford P. Ham, M.S.
Environmental/Earth Sciences Specialist
CPH.
J
ENGINEERS, LTD
O
O
, CONSULTING
5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660
500 Kimbark Street, Suite 101 -Longmont, Colorado 80501 •(303) 702-0661 -Fax (303) 774-8413
fREV15ED GRAD INIS PLAN
NORTH
ELEVATIONS SURVEYED
5-4,11 11/11/50
X55.5
571
S.3 Sb, ro
Tor OF-FOUN-RATION -
= 64.9
I,OwE3T OPeNINCI
- 57.4
6+.4
(0 3A
62.7
�39
o.
ir
CONG
�Rry s
s
59,8 (8.O.W,)
61.7
> BENCHMARK
T
r QQ
NOTE:
THIS GRADING FLAN IS BASED UPON THE BEST
INFORMATION AVAILABLE TO THIS OFFICE AT THE
DR•
TIME OF SURVEY.
�3DAM-1-4
FOUNDATION
GG71�L�'vULtI1VCs
GR«ss CON5T.
IIA31W
SCALE
ENGINEERING
81VGsfiVi=FRB
LOT 55, NUNTIW*TON HILLS 6TH
I' 2'
STRUCTURAL FOUNDATION AND SOILS ENGMEERNG
LOVELAND C0LORADO ib"-CIM
No Text