HomeMy WebLinkAboutLot Certifications - 03/14/1995A IRES
Formerly Resource Consultants & Engineers (RCE)
March 10, 1995
Mr. Basil Hamdan
City of Fort Collins
Stormwater Utility
235 Mathews
Fort Collins, Colorado 80521
Re: Lot 157, Huntington Hills Filing 2
Dear Basil:
r ,f
w
As required by the hold placed on the certification of occupancy, we surveyed the
elevations of the rear lot corners. The northeast corner elevation is 4963.2 feet and the
northwest is 4963.0 feet. The northeast corner is 0.2 feet higher and the northwest
corner is 0.1 feet higher than the planned elevations. However, these elevations match
the surrounding ground level and should not cause any drainage problems. The first floor
elevation of the house is 4963.4 feet, which is 1.4 feet higher than the planned elevation.
The swales on the sides of the house are complete and "adequate for conveying drainage to
the street. Enclosed are pictures of the swales.
It is our recommendation to release the hold placed on this lot for the certification of
occupancy since the Contractor did a good job to adequately grade the lot to drain. If you
have any questions, please call.
Sincerely,
Ayres Associates, formerly
Resource Consultants & En ' eers
Paul R. Barker, P.E.
Manager, Civil.Engineering
Enclosure
cc: Charlie Miscallef
Owen Ayres & Associates; Inc.
Engineers/Scientists/Surveyors
3665 JFK Parkway, Building 2, Suite 300, P.O. Box 270460, Fort Collins, CO 80527
(303) 223-5556, Denver Metro (303) 572-1806, FAX (303) 223-5578
Printed on recycled paper
HAMDAN3E.LTR
34-0233.00
AS
SEES
i
_a_ WA -
FjE�3
.� :J�„ .JC.f.arllYYIYL_
r■r
rEr
Lot 157
Huntington Hills
Filing 2
ar_ y
SENSE
::MINE
-SEEMS S■ ES■
i
Lot 195
Huntington Hills
Filing 2