Loading...
HomeMy WebLinkAboutLot Certifications - 03/14/1995 (3)AIRES ASSOCIATES Formerly Resource Consultants & Engineers (RCE) March 10, 1995 Mr. Basil Hamdan City of Fort Collins Stormwater Utility 235 Mathews Fort Collins, Colorado 80521. Re: Lot 195 �Hiinfington_Hill_s Filing_V Dear Basil: �37 / 14-/3 5- C O � As required by the hold placed on the certification of occupancy, we surveyed the elevations of the rear lot corners. The southeast corner elevation is 4970.3 feet and the southwest is 4970.1 feet. The southeast corner is 0.3 feet higher and the southwest corner is 0.6 feet higher than the planned elevations. However, these elevations match the surrounding ground level and should not cause any drainage problems. The first floor elevation of the house is 4967.8 feet, which is 1 .2 feet higher than the planned elevation. The swales on the sides of the house are complete and adequate for conveying drainage to the street. Enclosed are pictures of the swales. It is our recommendation to release the hold placed on this lot for the certification of occupancy since the Contractor did a good job to adequately grade the lot to drain. If you have any questions, please call. Sincerely, Ayres Associates, formerly Resource Consultants & Engineers J Z4-2— Paul. R. Barker, P.E. Manager, Civil Engineering Enclosure cc: Charlie Miscallef Owen Ayres & Associates, Inc. Engineers/Scientists/Surveyors 3665 JFK Parkway, Building 2, Suite 300, P.O. Box 270460, Fort Collins, CO 80527 (303) 223-5556, Denver Metro (303) 572-1806, FAX (303) 223-5578 Printed on recycled paper HAMDAN3D.LTR 34-0233.00