Loading...
HomeMy WebLinkAboutLot Certifications - 04/19/1999 (3)STEWART&AiSSOCIATES Consulting Engineers and Surveyors 1111114�rl- .- April 15, 1999 Mr. Jay Barber Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Jay, Or M- l//9 99 I� Please find enclosed the red -lined "As Built" survey of the grading on Lot 47 Huntington Hills, Fourth Filing, Fort Collins, Colorado, which is 6107 Ashton Court. The grading was done in substantial compliance with the Drainage, Overlot Grading, and Erosion Control Plan prepared by Resource Consultants & Engineers, Inc. and approved December 1994. If you have any questions regarding this certificate, please call. Sincerely, Richard A. Rutherford, P.E. & S. meh 5028 L. James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 970/482-9331 Fax 970/482-9382 -Ge A --ASH �- 30 1 I yZq•L q•Z -/ o o �.��C• 4 \ Jam/ p r o - 4 �•LN ` .>', CA _ a.A lSt T.W. ZO �l��G..-I�ESL12/ PT[ON_ :_ (, o_T _¢7. %�'f1 NTLNG_TD.v_.f�/LL.�_P..-U-D ,F_.rc.w�_NO• �__, Ik =L6-Asp-�------ ....�. *VISTE.O- f09 L'C.�•GAAk•I{i ail • ��.v%1•t.,� s RIEW q,_�.uTdEre _Ore-D,_p,.:E•_ _LS. 5OG8 A AP'P-0-:-98 WED•-02:59_ PM CLA:=:•:IC CUSTOM BUILDERS 970 493 101E P.0 -� ,--..-. Wit_--.. _( --- .�{= ��--� -•'-n- �•' : �. �} .' = j.•, .• no ambne Rt.... �� ter ,mom now % MINIMUM ET , r DcTo 46 - -7f C4 / 1 2 6l07AJ:~rn.-. .... 51 \\. 4928.5 �I' r c.'Fj.(.' V J a9z9.o ' �--�---� � •' ;may F� 2�5`� I 1own N •t .S -.. 3 3 c, t� c NIL- r - 4 9 c 7.7 - Willow n1 .. ....... .... '' 0 75 -f- r Notas: SECTION C2-C2 1, Eacr, lot Owner will be responsible for grading and l0ndscOp1119 as required by the covenants in a manner which 69 cfs directs storm runoff to the front and rear lot lines. All foundations are to be designed such that the finished floor elevations shown on these plans is met to allo',v positive " drainage away from the structure on nil sides and driveways % 0 % - ' A _-_ ore constructed to provide positive drainage away fron', the . garage, .., SECTION C C Topsoil is to be removed and replaced to a depth of 6° -S 4 4 in all areas that will be disturbed by grading. '. Topsoil stockpiles are not to exceed 6' in height, are to be windrowed ]] 77 or roughened on top, and are to have a 2+ berm built around the toe (Windrows to be NE to SW). 4. A.; disturbed otaus not being paved ore to be reseeded 60 30 and mulched with ,. mixture containing 50 percent blue gromo ar 1 50 percer;; ,,.!ermediate wheotgrose drilled of a rote of G • ;i PLS; Ac, ana the mulch anchored. - - 5. Straw P.a;e dikes are is be installed as soon as the ( IN nwole has been final graded. 1 liluh == E. 1r;e s,4mp inlet shoe' Keep its inlet filter unti; Filing '. . t"61- nnf