Loading...
HomeMy WebLinkAboutLot Certifications - 01/15/1999 (2)K` r FOUNDATION I AND SOILS November 23, 1998 Commission No.: 4114-03-01-04 Engineering, Inc. 7 FA rAULWF706,01 Mr. Paul Schroer 2719 Beaver Court r Fort Collins, Colorado 80526 RE: Lot 27, Huntington Hills Fourth Filing ), Fort Collins, Colorado �DG/N��N��►a y,Us Gentlemen: On November 23, 1998 a representative of our firm measured the relative elevations for the top of finished floor and basement finished floor for the above -referenced residence. Based on a benchmark elevation of 23.9 at the southeast property corner back of walk, we determined the following elevations: Location Elevation Required Elevation Difference Top of Finished Floor 28.6 25.0 +3.6 Lowest Opening 19.1 Not Indicated N/A Based upon our observations, it is our opinion that the top of finished floor and lowest opening elevations are in substantial conformance with the grading, drainage, and erosion control plan by RCE, Inc., dated June 28, 1994. If you have any questions, please feel free to call. y ull wed by: A. cy� s��,w♦%,, =�055 .�, o P. Ham, S. James A. CheFr}c�'pR.E. nental/Earth Sciences Specialist FOUNDATION CMENGW` EERING, INC. /���j�n(1�0 a 0000� CPH 5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660 500 Kimbark Street, Suite 101 •Longmont, Colorado 80501 •(303) 702-0661 •Fax (303) 774-8413 :. . - - -�+..•-ram `..� �,..� i. ` 1 _`\ /ow 15" D !........ ADS 4913.1 201 DRAINAGE SHEE EASEMENT 4915.2 491, .... �_ 4913.6� SEE PROFILE SHEET 19 4 9 6 o c f s 171/1 IN G L .S D. + , RIVE ... ••. C,