HomeMy WebLinkAboutLot Certifications - 01/15/1999 (2)K` r
FOUNDATION I
AND SOILS
November 23, 1998
Commission No.: 4114-03-01-04
Engineering,
Inc. 7
FA rAULWF706,01
Mr. Paul Schroer
2719 Beaver Court
r
Fort Collins, Colorado 80526
RE: Lot 27, Huntington Hills Fourth Filing ), Fort Collins, Colorado
�DG/N��N��►a y,Us
Gentlemen:
On November 23, 1998 a representative of our firm measured the relative elevations for the top of
finished floor and basement finished floor for the above -referenced residence. Based on a
benchmark elevation of 23.9 at the southeast property corner back of walk, we determined the
following elevations:
Location
Elevation
Required Elevation
Difference
Top of Finished
Floor
28.6
25.0
+3.6
Lowest Opening
19.1
Not Indicated
N/A
Based upon our observations, it is our opinion that the top of finished floor and lowest opening
elevations are in substantial conformance with the grading, drainage, and erosion control plan by
RCE, Inc., dated June 28, 1994. If you have any questions, please feel free to call.
y
ull wed by:
A. cy� s��,w♦%,,
=�055 .�, o
P. Ham, S. James A. CheFr}c�'pR.E.
nental/Earth Sciences Specialist FOUNDATION
CMENGW` EERING, INC.
/���j�n(1�0 a 0000�
CPH
5110 Granite Street, Suite D -Loveland, Colorado 80538 •(970) 663-0138 -Fax (970) 663-1660
500 Kimbark Street, Suite 101 •Longmont, Colorado 80501 •(303) 702-0661 •Fax (303) 774-8413
:. . - - -�+..•-ram `..� �,..� i. ` 1 _`\
/ow 15" D
!........ ADS
4913.1 201 DRAINAGE SHEE
EASEMENT
4915.2
491,
.... �_ 4913.6�
SEE PROFILE
SHEET 19
4 9 6
o
c f s
171/1 IN G
L .S D. + ,
RIVE ... ••.
C,