HomeMy WebLinkAboutSite Certifications - 11/02/1993 (2)re D�aue ST`ria� ter.
127
Q ut"c ; I1/;1_/43
Mr. Glen Schlueter October 29, 1993.
Storm Drainage Department
City of Fort Collins
Fort Collins, Colorado 80522
Re: Sunstone Village Seventh Subdivision PUD (7th Filing)
Final Storm Drainage Certification —F-,,�21
Dear Glen,
It is a pleasure to provide this final engineer's
certification that the storm drainage and erosion control
improvements have been completed in the referenced subdivision.
The interim certification issued by this office on May 24,
1993 and Storm Drainage Certification dated June 29, 1993
confirmed that the storm drainage improvements had been
completed, and that a red -lined field survey confirmation of
elevations was forthcoming.
Said confimation is included with this letter. The
elevations show (as was expected, since I was directly involved
in the field construction activities) that the improvements were
built according to plan.
,-1 Accordingly, I hereby request that the Erosion Control
Escrow be reduced by 75 percent and that all building permits and
certificates of occupancy be granted for Sunstone Village 7th
Filing.
Sincerely,
Dennis L. Donovan, P.E.
Managing Partner
Land Development Services
309 W. Harmony Road
Fort Collins, Colorado 80526
cc -Geneva Homes, Inc.
01H1111111q 1
` p00�RF�o
a
9• 2 _
N1III//I111111111N11����"
Mr. Glen Schlueter June 29, 1993
Storm Drainage Department
City of Fort Collins
Fort Collins, Colorado 80522
Re: Sunstone Village Seventh Subdivision PUD (7th Filing)
Storm Drainage Certification
Dear Glen,
It is a pleasure to provide this engineer's certification
that the storm drainage and erosion control improvements have
been completed in the referenced subdivision.
The interim certification issued by this office on May 24,
1993 listed the following items that had not been completed:
I. The sediment trap at the upstream end of the 18 inch
storm drainage culvert in the detention pond area has not been
installed.
2. Seeding and landscaping of the detention pond area (i.e.
Tract A) has not yet occured.
3. The Final Storm Drainage Report must be resubmitted to
provide riprap sizing calculations and other minor revisions.
Field elevation shots will be obtained and shown on the drawings
as a part of the Final Engineering Certification.
All of the items listed above, except the field elevation
shots have been completed. I understand that Intermill Land
Survey will provide that information tomorrow or Thursday.
At that time I will submit the additional information as a
part of this certification, and will request that the Erosion
Control Escrow be reduced by 75 percent.
Sincerely,
Dennis L. Donovan, P.E..
Managing Partner
Land Development Services
309 W. Harmony Road
Fort Collins, Colorado 80526
cc Geneva Homes, Inc.
Mr. Glen Schlueter May 24, 1993
Storm Drainage Department
City of Fort Collins
Fort Collins, Colorado 80522
Re: Sunstone Village Seventh Subdivision PUD (7th Filing)
Interim Storm Drainage Certification
Dear Glen,
It is our understanding that this interim certification is
necessary to allow additional building permits to be issued in
the referenced subdivision. The improved lots and associated
storm drainage and erosion control improvements are, for the most
part, complete and functioning as intended.
Accordingly, this letter is provided to confirm that the
required Storm Drainage improvements have been completed in
compliance with the Overall Storm Drainage and Erosion Control
Plan prepared by this office for the referenced single family
subdivision; subject to the following conditions:
1. The sediment trap at the upstream end of the 18 inch
storm drainage culvert in the detention pond area has not been
installed.
2. Seeding and landscaping of the detention pond area (i.e.
Tract A) has not yet occured.
3. The Final Storm Drainage Report must be resubmitted to
provide riprap sizing calculations and other minor revisions.
Field elevation shots will be obtained and shown on the drawings
as a part of the Final Engineering Certification.
It is our understanding that all of the items listed above
will be completed in the next two to three weeks, weather
permitting. We hope that this eliminates any concern on the part
of the City regarding the subdivision improvements, and that the
City will allow additional building permits to be granted in the
7th Filing while these matters are being handled. S�3d/ A4_sJ'-,,,
Sincerely,
Dennis L. Donovan, P.E.
Managing Partner
Land Development Services
309 W. Harmony Road
Fort Collins, Colorado 80526
cc Geneva Homes, Inc.
D
93 .1
nod .r�i fs ,
ave � ca��r�as
lellos �rnn�S o�ol u
t C P.,C� il5
rr u .5/ ed-
-N`eAPa.-T
! I
CM4'LLTt /�KArNAL,t PN.✓ Ot>P/L �.f iJ
St[no.aJ C-C f
IfI
fir! p I R
SECTIpN CS J
A' .�.. ♦ i A�Pe N.
F}r :, n 4 �M•taF
N P rA..c (r I ILVSII ��ii
F,. $ /
L I ❑ /
Caw., A„ 3
- a
IR �
.., P/ s
"fir wr,ST -
r . N Pill AA
art, L a
p u
WINDRIVETERSNE A
J"all
o�"
WNNNNM
va .
17
sq
\ MILESTONE
°line DRIVE
SCALE' .50
Nap
LEGEND \ V
PROP CONTOURS
,welds r.., ti
EXIST. CONTOURS pBBG
N "SO
POST -
IV
A Oo
PROP. FINISH j' A°/rj /. e!I'("R
SPOT ELEVATIONS
MINIMUM TOP OF 88.8
FOUNDATION ELEVATION
(fRAMM[ DEOI ,
FLOW DIRECTION ARROW --;
:A
A. -
Al APPA
sMOF
T�
nr-3
20
E�s1e jwAr... wu,v
\ � a,
\ ''. I I II II
1�
OFLS/
e h
/i'
E
10
'N IN
\O fy
68p
fF �'
_24
,.p y
22 - _ B"' 6�'
5B'aLp'
Vie "Am
.��
Learr—I
(*A"m .s..ur p,
l„
o
E
te"-Ne
7
rV
=
M
ieAl 1
_
IRN eA t
p.
Al
Af
... .. 1
E,
P
y
T T
IT&
F5er5Rry
A-� �F
,Il4
.iA fee
�
x�
-,M. EPo.
-� lk (.—
- LEra•n jc.+KB
,PEAK , T GNL SAlAAL (,P
Al. stral AFpA Vasa FAN,
jLLTApAA D-D
3..w././r[.. n.qq}E Viet r-q
OIP-z.8 oh @p. 58 APTAC
Iw
i
/
R,..,,.t„L
ix:;sm��,x
c.,a q
L":
IIury M,t[b}
— body, Y•. SNI.m &rai
Ylw,lMIN
r
., lMul J yfWVAroRdlWRpnwrA UM
AN W T WITH GB FILTER
' �afwwwaw e.,,...e.UP in SEDIMENT TRAP
Mi rn.nr..
UP MIAMI 1 (i
�iwuv W
IF TY OF FORT COLLINS COLORADO
a nr,wi,m, STORMATER UTILITY
UPLAW
rert
Is, sWel
D zz
IIW Par SAF/I K(6.Ibf
I- rA2 el:da
F,tIF
—
1
IN AI TV'
IN
R E TAXI
1 SW.i
z
J L
.te
. $4V 11 r. de
ll
miness
IIIMmrAL W Mm M1w in
2. u mer,x U 12 p irgrm.M1w
qr a menel wwm AN mal War
�W;C Wall
all
Near I al Us Wall a 9 3 IN "I am lim el
,.VIVA
5 a.T',ncc 7w'
a u
nua „yylj—
AT, 4'I TZ
i '
NealNK4BVEn
•
VV 4
.....'•
�'`TM.
ep .Net
r�
1 .. IT1
.
L 1 C/i
--
P ATOP and,
O yP4'
plate Y A IA
—i
Ur CuLUNN"
MMP" Militia -1 �V FeleJ
PUP
PVP
Use Im
IIIIL
iZ- ^ H SECnaN A A
rm, m� P't CURB INLET FILTER
,......: 11 n.n.,
in
ban
a,..,rue,.
u„In•m r,u c.mm rom.
....... L..e..um nor nM,unv..en
_.................__........_.__..........._..._._.........__. ua,....m. GRAVEL
nm,.n, . , ,. B., , _ a,nuu., ll..n CITY OF FORT COwxS, COIORADO
+3d'rnudLLuJI, de,pl .. STORMWATER UTNTY
1 Invem reel III Ven mee.e D-25
OVERALL GRADING , DRAINAGE
a EROSION CONTROL PLAN
Red line
Retention Pond. A-0. I I
Storage Volume Requirrd: '.B AlFI � IL% E 1,0— VI H 5rYCJ+S
Storage Vol me Presided: 3.: Al
REAL an Pond Rl: 495efreeas.app -0./^
Area in Pond IL 7eFpod of a 4958.5 CC+�r �`' . Fall
I N(pro VeKLek+j
UA
-I
SHEET
6
OF
euideIll
till I
Arc
9Tu
Clans
F
X