HomeMy WebLinkAboutSite Certifications - 09/08/2005c Engineering Services August 8, 2005 Mr. Jay Barber City of Fort Collins Stormwater Utility 700 Wood Street Fort Collins, CO 80521 RE: Parking Lot Drainage and Roof Drain Re-routing at Faith Evangelical Free Church Dear Mr. Barber, This letter is written as a follow-up to the letter report dated November 16, 2004 (approved November 22, 2004), and is intended to document further improvements made to the Church site. The November letter noted a condition at the northwest entrance whereas flows from the trickle pan entered Wabash street instead of flowing east across the Church parking lot. A cross -pan was created at the northwest entrance to the parking lot such that flows from the trickle pan remain on -site (see attached photo, and as -built survey). The roof drains from the west side of the building drain into the above mentioned trickle pan. Although design conditions provided for overland flow of the roof drains, this created standing water and soft conditions in the amphitheater lawn and the associated maintenance issues. The attached sketch shows the location and size of additional pipe placed to allow the roof drain flows to be conveyed more efficiently to the trickle pan, eliminating standing water and soft conditions in the amphitheater. Haferman Enterprises, Inc. 6235 N Taft Hill Road Fort Collins, CO 80524 Phone: (970) 4"3103 ,aK&jj4Fd_2 q649 0 At the time the cross -pan was surveyed, shots were also obtained for the high point at the east side of the parking lot, adjacent to the detention pond. This area was found to have been constructed to an elevation of 5075.80, 0.2 feet below the design elevation of 5076.00. As stated in the November letter report, the additional riprap in the detention facility creates a rise in the 100-year WSEL of 0.08 feet. With the high point in the parking area constructed -low, the net difference in existing elevation and the necessary elevation to contain 100-year flows is 0.28 feet (5076.08 - 5075.80). A 4-inch high asphalt overlay was placed across the parking area high point to raise this area to an acceptable elevation (see attached photo). Should you have questions or need further information, please don't hesitate to contact me. Sincerely, Debra D. Water Re Haferman Enterprises, Inc. 6235 N Taft Hill Road Fort Collins, CO 80524 Phone: (970) 484-3103 Faith E Free Church Parking Lot - Pan added to maintain flowpath through parking lot. . wry_ _ filW i ---- ------ EXISTING C' w �p BE RE CE. ,SEE SHEET .k. IN Faith E Free Church Parking Lot - Elevated at high Point to 100-year WSEL No Text • 64a boo �f s - / RtrM ARIA \ y 17BRA �N y„ £j" R4 W AREA Eyt d,IYG 33uftbIN& G I nlat� LA tv N GX�S I1G AMIN Rf**OVR ra Ki,,A &OAML o✓7 &Z. Has Z-v (;"Vf ( — I-P *5 Snn� AM TOP S70A All X. hh OR/��N_ PA � I! I i zn,FFA 4'0 1-44t l�•S�-r c%.. i CNO W�W6: