Loading...
HomeMy WebLinkAboutLot Certifications - 04/29/2002 (12)NORTHERN ENGINEERING NESERVICES, INC. April 23, 2002 Mr. Basil Hamdan City of Fort Collins Stormwater Utilities 700 Wood Street Fort Collins, Colorado 80524 RE: Horsetooth East Business Park Drainage Certification Basil: On behalf of our client, Rincon Development, this letter is to certify the drainage concepts for the commercial building at Pad G at Horsetooth East Business Park. All of the improvements, and concepts, as presented in the approved drainage and erosion control plans for the site have been completed. These items include: There is positive drainage away from the building in all directions. Finished floor for the building is at an elevation of 4954.43 The storm sewers as shown have been installed per the plan Runoff from the site is conveyed by the asphalt parking and curb and gutter to the southwesterly comer of the property. The detention pond has been installed as shown, to include the release structures. The invert out of the pond is at an approximate elevation of 4946.40. The pond would overtop in an emergency at elevation 50.86, well below the finished floor elevation. Please call if you have any questions regarding this submittal. Thanks for your time and consideration of this matter. Sincerely Roger A Cliirtiss, P.E. Project Manager 27362 VAr 420 SOUTH HOWES, SUITE 202 1 FORT COLLINS, COLORADO 80521 / 970.221.4158 / FAX 970.221.4159