HomeMy WebLinkAboutSite Certifications - 07/21/2008North Star
`, design, inc.
JUL 1 7 2008
July 17, 2008
Jay Barber
City of Fort Collins
700 Wood Street
Fort Collins, CO 80522
Dear Jay,
This letter is to certify the site grading for Lot 2 at Timberline Plaza. The pond for Lot 2
was previously certified by North Star Design, Inc. in April, 2008. The drainage swale
on the west- and south sides of Lot 2 was adjusted from the original design to avoid
relocation of the existing utilities along Timberline Road. The asbuilt conditions on the
swale are represented in the attached record drawing of the grading for the site. The
information presented is based on topographic survey of the site provided by King
Surveying.
Please call me if you have any questions or if you need any additional information.
700 Automation Drive, Unit I Windsor, Colorado 80550
970-686-6939 Phone • 970-686-1 1 88 Fax
EA CM(
war
u roar
was
IX AP/OE"
PIGS 61M
wr NO Y
REMOVE? MYM
To ASSIMP,
REMOVE 42 IF a aRa AUTId AND ST IS Y6aa III, II
DP WALK (SEE NOTE R), SILL'° WOE TYPES . BIGHORN DRIVE
INSTALL n[rt TO ROW INEm HE r
WIDE
D'
Viz"
20 10 0 20 40
— ` I
I
s
— —
SCALE: 1' 20'
— _ —
_. —
— — — — =T -- —=
__•
CALL UTILITY NOT]
D CATION
- - -
_
_ _
OF CaaRADo
7570 -_ -
I
f
O
8OG 922-1987
WAX--
4wT _
.L
I---
- {,
} +i
Il
S GIFTSERON. N ADVAx¢
p A
DIG.
DRE YD IC. GAR. OR IIEAVAIE
1U
`
I i
E
R xlxc GwxD
��
,
TIEAS,
IAe[.P OnunEs
tO
1
I r
V
I 1 1. ___ __—_ I L LEGEND
fl�
E% E%ISTNG ELEVATION /FF FINISHED FLOOR Ec FL FLOWLINE ELEVATION mTIMBERLINE PLAZA AT"n+, - o r MCWA>YTOA TOP OF ASPHALT ELEVATION
BIGHORN ______L 4947.50 h)'TOW TOP OF WALK ELEVATION
/ RIM RIM OF STRUCTURE ELEVATION
; P pppK p FG FINISHED GROUND ELEVATION 2
I P i e i .eaPl i11 it �q WDNR. �� a r "s
TIME FD AT TOP OF WALL
I ? .(� i w 1 F� ry / / / BW FC AT BOTTOM OF WALL K a
a^ I I ry R I I( ) i i•�w LOT 1 O^T IU I PROPOSED I CONTOUR 2�
L ___ _________ R j ICE a.an ' —4770 PROPOSED 5' CONTOUR
T' Ts' R 5 E '� �� PAm �idAVERT "/ Nil ; ______ — EXISTING CONTOUR
I xt R P T ` ` SS
--= q)O=_ EXISTING 5' CONTOUR
PR.aP EuuGENCY ACCESS EA r / 7. B' VERTICAL INFLOW CURB
2 CMGEtE,( / , ' : / A "7 B' VERTICAL OUTPALL CURB
SIMM sEAEI RIER To s Eu3 4 V T N s j,. l Pax DRAINAGE EASEMENT o ry a m t j TI 3 FOR ELEVATONS a ~ E yy h� / I \ O O-
�' WxsmllLnoN IIIGMAna. i< 'F ' 1 i R / i yQ]E$
/'N I I. TRgNSTONS OF CURB TYPE (INROW. WMALL) SHAD BE MADE iO
Q L c R� I IN 3 ���(qqqjYPJ. ALL ON STE CURB WILL HAW 1 PANS v a
Q I I 1 �F „ N R Ag ,,/,' 2 PANT SECTIONS PER CEOIECHNICAL REPORT
! A GS "iOa V1i 3 `/ 3 D�ROQCg y,PAAPS LKS CURBSy PND DRIVES CONNECT O N O O
,
I
>I
I
I
I
I
I
�II
III
I
I
II
`,.
FF • 494820
a>9)
r STORM SEVER 2
LN,r Y K., r
FLAGPOLE
RAAP
A A/_
h-
h
f—
h
J 0
IX'A UW2Yf9/r �
[F -40S
•' -' 1
'I
'I
'4. LIMITS OF STREET CUT SHOWN ARE APPROXIMATE. FINAL LIMITS
ARE TO BE DETERMINED IN ME FIELD BY THE CITY ENGINEERING
,'
INSPECTOR. ALL REPAIRS TO BE IN ACCORDANCE WM ME CITY
REDRAR PGRD WEST OF THE
LOT 2 IF EASING TRAWL TO
'
STREET REPAIR STANDARDS.
AS p
i
;
0 MOVE DIMENSIONAL TAIPEI PUMPS
/
5. MERE `SHALL BE NO ODD SITE ORADNC FOR THIS PROJECT.
ARE AT M4nT
POND BOTTOM REGINDi I
IT
HOW
/ CREEP
;
3
a B. 'ALL DISTURBED AREAS (ON AND OFF SITE) SHALL BE RESEEDED
ION R YEAR W4941.Q
AND MULCHED (SEE LANDSCAPE PLAN AND DRAINAGE AND EROSION
CONTRO. PLAN).
S 7. DAMAGED CURB, GUTTER AND SIDEWALK EXISTING PRIOR TO
/ :..I
t CONSTRUCTION, AS DELL AS STREETS, SIDEWALKS, CURBS AND
Cl! B Lf R TRAL III
) CUTTERS, DESTROYED, DAMAGED, OR REMOVED DUE TO
e) AND
/
CONSTRUCTION OF MIS PROJECT, SHALL BE REPLACED OR RESTORED
�(SR t
wsUDMY WR. L (
PY.( CNC METAL SIDEWALK
IN LURE KIND AT ME DEVELOPER'S EXPENSE PRIOR TO ME
ACCEPTANCE OF COMPLETED IMPROVEMENTS AND PR T
/ 11 '.� 3FYJSC � IX PAY
Au.PAN AT LOM
rO
PRIM TO mw MaNC �rmU�mw� SUNSTONE SWALE (CITY OWNED)
REFER TO EANOSCAPE PLAN FOR
USED m HE REMOYFD.
/OR NOR TO HE
L ISSUANCE OF THE FIRST CERTFICATE OF OCCUPANCY. ME LIMITS
OF REPAIRS WILL BE IDENTIFIED IN ME FEW BY ME CITY
ENGINEERING INSPECTOR PRIOR TO AND OVER ME COURSE OF ME
PROJECT AND WILL NOT BE SHOMH ON ME PLANS.
8. ALL CONCRETE REMOVAL (CURB AND GUTTER OR SIDEWALK)
iii SHALL BE MADE TO A PAVEMENT JOINT. NO SAWCUTTING BETWEEN
ME JOINTS IS ALLOWED.
t;ll ,
B. A STRUCTURALDESIGN FOR THE RETAINING WALL IS REWIRED
I ICI AT THE TINEMEOFOF BUILDING PERMIT
SI II 10. EXISTING TREES IN ME CHANNEL AREA Sg1M OF MIS
PROPERTY SHALL NOT BE DISTURBED. TIME PROTECTION FENCING
j III., SHAJJ BE PROVIDED AROUND THESE EXISTING TREES.
p(
11. ME PORTION THE EXISTING DETENTION POND DISTURBED BY
I.I!i THE PROPOSED REGRADING SHALL BE SEEDED PER ME LANDSCAPE
:II PLAN. -
�iL
I MOVE Ex. OUTLET
S
" 11111 N.Nn We1111 " °TMv
EASTES 2Y SALLAP
INSTALL PCEOIMAIII
EROSION CONTROL FAKING
AS SOWN. COVER WITH 6-
Lrw SALD,PER
ANDSCAPE PLAN.
MAHLAN SPILLWAY
ELEVATOR AT 4941,44
VJ
w
Z
coM a
�Z a
0
Q Q
wa
i
x
O
LL
SHEET
4
4 OF 8
A, No. 102-19