Loading...
HomeMy WebLinkAboutSite Certifications - 12/21/1995STEWART&ASSOCIATES Consulting Engineers and Surveyors December 18, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil: Please find enclosed a red lined copy of the AS BUILT SURVEY of the drainage facilities at the Carmike Theatre located on Lot-l-Park-South-COmmercialPlaZa Miiuor_Siibdivision, Fort Collins, Colorado. All of the drainage facilities have been completed in substantial compliance with the approved plans. The completed facilities include the retention pond, the lift station, the force main outlet pipe, the subdrain pipe in a rock filled trench in the retention pond, the concrete channel along the East side of the project and the area inlets, curb inlets and storm drain pipes for the roof runoff. The volume of the retention pond is twice the volume of the difference between the 100 year developed runoff and the two year historic runoff The contractor would like the certificate of occupancy by Friday, December 22nd. Thank you for your assistance in this project. If you have any questions regarding this "As Built" plan, please call. Sincerely, lee UT••••�otsrEk� Richard A. Rutherford, P.E. & S. President * ; 5028 rsc 0 y. eel rti,. •.....• enclosures "jrFe n James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382