CERTIFICATION CHECKLIST
(Overall Site Drainage)
Please fill in all applicable items in this Certification Form for Commercial, Multi -Family and
Overall Single Family sites. A copy of the approved grading plan must be submitted with the as -
built grading plan. (It is preferred to have the as -built elevations written in red next to the
approved elevations)
Use "OK" for items checked or actual numbers for items verified/surveyed in the field.
Use "N/A" for items that are not applicable to the site that is being certified.
Please provide an As -Built Redlined or Mylar drawing showing the following!
INDICATES ITEM NOT CHECKED
A. Detention, Drainage Facilities, and Common Open Spaces
1. Pond Certification
OK • Provide Topographic Records and Volume Verification Calculations
OK Provide Pond Cross -Sections and Spot Elevations (especially @ Pond Embankment and
Pond Flow Line)
N A . Positive Fall to Pan (if applicable)
OK • General Pond Grading including all Side -Slopes
OK • Invert Elevation
N/A • Forebay Construction and Elevation
)VIA • Spillway Weir (Location, Elevation, Height, Opening Width)
N;A • Placement and size of riprap or alternative permanent erosion control measures
OK • Orifice Plate and/or Water Quality Outlet Structure Installation
NOTE • Water Quality Capture Volume (Volume Required, Volume Provided and Water
Surface Elevation)
• Berm and Embankment Compaction Level
• Subsurface Media for Water Quality Ponds and Swales
NOTE. A VARIANCE HAS BEEN ACCEPTED. SEE SUPPLEMENTAL LETTER.
W I NORTHERN
E NG I N E E R ANC
BIG DEAL SUBDIVISION
42. S NR'DRUM SMU
City of
FOrt COltins
2. Swales
NIA • Location (are they within easement?)
OK • Dimension and Cross -Section Verification
NOTE • Longitudinal Slopes and Side -Slopes
OK • Spot Elevations
OK • Permanent Erosion Control Measures (drop structures, riprap, lining)
NOTE • Tie-in to Storm Lines, Pans, Curbs, or other appurtenances
OK • Required Minimum Freeboard, Provided Freeboard
OK . Landscaping Infringement on Flow Line?
NOTE. SEE GRADING ASBUILTS AND REVISIONS. SWALES BUILT PER REVISIONS
3. Pipes
OK • Size and Type
NOTE • Slopes (As -Built and comparison to 0.4% Minimum)
OK . Pipe Capacity Calculations (if slopes are significantly altered from design)
NOTE • Invert Elevations
• Installation and Backf ill
OK • Cover
• Encasement and Clearance from other nearby utility lines
• Joints Type and construction
NOTE. ENGINEER DID NOT OBSERVE CONSTRUCTION. INDEPENDENT ASBUILT SURVEY RELIED UPON
FOR ELEVATIONS AND SLOPES. SEE ASBUILT.
BIG DEAL SUBDIVISION
NORTHERN
ENGINEERING 2 6215 MELDNUM STREET
For,. �`t��s
4. Concrete Pan Channels
N/A • Size
N/A • Slope
N/A • Cross Section
N/A • Thickness
N/A • Elevations
S. Inlets
OK • Size and Type
OK • Size of Opening for name of Standard Detail used)
OK • Grate Elevation
oK • Invert Elevation
OK . Box Size
6. Street Cross -Pans
N/A • Size
N/A • Type
N/A • Grade
N/A • Elevations
N/A • Cross -Sectional Depth
N/A • Tie-in to Curb and Gutter
NORTHERN BIG DEAL SUBDIVISION
ENGINEERING 3 621 S MELDRUM STREET
City of
/ �ftCottins
`�`
7. Culverts
N; a . Size
N'A • Type
N,A • Invert Elevations
N" • Headwalls or Wing Walls
8. Sub -Drains
• Size
• Type (Perforated/Solid)
• Cover
• Backfill
• Geo-Textile Liners
• Clean -Outs
NOTE: RETAINING WALL SUBDRAIN INSTALL BUT NOT VERIFIED.
9. Curb Cuts
OK • Size
OK • Tie-in to Swale, Pipe or other appurtenances
10. Common Open Spaces
OK • Overall grading contours of open spaces
OK • Spot elevations adjacent to private lots (property corners)
NORTHERN BIG DEAL SUBDIVISION
ENGINEERING 4 521 srne.Caurn STaEEr
Fort Collins
B. Grading certification
1. Certification of Grade Elevations:
OK • Minimum Opening Elevations
OK . Top of Foundation Elevations
OK . Comparison to 100-year Water Service Elevations
OK Comparison to Freeboard Elevations and Base Floodplain Elevations — BFE
NOTE: BUILDING ELEVATIONS WITHIN TOLERANCE OF DESIGN
2. Verification of Site Grading:
OK a Engineer to evaluate site grading compliance with the approved grading plan.
OK • As -built elevations are to be redlined onto the approved grading plan sheet
showing the as -built spot elevations next to the design spot elevations so
compliance can be verified and documented.
NOTE: REVS MADE TO PLAN. OWNER UNDERSTANDS REMEDIATION MAY BE NECESSARY.
C. Certification of Erosion Control Measures:
1. Permanent BMP Measures:
OA' a Permanent Vegetation (no more than 6" bare spots and weeds under control)
N,'A 0 Riprap or alternative permanent erosion material
• Riprap Bedding
• Cut -Off Walls or Channel Drop Structures Cross -Sections
• Sediment Basins
OK Water quality ponds/Sand Filter/Bio Retention Construction and liners
N/A . Permanent Netting Mats or Blankets
OK Mulching and Seeding
NOTE: WQ POND VOLUME IS DEFICIENT BUT PER ACCEPTED VARIANCE.
NORTHERN BIG DEAL SUBDIVISION
ENGINEERING 5
621 5 MEIDRUM STREET
Fora, ytdins
2. Temporary BMP Measures:
WA • Mulching and Seeding
NIA . Temporary BMP Measures as shown on Erosion Control Plan
NOTE: SITE IS PERMANENTLY STABILIIZED
D. Post -Construction Site Cleanup:
OK a Construction Debris Clean -Up (In particular debris affecting the drainage)
OK a Smoothing of Ruts in all Construction Areas
OK Reseeding of all Areas Affected by Construction Activities
(Usually enforced by the City's Erosion Control Inspector but the engineer
Certifying the site needs to notify the contractor if areas are not seeded)
E. Statement of Compliance:
This certification is signed and stamped and by signing this form the Engineer(s) attests
that they have inspected the site and to the best of their knowledge the as -built
conditions of the drainage facilities are as described in the above form and in the As -
Built plans enclosed.
Failure to properly disclose all known information could result in the rejection of this
certification and prevent the release of any and all Stormwater Utility permit holds on
Building Permits and/or Certificates of Occupancy within this development.
F. Signature and Stamp by a Colorado Registered Professional Engineer
Ryan O. Banning, P.E. `SS/ONA� EN /
Colorado PE Ragistrabon No. 44239
NORTHERN BIG DEAL SUBDIVISION
ENGINEERING 6
fi21 S MELDRUM STREET
■� NORTHERN
ENGINEERING
July 14, 2014
Wes Lamarque, P.E.
Stormwater Department
281 N.College Ave.
Fort Collins, CO 80537
RE: Big Deal Subdivision
As -Built Pond Variance Request
Dear Mr. Lamarque:
Construction of the multi -family building approved for Lot 1, Block 1 of the Big Deal Subdivision is
nearly complete. We have been retained to certify the drainage facilities. The pond volume cannot
be certified, however, as built due to a deficiency in volume created by incorrect parking lot
elevations. The parking lot, containing a large portion of the major storm volume is nearly 2" high in
the area of intended ponding.
Due to the above listed issue we respectfully request variances to the following sections of the
Stormwater Criteria Manual
Section H(3), (Section 3.1.3) requiring the combined WQCV and 100-year storage volume
for detention ponds.
As constructed 53-cf of WQ storage is provided on top of the required 100-year volume of 649-cf
for a total pond volume of 702-cf. We propose that 52-cf of the WQCV would be contained within
the 100-year storage volume, assuming that the capacity would be for a single storm with sufficient
time delay between storms for half of the water quality volume to drain.
As constructed, a portion of the 100-year volume will be released at a slower rate than designed,
being forced to be released through the water quality plate. This volume is small relative to the
100-year volume and will have a very small impact on the overflow condition; however the pond
will overflow slightly before when it was designed to, assuming that the provided water quality
volume is fully occupied at the time of a 100-year storm.
A small amount of water will be held within small depressions created during re -grading. This is
overlain by landscaping rock and will normally not be exposed to air while held for infiltration.
301 N. Howes Street, Suite 100, Fort Collins. CO 80521 1 970.221.4158 1 www.northernengineering.com
NORTHERN
ENGINEERING
We do not anticipate any additional cost or risk to the City or the public health safety and welfare at
large due to this variance. The result of this variance is that a higher rate of overflow will be
expected to the inlet within the alley behind the property in very large storm events although it
should be similar to existing condition. Emergency overflow beyond what would be intercepted
assuming an inlet surcharge is expected to route to areas currently receiving similar flow within the
alley and follow currently accepted flow pathways.
Thank you and please let me know if you have any questions or concerns.
Sincerely,
NORTHERN ENGINEERING SERVICES, INC.
Ryan 0. Banning, P.E.
Project Engineer
301 N. Howes Street, Suite 100, Fort Collins, CO 80521 1 970.221.4158 1 www.northernengineering.com
•
i
Pmcrn uM
.u.x sm wx�
.rrio a dW
Moves ooe+wcroto 1
Po. r r0or ,O 2> FEE,
L.a,«K auNa
mo RaPRi uYasn/MED) Y-
�raa=La,. uM
,ar r axm
I ,re a rui
r•
rtvn Pnvbl
x
rns.IwN
Dray
/
it wr,wJ
v�
kANAM
I
DnMe9
1
1
abLLu
L.Els,wr. rIM .L DD ,D D.nu+,
PAD
CROSS SECTION A -A
MB
CROSS SECTION B-B
GRAPHIC SCALE
® NORTH
1. D Io nrw
LEGEND
gi6SRM1 p}1pMY
LYJSNL SrQN SMR IlE N/ YM �'. E
Lti5M4 MLLi GR.1! -
ParaLD rurtaw —_
osom cw,our
muasn mxL —
rRaa4n .rEDr acre a amEn
ww�D so, runrlDN
eYMmc m T nLv.,nx .y
FPa wrLas _
.wD ..Im. 1. ..0 m ..*D c. �Ina.'i ...A .I eE ... 1. rvnM P[Ka.nM
NOTES
i of va oK.w wCY" DP.u. a.II.C-I:
V,uMs AM .M A wp Scr ON ➢[Y rs.n-,:
t g...0 ; M Mso69+n V M Cpwb rtw I E
Ensnw¢ a .Fx anrwwaw Uu w nM ..-.
M M4LM NNOKan rMr QMS,wK1W. nE
cWAACIACP pf 9M i M9MA,, rOq tannW ra
NCEPP10.N0 N CD AN SxxLL M M9 K9F rtl1 rat
ML N.wW UiCPQpMC VM1M5
2 tRP PD 1ME Mi rq 1., MLK R.ii soM EADoANm
.��.� MYIS OTEA EASrYd,S .M
1 Iµ PMRx Wn Is pY M or, oF IM C(VM KFMLL
WTW: FLK L (NYbL51f4) SE L01q 9i[i r[R
IUIOYYM[1Oo943.
l .M 41M00 bM[ �Y• rRLY.nWD µL OT[It SOR
RECORD DRAWING
0.Y[S wC..M L.4➢. «ML V.V, w.._
nuYnmlonu,uomaa
caarbo
•
City of Port Collims. Colorado
UTILITY PLAN APPROVAL
y Duee
et—
�
1�
B
>3�
9i
z
Q
J
a
0
z
0
Q
c�
snag
C3.00
Of 11 sheets