Loading...
HomeMy WebLinkAboutSite Certifications - 10/23/2000STORMWATER OCT 0 2 2000 September 29, 2000 Mr. Jay Barber City of Fort Collins — Stormwater 700 Wood Street PO Box 580 Fort Collins, CO 80522 ft) J•R ENGINEERING A Subsidiary of Westrian Re: Certification of Storm Drainage Facilities for Oakkridge_Business Park 30`h Filing (Hercules Expansion) Proj: 9097.05 Dear Jay: Centerline Layout Services provided JR Engineering survey information of the existing storm drainage facilities for the Hercules Expansion on September 7, 2000 and September 26, 2000. In addition, facilities were reviewed in the field by Michael Oberlander on September 20, 2000 and September 29, 2000. As a result of these items, we offer the following for your review and comment. 1. The sidewalk culverts on the west side of the building are in general conformance to the approved plans. The upstream ends of the culverts will have their openings cleared of the landscape rock. 2. The curb cuts in the south parking area are in general conformance to the approved plans. 3. The parking and yard areas drain in general conformance with the approved plans. The southwest corner of the yard area (concrete) has a ponding area that will be repaired. 4. Riprap appears to have been placed in general conformance with the approved plans. 5. Both detention ponds meet the detention and water quality volume required in the approved plans and drainage report. See redlined drainage plans and volume calculations for details. The trickle pans shown in the ponds appear to be in general conformance with the approved plans. Both spillways require some fine grading to be in general conformance with the approved plan. 6. All drainage pipe has'been constructed in general conformance with the approved plans. See redline plans for more information. The orifice plate at the outlet of Pond A will either be moved to the joint between the FES and the first pipe length, or grout will be installed between the edge of the FES and the orifice plate to make the orifice work properly. The orifice plate that was mistakenly installed on the downstream end of this pipe will be removed. 7. The water quality structure has been constructed in general conformance to the approved plans. It will be modified slightly to cover the opening that exists between 2620 Fast Prospect Road, Suite 190, Fort Collins, CO 80525 970 491-9888 •Fax: 970 491-9984 • www.jreng neenng.wrn the water quality plates and the overflow grate. This modification will not change the operation of the structure. This letter certifies that the items listed above are in general conformance with the approved plans. It is my understanding that all items requiring minor adjustment will be completed within the next two weeks. If you have any questions or comments, or need additional information, please do not hesitate to contact me at my office. Thank you. Sincerely, JR Engineering Michael Oberlander, PE, LSI Project Engineer ; a Attachments t ,•,_ „, ...,,;;,',; , V.0 .0 88 O UAL LOCATION: PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: Detention Pond - Stage/Storage POND 9097.05 MPO 09/29/2000 V= 1 /3 d( A+ B+ sgrt(A*B)) where V = volume between contours, W d = depth between contours, ft A = surface area of contour POND C ...Storage Total Detpond.xls Detention Pond - Stage/Storage LOCATION: POND B — CoL.ES PROJECT NO: 9097.05 COMPUTATIONS BY: MPO SUBMITTED BY: DATE: 09/20/2000 V = 1 /3 d (A + B + s9rt(A•B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour POND C Area TotalSurface Storage 100- V6L-urHEE _- bE ► = 0. 2-9 AAc.- rr Detpond.xls DIM" raaa Ilv.al rs .� � na.a.e m+ 1 It wl.l sev.w,. Nva pent o of the Motho Anytheyer I. ...nxh_WrrAAy.hehV:eM�.ak.�d.,.. e.�.».n�.,,e.. ...�.,, ...,..a.� My Any, to I not. In.. 1. do.',,. 'All. W. thenehe An A n beh e.m.,.:.< new Been a A.mm yen �o�.nn mn.. beheyiennyuhhe they Al home l of the And h neeknel nor Aphoprot by 'he hin. .1 Iny he Any An An old AREA oneueer Alow k °W "AnneoWhey h,,hI 'A In he h not m Anne Pon. •®,...�µ�.Xu...» o,. m,..., he I, prehi e My W oho', l 1.0 AlkleV pl ., be An. a.e ho t...e ne eAt IN hot or"ohn, Any R.at a'mod All Ipm aBe ....V. trse iwln they. m`.At lval mho. —�•_ — �, ...... — rMe _-_ eas_.— int on �Iccxa._ �_. ,an x.....,. a POND A ORIFICE PLATE AND TRASH RACK let lom My ,�wAll . _l 7 om. It;A ` "I onN.a. a. n+.wN A IN" (w ) Why a V le in AYw,..-Raw I Raa a hoar e. ,.R...e. V/OCV Outlet Structure Plan Mew —Flared Wlnywall Abil AM Ile W Will OwiP Wass n.rt ID 00 ORFICE DETAIL NOT To WAIT .hoer .at t he All Money "Al Abe At Annee a_>M — All l/\ Mati�Niw...rr P oUM1FT MEN BRAVE MT ..j 1 µµawl? `Fed nam Ma w.wI rho. Met MMMda AAFI, Vey rvn.yr+M s w b.�.. IV not VIM VA ... de"`...MM'n� µ.who, 51"Ne .mn Men My AM AM Robotshoe.µ w — nn+a Y beffib nE ...,.et AMAN � AI .. � _ it a..e.,, went .0 I-- N.no.xw.N ro••. w ma.t o-w,n aV.nsr.� w0.eMa••y� .°."°"X on �� Vown s—i4m CZ Aa.-LAW At p)AIMe..Y bent ,yea-. .then m m q...w my E° 9 NTILIES 1 Am _` mal ,jl ..v IAmin rc MAW All I ARAM am I g u �Al 4� �� ,hoe ia IMFT ITN DITCH PAVING 'xT GRATE INSTALLATION DETAIL uo 1 WAV_mCN PRA, WIT VI. _ MAW ineelkli �� a CONCLAEVWWWRETE INLET T .x.�.11VAR n.vMy hw� An VIM. Ili m Vion,aa m` ID ,,. ,..xe, %ci,D ...dhoWell AllAREA my I w ..m ...a ...\...�m.�.7.a.a t waaA . - R ala. I -.�T I INLET CONNECTED TO A CROSS CULVERT POND ITUM awn '"a 2Z'•"_ smol o- AM DWERAK At I. L'-J81�C21ktii mirell pp �� v my%I6:>•RURcv u..ansaua.�wEN �I� CIALIAVAIM DEPARTMENT Or TRANSPw 'e' x" G INLET, TYPE C INLET COXXELIED TO A CLOSE MESH GRATE SXEWED CROSS CULVERT INLET AT BOTTOM s m OF VERTICAL CURVE STANDARD INLET GRATE m z�valmMIN ewX0V.1 CE CONSTRUCTION ENTRANCE � so. Mryy�i I/Y-]p" G�Oa���Su��NOe u 1. Ixsvrm AND REPAIR wA.EL HUExs .rrzrs EI.OI STORM!EVENTME . REYMh YEluwl WEN r OF THE nLIErs EErIN IIn2 9Efx FILLED, rsEYEYED 4ONENi SHNL 9E IXrG91ED IN AN AREA 1NB` 1PNY 10 A SEOKHI BASIN PI DIEx LnNIHE YEI91M. a grtovm comma ueaxrzxaXEE Is THE EIDCM51%IIY OF ME DEVELOPER, Maa.NA.x NOT TO SCALE M an MIN. ON CONCRETE PAVEMENT DESIGN + 1/2' 2' TRICKLE PAN CROSS SECTION NOT TO SCALE LENGTH SPECIFIED ON PLAN I �DRAINACE PLAN 8 l CURB CUT CROSS SECTION NOT TO SCALE CHECKED by An ec g`�gY J y � .E cktr 1 J 'J City of Fort Collins. Colorado (=j 1-- PREPARED uwu THE DIRECT EUPmNBa OF UTILITY PLAN APPROVAL (r o APPROVED: 3 1Y oo W S MY r^V^ 0.\. CHECKED BY: ILL „I+.. 7,•-r•►7 m O who\. A w.u..aL. uunr CHECKED BY: III— y MIN m CHECKED BEY.— O Pab k Rww1Yn 0.w BY: SHEET 6 OF 9 i.allk En9F°w Mho CHECKED BY: Ool. 9NOB 7 � R 0 C(TO F=R1 RWATER INSTAIL T. TIMING SEND W/ T 5' G.Y. Ale sary W/ PR6 sl wo METER I I I _ J OAK RVOE_ OPoYE __ cArsMy_6_FHw.An. az.rA ---____ _ ____________ _ 4 >aw II ` ---------- I I 31 I , 11 i i _------ K'� I En(!b4 Y. 17W r[nxa I 1 ell l l rI /#WCUL F$ AVUSMY# WIO 'MAO METE' ___- J _ .. 1 I I ! 1 I EMTIYIC WML TO MIIMI � II maPoxo lLNa� WA16�ypyrUy8E1 O� EWm OOF II II _ . PAtEAI �I --At EPSTHC INTL ro TIE RETAINED 1 u II s' a'ICIU W/Ts 51 P 114.14 LF S' OR 17=1 1 1 I 1 I l I 1 I I -2a-t I 1 I l I 1 I I I l • I I— --------_ ME sTESEE STREET WALL xENiIT YARIET Ir EI R l 1 1 I I Ili I I I I I l I / � I / IT I / I —LtlSM rNI /IIDRAN) UPOR E an[a A (MAT '1 (WIOIFlTxxG NR 1 I I i I I N IAIW - 4N Mnxrn we INV aw �YAO M1 s IE me .vWrP IN Aldf x -WV- 4RSS!) (F) nx . 445564 MI v oar - In564 (4/ I � I I I PRWMH) C5- SOWAUX I I I I I I I I ' I IIE DOW I I I I OF &S WC ATM I 16 AMIT 1. PAIP 1 YF IIGR 1. I rTr am (simm1 M1EC As smir 1 eosx mrwu. `I.RSrwp u¢ YNFT AN AMR - (suss 'wan IssKm MJ V au o TYPE 4967 M1 4961 �w 4958 4958 i< d 4955 4955 o F P m 4967 r1lYj mwxD - wsrG° 4964 0+60 LlE 8T-1 3os:3 4967 m PROP. 4964 0 9961 Ex. 1w STORIA ww (OMOTE ENCASE JOINT I✓ EACH TIME OF WATER TO CENTER APRrs ARaxD WATER LH 4955 0+w 0160 LIE ST- 2 4967 �AY ` 4961 4955 I O IS 0 J0 60 SCALE: 1' = 30' LE(i ND PROPOSED SANITARY SEWER -----w--- EXISTING SANITARY SEWER PROPOSED WATERLINE EXISTING WATERLINE PROPOSED SANITARY SEWER SERVICE PROPOSED WATER SERVICE :___'____'= EXISTING STORM SEWER Will PROPOSED STORM SEWER INLET PROPOSED STORM SEWER CURB STOP It METER VAULT �W♦— Y PROPOSED WATERLINE TEE •• PROPOSED WATER VALVE NQTE 1. LIMITS OFF ASPHALT REPAIR TO BE DETERMINED IN THE FIELD BY THE CITY ENGINEERING INSPECTOR. 2. ALL DIP WATER MAIN TO BE ENCASED IN POLYWRAP. a S 3. WATER LINES TO MAINTAIN A 4.5' MINIMUM AND A MAXIMUM DEPTH OF BURY MEASURED FROM FINISHED (BADE. 4. ALL FIRE LINES TO BE CONSTRUCTED USING DIP. 5. ALL RCP To BE CLASS III. 6. ALL STORM PIPE LENGTHS ARE OVEN TO THE CENTER OF THE STRUCTURE OR END OF F.E.S. 7. ALL STORM PIPE SHALL BE INSPECTED BY THE CITY OF FORT COLLINS. o 0 1Y n �PAIAI ASEXE CEQr 4-?,i-� FIlPII® UOF11 TIC DHC! CNIILAeY ? u m m Zo O_ Z J ZQ O a Zw w_ W w0ILIAin Z F 0 Q Ld J Q Fao O City of Fat Collins, Colorado U J O U UTLItt PLAN Al M -t N m w wM i— APPROVED: 3I tX5 = > 0 Py . ftI F- 0 Z fY CHECKED BY:_ D• Olt, D I�AA,II w.I A woH..niw r D.T. M 1� Q W CHECKED BY: •�-/6 pp 3 SIwm.olm TIT It mIa Ei CHECKED BY: fO PT M• A R•ealM Ge\• O CHECKED BY: SHEET 6OF 9 n.IIK EAeII.w mt• CHECKED BY: JOB N0: REV. wt• 9097.05 0 I I I I II , + _ 969r. + 47 II II+ ill I � A y 102 1.D5 ac r4s 2' CONgVEIE PAN - I METAL SIDEWALK CULVERT METAL SIDE%rU< CULVERT I 2' METAL SIDEWALK 06 9! r TYPE M RIPRAP 9" aYPE M I 5W x 15'�� B r3' CURi3 CDl q ,. CONO I II t wo- .n- \\.. l ` `POND B 10 J -' 012 'a II II II II I I I 1 1 I 1 r II 1 I I 1 � 28'W x 8L. _(BURIED) V I f 1 1 ' 1 r I I I 1 I I I I I I 1 1 I I DRAINAGE SLWARY TABLE Design point T16aWy SWA" AIM In) C(10) C(100) LOU) (aDR) he(100) (min) DOOM Ic1e) CI100)lil (fi) U 2 - 101 _ _ _ -_ 102 01% 0.88 1.110 6.0 50 22 5A 1.05 0.87 -I O.N 12.0 8./ 2.5 7.0 _ 3 103 0.14 0.10 1 0.13 7.3 7.1 0.1 02 4 _ 10E BID 0.77 1 OAB 7.4 SO 0.3 1A _ 105 ON 0.10 0.13 0.7 0.8 0.1 02 108 0.78 0.91 im 6.0 5.0 0.7 1.9 107 0.31 0.87 1Ap SA SA 13 3.1 7 101+107 0.88 0.07 1.00 82 5.0 3./ 83 8 101+107+106 101+1UP+101N05NU8+107 _ UAS 0.87 1.00 6.8 5.0 - 4A --- 10.4 MIT 5 2M 0.70 DA 12.0 5.e 0.3 OS1 OFFSIIE U21 _ 0.78 0.98 14.0 14.0 0.1 BA s Wot) AT DIPS INCLUDES CARRYOVER FLOW FROM DP OS1. L�A13Vk POND A POND 0 100-YR WSEL vi961.af(4fs -4 9 Aw5.z DETENTION VOLUME PROMDED D JT14TI I VOLUTE REWIRED a%e-.w AC -FT 017 AC -FT 0,10,040rAC-17 0.25 AC -FT MAX. RELEASE RATE 0.5 CFS 0.7 OS OUTLET CONDITIONS 18' FES w/ 3.8' on har NO STRUCTURE W/ 4.80 UTA, ORIFICE SPILLWAY LENGTH, L 22 FT 20 FT TOP OC BERu y988.%UDBP 5964.0 $PILL DEpiN, H 0.25 Gi 0.75 FT 7MVII . I. THE DETENTION POND SHALL BE OWREXCAVATED TO PROWOE A SEDIMENT TRAP AND SHALL BE COMPLETED PRIOR TO ALL OTHER GRADING ACTINTIES. Y. BMP DETAILS ARE LOCATED ON SHEETS 7 AND 0. 3. ALL AREAS NOT TO RECEIVE PAVEMENT AND DISTURBED FOR MOVE THAN 30 DAYS SHALL BE SEEDED AND MULCHED. 4. ALL TYPE L RIPRAP TO BE BURIED AND RESEEDED S. RIPRAP DETAILS ARE LOCATED ON SHEET 8. LEGEND - - - EXISTING 5' CONTOUR - - - - - - - - EXISTING V CONTOUR PROPOSED 5CONTOUR PROPOSED 1' CONTOUR Qj DESIGN POINT xxapc BASIN ID AREA IN ACRES FLOW DIRECTION Iffffff� I� BASIN BOUNDARY EXISTING STORM PIPE I� Ifs PROPOSED STORM PIPE of FLARED END SECTION SIDEWALK CULVERT INLET LOCATION Osow-I-witer EROSION BALES SILT FENCE OINLET PROTECTION OCONSTRUCTION ENTRANCE ST SEDIMENT TRAP Y � ROCK RIPRAP '.I 100-YR INUNDATION AREA 18' TYPE L RIPRAP (BURIED) 4 1 1 4 TOP OF BERM l SPILL ELEV. - 100- WE \ ICY BPILWAY 06TA0_ N.T.S j 30 15 0 30 1 � 1 SCALE: 1• - W' EI July, 19% The City of Fort Collin Stann mm unity rorean contra inspector must be nabned at lease 24 hours prior in any construction an this site. All required prlmeler an fencing shall be Metalled prior to any land distmbing activity (stockpiling, stripping, grading, te). All other regWred erasion control measures Mall be Installed at the mimosiatr time In the construction sequence as Indicated In the opprowd protect smem,le. construction plans and roslm control report. Pre -disturbance vegetation shill be protected and retained wherever passible. Removal or disturbance of existing vegetation shill be limited to the arm required for Immediate construction operations and for the shortest practice prod of time All cols exposed durkg land disturbing mArd y (stripping, grading unity installations. B) alockping. filling, etc) when be kept M a roughened creation by ripping or dicing along Ix-1 land contours until mnm vegetation or other permanent anon control Is Installed No minx in areas outside Project street rights of war mail remain exposed by land disturbing activity for more man Thirty (30) days before required temporary or permanent erosion contrd (e.g. seed/mulch, Imdecepbg. etc) is Installed. unless otherwise apwawd by the Sturmwatr utility. The property shall be watered and maintained at all items during construction Activities to Prevent wind -caused express. All land disturbing activities shall bemm iediately disasto when wgniw dust Impacts adjacent properties. as determined by the City of Fort Coal Engineering Ocparlmenl. All temporary (slrucbne) aasim control measures shall be Nsp«t al and repaired or reconstructed as necessary after mill runoff event inorder toassure continued performance of their Informal function. All retained sediments. particularly those an wood roadway surf«en, shall be removed and disposed of in a manner and location so as not to cause their rennam Into any drainogeway. No suit stockpile shall exceed lac (10) foul in height All sal slockpkes shall be protected from sedinmt transport by surface roughening. entering and perkneler all fencing. Any mil stockpile remaining after 30 days shall be Beetled and mulched. City Qtlbonce probbits the tracking, dropping, ow depositing of mile or any other material and City streets by or from my vehicle. Any inadvertent deposited material shall be earned immediately by the contractor CONSTRUCTION SEQUENCE run r, M e7r Y�L +an er m� IM, � wwne,lnee � nM•.r.mua a our enrrk. i wee weeweew m ftlnl�r me 11,000 shefteng we wxwIIIIIIII� m owwwr IIIIIIIIIIIIIIIIMI m,wwn kewixesse,.' swe I, WADING x urerum n ICY® hwmxorNxas mnxrchm n mrt rAnhm hoar urea n on v iron. when ore LB gs D Vlum Tar [HART wF[RNSIW OF City of Fort Collins, Colorado UTILITY PLAN APPROVAL APPROVED: 114 olr troneiv CHECKED BY: N� j Wvl/s/ a ono CHECKED BY:'ry a /• ,Y Slwmw le Unity CHECKED BY: PaN A xe>wDm CHECKED BY.' - Imes, E,96ee CHECKED BYe - II n 30 � Q m O fit X W W (n w a ILLI o_ j Z -1 O O U W MQ11 Z r D a W M -__-1 Sam m Cl- SHHEET 4 OF 9 JOB NO, REV. 9097,05 0