Loading...
HomeMy WebLinkAboutSite Certifications - 06/08/2016Project Name: Pateros Creek Ap QNM J — 4.�) L Date: 5/24/16 //I (gl/)6 Building Permit Numbers: (Commercial or multi -family) Per the requirement in Fort Collins Stormwater Criteria Manual (FCSCM) Volume 1, Section 6.11, please fill in all applicable items in this Certification Form for Commercial, Multi -Family and Overall Single Family sites. NOTE: several items must be verified during construction. A copy of the approved grading plan must be submitted with the as -built grading plan. (As -built elevations must be written in red next to the approved elevations.) • Use "Yes" for items completed as described. • Use "N/A" for items that are not applicable to the site being certified. • If any blanks are "No," attach an explanation referencing the item number below. Attach an explanation or description of the as -built condition for any items listed or for anything not listed but shown on the approved construction plans. Provide an as -built redline or Mylar drawing with the following: I. Water Quality and Quantity Detention Basin Certification - FCSCM Vol.2, Ch.10 For multiple detention basins on a site, provide the following for each basin separately: A. Volume: N/A As -built topographic verification is attached at 1-foot (or less) contour intervals and volume verification calculations for the water quality capture volume and the 100-year detention storage volume. 1. N/A Detention basin topography was prepared by a professional land surveyor registered in the state. of Colorado. 2. N/A Both proposed and as -built contours are shown on the same plan sheet (dashed lines for proposed and solid lines for as -built). 3. N/A All critical spot elevations as shown on the approved construction plans have been verified and the as -built elevations are shown on the plan sheet. 4. N/A Stage -storage -discharge tables are provided on a separate document. 5. N/A Verification that designed drain time is in compliance with Colorado Revised Statute § 37-92- 602(8) is attached and has been uploaded to the Statewide Compliance Portal (tinvurl.com/COComaliancePortal) for approval. Uploaded documents must include: a. The cover sheet from the approved drainage report b. The stamped certification page from the approved drainage report c. As -built topographic survey d. Stamped certification page from the Overall Site & Drainage Certification e. PDF output from the Stormwater Detention and Infiltration Design Data Speadsheet 12/15 Page 1 B. Water Quality and Quantity Detention Basin Grading: N/A Attached is as -built verification that there is a minimum 2% positive fall into the concrete trickle pans or flow-line(s) from all areas in the bottom of the detention pond. If there is a "soft pan" in the flow -line, all areas still must meet the minimum 2% grade requirement. 1. Low Flow: Choose one of the following detention basin low flow options as applicable: a. N/A Turf swale for low flow path in detention basin. There is a minimum 2% grade in the flow-line(s) of the detention basin. The flattest as -built grade is b. N/A Concrete pan for low flow in detention basin. There is a concrete pan installed that meets the grades as shown on the approved construction plans. (Show as -built spot elevations.) C. N/A Soft pan for low flow in detention basin. • Verify and document the soft pan material gradation, trench width and depth -to be verified during construction by engineer. Picture documentation is preferred or engineer's statement of visual inspection and compliance. (Choose one below.) o N/A There is a soft pan with an underdrain installed that meets the design on the approved construction plans. (Show the underdrain grades, bedding material, geotextile, spot elevations, bends, cleanouts, etc.) o N/A There is soft pan installed without an underdrain but there is a type A or B soil. The soil type must be documented by supplying verification from a registered professional geotechnical engineer. NOTE: Spot elevations are to be within 0.2 ft. +/-. 12n5 2. Side Slopes: N/A The as -built side slopes of the detention basin have been calculated and are shown. Indicate the side slope with an arrow and a numerical value (e.g., 6.25:1). The maximum slope allowed is 4:1. Small areas of 3:1 may be acceptable, but slopes steeper than 3:1 must be stabilized or re- graded. Provide documentation if a variance was granted for steeper slopes during the design process. 3. Spillway Certification: The following items must be field verified: a. N/A The location of the spillway is indicated on the as -built plan. b. N/A The width of the spillway is indicated on the as -built plan. C. N/A The elevation(s) of the spillway is shown on the as -built plan. d. N/A A concrete ribbon defines the location and grade of the spillway. e. N/A There is downstream scour protection in the spillway as per the construction plans. Indicate type: (riprap size " D50" gradation and bedding type, geotextile, buried riprap with inches of bury, etc.). f. N/A There are no obstructions in the spillway, such as trees, bushes, sidewalks, landscape features, rocks, etc. Page 2 4.Outlet Structure Certification a. N/A The orifice plate for the approved release rate is installed with the correct size and location of the orifice. b. N/A The orifice plate for the water quality outlet is installed with the correct hole size, number of rows and columns of holes. C. N/A The bottom hole on both the water quality and quantity outlets are at the bottom of the plate so no water ponds in front of the plate. d. N/A The well screen is the correct material and is installed as shown on the construction plans. e. N/A 100-year overflow grate elevation is . (Elev. A on detail D-46) f. N/A The top elevation of the water quality capture volume is (Elev. B on detail D-46) g, N/A Overflow grate is made of the correct material, has the correct bar spacing, is hinged at the top and bolted at the bottom. h. N/A The bottom of the outlet box has no obstructions or misalignments that will cause it to retain runoff water and is sloped at 2% towards outlet. II. Channels/Swales - FCSCM Vol.1, Ch.7, Sect.3&4 A. Capacity: N/A The as -built capacity of all the major channels and swales has been verified. They meet or exceed capacity requirements shown in the approved drainage study for this project. 1. NIA All swales are located within the drainage easements as shown on the construction plans. 2. N/A Longitudinal slopes and side -slopes (cross -sections) have been verified. Design criteria requires longitudinal slopes of 2% min. (on vegetated swales) and side -slopes no steeper than 4:1. If these criteria are not met, the certification engineer will write a justification and propose mitigation for each instance or have the issues corrected. If variances to these criteria have previously been approved and are shown on the construction plans, no justification is needed. 3. N/A As -built spot elevations on channels/swales are shown that correspond to spot elevations shown on the approved construction plans. 4. N/A All permanent erosion control measures are installed as shown on the approved construction plans (e.g., drop structures, riprap, TRMs, etc.). (Include pictures and verification of the materials used as part of this verification.) 5. N/A All pans, curbs, storm pipes or other appurtenances appropriately tie into each other in the system. (Pictures at tie-in points suggested.) 6. N/A The minimum freeboard is provided for all channels and swales as shown on the approved construction plans or as identified in the approved drainage study. (Show the freeboard provided on the cross -sections as on the construction plan set or attached as separate documentation.) 7. N/A The low flow portion of all channels or swales is clear of obstructions. (No landscaping, trees, shrubs, sod, etc. infringe on the low flow portion of channels or swales.) 12/15 Page 3 Ill. Storm Pipes (aka storm drains) - FCSCM Vol.1, Ch.6, Sec. 4 A. Storm Drain Pipe Capacity: Yes The as -built capacity of all pipes installed on this project has been verified and meets or exceeds the capacity requirements shown in the approved drainage study for this project. 1. Yes All storm drain pipe sizes and materials have been verified and are in conformance with the approved construction plans. (Indicate on the plan and profile sheets that they have been verified.) Material and size substitutions must be approved prior to installation. If a pipe size or material was changed during construction, the certification engineer must attach the approval documents or supply them with this certification. Approval documents must include a calculation documenting the capacity equivalency (equal or greater) of the substituted size. 2. Yes The longitudinal slope of the pipe is as shown on the approved construction plans. The acceptable minimum slope is 0.4%. All slopes flatter than the designed slope on the construction plans must be justified with capacity calculations on an attached sheet. 3. Yes The as -built invert elevations have been verified and are shown on the plan and profile sheets of the approved construction plans. Please see Attachment 1, Storm Sewer As -Built Drawing B. Storm Drain Pipe Installation Requirements: Yes All pipes are installed in accordance with the approved construction plans. 1. Yes The minimum cover requirements for all pipes have been met as shown on the approved construction plans. These will be called out in critical locations. 2. Yes All encasements and clearances as specified on the approved construction plans have been met. 3. NSA Any specific joint types or construction methods specified on the approved construction plans have been met. (List on a separate sheet and attach to this certification.) IV. Concrete Pans - FCSCM Vol.1, Ch.7, Sec.4.1.3.4 A. Construction/Installation: NIA All concrete pans have been constructed in accordance with the approved construction plans. 1. NIA The concrete pans are the correct size/width as shown on the approved construction plans. 2. N/A The longitudinal slopes of the pans are as shown on the approved construction plans. The certification engineer mustjustify or mitigate longitudinal slopes less than the minimum of 0.4% unless a flatter slope was approved and is shown on the approved construction plans. Provide mitigation or justification by separate document. 3. NIA The cross-section of the pan is as shown on the construction plans. (Specifically, the pan cross- section is "V" shaped and meets the side slope shown on the detail.) 4. NIA The concrete pans are a minimum of 6 inches thick without reinforcement and a minimum of 4 inches thick with a minimum of 6X6-W14xW14 reinforcement per detail D20B and D20C. (Provide documentation of the reinforcement used if different than shown on the details or on the approved construction plans.) 5. NIA The spot elevations shown on the concrete pan(s) have been verified and are shown on the as - built drawings. 12/15 Page 4 V.Storm Drain Inlets - FCSCM Vol.1, Ch.6, Sec. 3 A. Construction/Installation: Yes All storm drain inlets have been constructed in accordance with the approved construction plans. 1. Yes The size and type of inlets are consistent with the inlets shown on the approved construction plan. Indicate by writing "Verified" on each inlet on the plan sheet or list on a separate document the inlet number(s), type and size (length). If the inlet installed is other than the one on the approved construction plan detail sheet, p n for eaual better capacity. Please see Attachment 1, Storm Sewer As -Built Drawing 2. Yes The size of the inlet opening is consistent with the approved detail. (Check height and width.) 3. N/A The elevation of the grate (if applicable) is at the elevation shown on the street profile or as indicated by a spot elevation on the construction plans. 4. Yes The as -built invert elevations of all pipes entering and leaving the inlet are shown on the plan and profile sheets within construction tolerance of 0.2 feet. If substantially different, provide justification and capacity calculations to show the capacity is not affected or propose mitigation. 5. Yes The as -built size of the inlet box is as shown on the construction plans or an explanation or justification is attached. 6. Yes All inlet covers are stenciled or stamped with the following designation: NO DUMPING — DRAINS TO POUDRE RIVER. VI. Culverts - FCSCM Vol.2, Ch.9 A. Construction/Installation: N/A All culverts have been constructed and/or installed in accordance with the approved construction plans. 1. N/A All culvert sizes have been verified as indicated on the as -built construction plans as correct. 2. N/A The culvert material type for all culverts installed is as on the approved construction plans and is indicated on the as -built plans. 3. N/A The as -built invert "in and out' elevations have been verified and are indicated on the as -built construction plans. 4. N/A The culvert headwalls or wing walls have been installed as shown on the approved construction plans. Headwalls or wing walls may be needed in the as -built conditions onsite if the slopes adjacent to the culvert are greater than 4:1. Please note areas needing stabilization in the certification narrative. An alternative to consider is a turf reinforcement mat (TRM). VII. Sub -Drains A. Construction/Installation: N/A All sub -drains shown on the construction plans have been installed in accordance with those plans. Sub -drains installed with the sanitary sewer are to be verified on the sanitary sewer plan and profile sheets of the construction plans. (NOTE: Indicate any sub -drains installed after the plans were approved on the as -built plans.) 1. N/A The size of the sub -drains are as approved on the construction plans and are indicated on the as - built plans. 2. N/A The type of sub -drain, in particular the perforated and non -perforated sections of the drain, are as indicated on the approved construction plans. 12/15 Page 5 3. NSA The cover requirements per the construction plans are provided. 4. NIA The cleanouts have been installed at the locations shown on the construction plans and are accessible for cleaning. (Cleanouts can be buried a maximum of 6 inches deep with their locations marked.) 5. NSA The backfill materials for sub -drains are as shown on the approved construction plans. (This includes the type, depth and width.) 6. NSA The geo-textile liner completely wraps the sub -drain and the permeable backfill material unless shown otherwise on the approved construction plans. (Sub -drain pipe wrapped in a sock filter material is accepted only if approved prior to installation.) Vlll. Curb Cuts A. Construction: Yes All curb cut openings are constructed in accordance with the approved construction plans. 1. Yes The size (width) of the curb cut opening is as shown on the approved construction plans. Z. Yes The curb cut openings tie into a downstream swale, pipe, or other appurtenances with a smooth transition and there no obstructions such as riprap or sod impeding the flow downstream of the curb cut. IX. Sidewalk Culverts & Chases A. Construction/Installation: Yes All sidewalk culverts have been installed at the locations shown on the approved construction plans. 1. Yes The size (width and length) of the culverts are as shown on the approved construction plans. z. Yes The cover plate is a minimum 5/8-inch galvanized plate bolted to a galvanized angle iron per the detail shown on the approved construction plans or per the City's detail. 3. The sidewalk culvert invert "in and out" elevations have been verified and are indicated on the as -built plans. 4. Yes The sidewalk culvert opening is as shown on the approved construction plans or per the City's detail. 5. Yes There is a smooth transition both on the inlet and outlet ends of the sidewalk culvert with no obstructions such as riprap or sod impeding the flow into or out of the sidewalk culvert. X. Site Grading A. Construction: Yes All common open spaces have been graded in accordance with the approved construction plans. 1. Yes The grading on all common open spaces bordering private lots has been verified as correct and the as -built rear lot corner elevations have been shown on the as -built plans. Please see Attachment 2, Grading As -Built Drawing 12/15 Page 6 2. Yes The as -built contours for "overlot grading" are shown on the as -built construction plans for all common open spaces, tracts, outlots, etc. If not in compliance, please attach a narrative describing the situation for noncompliance and when it may be corrected. An escrow for overlot grading may be required. (NOTE: Residential Lot Grading Certification is a separate process from this Overall Site Certification. It is understood that residential lots will be brought to final grade once the foundation is backfilled so they may be lower than the plan shows at this Overall Site Certification stage.) 3. N/A All turf reinforcement mats (TRMs) have been installed as shown on the approved construction plans and the slopes are stabilized. XI. Riprap - FCSCM Vol.l, Ch.7, Sec.4.4.4.3 A. Construction: Yes All riprap has been installed in the locations and sizes indicated on the approved construction plans. XII. Permanent Erosion Control Fabric - FCSCM Vol.l, Ch.7 A. Construction: NSA All fabric has been installed in the locations and sizes indicated on the approved construction plans. 1. NSA All fabric was installed per the details on the approved construction plans. XIII. Post -Construction Site Cleanup - FCSCM Vol.3, Ch.7 A. Construction: Yes All construction debris and obstructions of any kind have been removed from drainage paths. 1. Yes All construction debris has been removed except in staging area(s). 2. Yes All ruts have been smoothed out in all construction areas. 3, Yes All areas needing reseeding have been identified and future stabilization goals have been coordinated with the Erosion Control Inspector and in accordance with FCSCM Vol.2 Chapter 12. Note the area needing stabilization in the narrative. XIV. Certification of Other Permanent BMPs - FCSCM Vol.2, Ch.8, Sec.2 & FCSCM Vol.2, Ch.12 A. NIA The construction of channel drop structures is in accordance with the approved plan both in location, horizontal dimensions and cross-section. XV. Certification of LID and Water Quality Facilities - FCSCM Vol.3, Ch.4 A. Yes Attached are the During Construction Inspection Checklist for Low Impact Development (LID) and other items to be verified during construction, along with pictures and other required documentation. 12M5 Page 7 XVI. Certification and Erosion Control Measures A. All temporary erosion control measures shall be removed upon stabilization. If at the time of preparing this certification there are any erosion control measures still remaining on the site, please note them in the narrative and verify that they need to remain at this time. If in doubt as to the need for any control measure, please consult with the Erosion Control Inspector at 970-221-6700. XVII. Statement of Compliance A. This certification is signed and stamped. By signing this form, the engineer(s) attests that he/she has visited and observed the site, and to the best of his/her knowledge, the as -built conditions of the drainage facilities are as described in the above form and in the enclosed as -built plans. B. Failure to properly disclose all known information could result in the rejection of this certification and prevent the release of any and all Stormwater Utility permit holds on Building Permits and/or Certificates of Occupancy within this development. XVIII. Signature and Stamp by a Colorado -Registered Professional Engineer Engineer's contact information: Name: AAvze�f C4Av- Email: AAVZo l nio2r*+e¢�e,lt��lE2tz�dt,�- Phone: R-To— G69- S 01 Company: NORT»r=e#J EnIalNE'�-e," Address: 3 i r4 - 14eu9 ra-s ST. Sv rri= i c t-oT Go eoE;Z� . PE Stamp Sign and date City of Fort Collins UtlBUes 12/15 Page 8 • • • c 0 u m 0 V ar t Y L Y 3 a E 0 V O i 0 Q aJ w } Q C L L Y ° 3 0 � a u � mQ a E c O am U VI ar E ° E 0 O X m L C N L N � 0 L 0 N O L on u Ln L 0) 3 ° Y � Y m U C m C O_ fO E o N U Y •° U m c Y u m Q E O U C a1 al d al m L CL v c O1 v Q .Q v L N r Q ar V C C C O m fa O m m o N O0 u m O o C ui N 0 Y C m c m Q N aJ Q 0' �° C c C = 7 0 0 3 - Q C)u 01 ° Y L L ° L m N N Y N N C C E a! 0 U C 3 U aJ a) am+ lD zt: m O O O Q ° N m ° Q Q Q N 0 E 0 cu m m o O E c aL-r C C 4- O E O- O O - O O Y Q C — 0 c O N 0 is Ln ti v _0 m o aci c C U '0 N X m L Q U N C 'i -O C ry O C N N m Z O V aJ m E C m N C u ` > ^ V Q Y j L t C _N Q C u V) `O Q C O E O N ° p $ LL CL m m -O U V a) E o r_ 0 2 0 "r Y v 0 O Y b0 C m 7 C O C Q C O W N o 'm0 — U O Q " 3 Q�j �° U N U _° N u a) v m a, N > > o� L Y `;- u L U u c m w o° n o c n Q rN v 0 Y (U w O c °- Q a m a Q ° -0 .c U N N O o u 'O c tl0 C C 1° a a)y m > m al N OD ` L :� O U t 'O N O 0 O C C U N U Y -O m C C O w LL al m m w o 3 c y U 0 -° o m = c o 3 Q U a m Y E aCE ai 0 ,,, L u ai m d o (U IN c O rf`o N .O LL m > ` C n '^ v 00 C •w 0 'm' E faOl -C U -a 3 L U c w E L v a)•� 0 a 0 Y U° m 3 • Q L a- Q Q 0. c t w ° •O o° ag c n m 7 n .` a '� a '� Q 0 •.r oo N 0 v'C � U m ° 0 C in ar rz v v v w Lu " u '� ~ uU F- Q a) H H H c Q O Q O m -° �n ¢ .. i o y c ;� m U L m aa)i ¢ Cl. ai m E a u != Q L U '3 aa)i aNi z z° �, r z r r r t oC ¢ co t_i o w a ¢ Q d m a N N c m E Q ar m E c 0 m r c a E u O C O u_ u Z++ A c m oo O S a) ti m c N N W d 41 u 0) U c O O v u c 0 o to a o �o r -0 3 m ;; m $ m E I 3 c (U m OD r- �o ,., O fL m .0 U U C �n -O -O N m t+ C Y E m •L V m y C 9) > O L �^ L N `� N QJ N fYif w Y Q v c u m- 00 c a fO 3 n :L� E o o O __ L o V m •U Ul U Y X Y L u '++ m O m av+ o ru0 Y b0 U U m c m u n 3 o m� w o c L E CL V1 a C N Q •a '� L l.. N c Ybo O O" a) Vl Uto N C � 0 t N 0 7 X > `�° v -° ;° CL a c o a v -C °� Lam, � v o Q o m a a ° ,� L •'-^ rn o c +� m o v ;° U Y Y L U Y Q. Q) yl .- fO L L Y N O N m C L 0 Y '� O. C Y aO+ a :m N w U �'' N •� }' E N LA ,F +' '^ v O_ 7 O 3 Q T N m •u N E E C O m 3 c v� N O co O 0 u �' 7i o fn N u O n N c m c c_ c_ c o aEi L N "= m °) m ,v E E CL '0 0 0 f0 fn C u O bo Q Q) V - v> Z ay. N i m of �..� i O O' O N Y Y m Ql m N Y w C O_ N O .C_ O. 7 N E a0 O> A DO UO N +' m 0 m 4) m N m N m U Q. O � O Y Y m m m v) m U m U m bo u E a. U E E E o z LL B Y o 0 o a v` Y O Oc° w u \ aX QL V N Y N m c c m fL N m S! 7 m a ow nao. �� aa) am) m v� m v u c OL .. c E E E v ami��� U>» o E a o a Q m a 3 m m fn .� .� 0 a 0 N C E c d c co (U ac) CL a a) L L u V E $ E L \ N O '0 0 o v 0 3 ro L L L v c c a a a v E E o o do v O O O N o O L L L V C 0 C dO O Z N 61 m � u— C/ W } m =o v E 0 0. 0 Y 0 Y 0 0 v 0 E 0 w u u C N_ 0 u v v N L a) a) _Y w tv E »»» c 2 J i I I I N d N 3 bD O C L Q U i 0 0 O v u C v E E a n v C o co E c N 'ryo .c O '0 � t O u D) c v c u c 'U E v C N a) L Y V -0 a) m a C O m 0 y O H N p U U -O .n CD 0) OC_D N > D1 C a)" O N v C O N E 0 .n N u C O O m \ O p L > O i Vvf y VI v Y Y U1 > O Y 3 v o a)y E o u on `_ "O •Ln m y tiao yL u u cO v Lu O "L > C 0) -0 v '6 0 U > O Y M `� N _v > _� _N \ v 3 yr - 7 v rl 'C L v y v? v c N a O C u `� u 4- mCL _O u C v M U u Z) a o 0 o v m 3 a 3 E E L y Q >-m E E ryo p o �>, o c v m ro y E >m> o o w -0 -0 G u c v C c N a) v y + x w CO CO w u 0 a 0 u D LL LL 0 O .D — C 3 " a L L cu C U V C N 0tw EC _ v r m L o0 ro CL V N Y C L Y f0 N X O V a m 3 N N C -0 u a O M L 0 v a C v� L v O 'D v C N -Ctf v v 'O a C OD > fy0 v U N N v (UN 0 0' O O CL C N y N U 0 _0 Y C a f0 s Y N n) ._ ro y E ro .� o. 5a y v 3 n v D) v O C O C L r0 O c U l bD C C C v m (U. N ` Z� a)a L .m C v C 'a O O V C C C N m D) N m O y y r0 f0 rL0 N E E E o N o -0 -0 cu 0 Y v v v L v 'D m c o c v -0-0 v v w -0 a a a. N N E E E a � u Z)» 3 m m IL O Y v m •N O Y m m Y C c M C E o Y L C Y a) (Ltw m aJ C > Y C l C C_ > m c E L L Y N Q � Z v N v C al > > > > O. E c ++ al V G �L m u LL i J H � L O v � O cN O Y O > a0 L Y L _ N 00 m n v c U v-. a al N m a)a1 t— v -o � CL > a cl c r u v N N m -0 N O c UD > N 7 O o N L— m O N a -O -O d O 'D O > O N L a)v > C > E oa C Q. -o L O' E 'O p u c y c -O aJ _N v c U N I U O O c N v Y C C Y w E Z \ O L a/ N cmN m .N U m 'O a) N a) O 'O i c Y o E v _0 3 °' m o a) E m C L m N 3 'Q a y ,pmp 3 .c Q v Y m m m c N m H m— c C O 3� m e � 0 '0 ai 'O al 'O ai E 'o 0 a O Y m E Y E E E E M m Y" L o c v v ai v ai c _M m m CL E Y v Y Y Y O C C pva m Q. a)aJ fl O LL LL U- U LL lL > N > i- E O U � U N C m N E ¢ co N N m O c m y a U m Ln c c V U o N E Mio i a) N N N N N U Q > O co '- O r a O a -oo rn m <r LL 01 a) al — al > N 7 E a m C C m m H E o n N t � Z w a E v O Q in U ATTACHMENT 1 Storm Sewer As -Built Drawing NORTHERN ENGINEERING :6 NORTH 8Y, AND 0 W ED 2OFM o S (IN Far ) �'. I RUN - n IL �J C TII \ , ' I \\ \I LOT 3t MET 1i \ � I�AM AUS corrz PC I In �U ern � z Fe_ _ _ _' e m >Ba _ FIliOGOam ® hevsuv _.po t tor+a Ir -r LEGEND: b riiawm�i y I I " ___ODT is.rlr E.mxmlr `` `\ iMV �_ ___ ____ __ vBwx WAMRN I}I T _ r EAIBINcwARBMAN sµxwvsSER �— 16.1 __- _ t__ _ _ _ s 7-- _ _ �.� EXISTINGSANITARY PEAVEY SEWER ea >—n _ _ _ _ _ _ -- - —w _ - .«.r.. PROPOSED SEWER SERRicE PnmosED SPADEFUL sERvicE ,,,,,«„„D:?FH-m—raN—,,,;..—„ ;—.,, __— w....EEn,.,wNE.«« BE Zz m _ s+wT-7H'D aAr-TOTE �eo>oN E. Bxm.ttn ,,,sM+t.tp8cuxmrl________,I-- E.IsnxesroN w� S wmmm.0 4Fr, =PROPOSED EL Nvc— w y _________________emxlx.m-_______.mmlmea __---- ____________________________________________.emm+eR-_---..____ PRDPDseDa EG,RLE.r•..m.E FAR -- -- _ _ ELECTRIC ___________________ E,IBTNGRLEPEE .— z _ ---- -- ---_ E.n.Bn.GBExGwsmB �cv �E VPovEB1v 00uXMBY _ _ OZ } PRCPoSF➢BFTERRE w.ly w -- ZF Paosoam Lonm EASENENr LNE PRDPDBmLmITFDLE.I.. • i� PROPOSED MORM PONT ■ $ NOTES: E I THE SUE FALSE AND LOCATION OF ML KNOWN UNDUMUFFAUND UTILITIES REAFFIFEUXISAFTE MIEN SHOWN ON THESE DRAWINGS IT SHALL BE THE OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF ALL GROUND DTUTEsiN $f THE AREA OF THE WATER BEFORE CONMENCING NEW CONSTRUCTION E STORM DRAIN 1 CONTRACTOR SHALL BE RECTUNTARL F FOR 10I ALL UNDERGROUND UIIIIIEs AND SHALL BE xE0Wx0iBlE FOR all urvxrvOwry ux0[xcvoux0 UTILITIES. 2 MAINTAIN 10 HORIZONTAL AND HE VERTICAL MINJARUM iION BEMEEN ALL F SANITARY SEWER MANS, WATER MOWS, AND SERVIDIF IS N B 3 PIPE LENGTHS RE CALCULATED FEWER FILE CENTER OF MBNHOLES AND INLET BOA &E e =�__ ��n- '6� ASININE NUNN SENIOR��� AIR IN IN STRUCTURES SPECIFIED UNDTHOFwvE INCLUDES PRE LAYING LExcrx OF FIL D �: .1 H xS FRES IN pIGRN.FFWN` EATER, RPEMATERIING ANDINSLAILATILW WITHJN�TER PRIERICx AB MAIDshIt OR UP SAMITIFTECURSUDEE OF R.0 w. SHALr OSSE m { AP PROVED IN PERSUADE BY THE ENGII ER. AU IONTS SHALL PE VIATERrIGRi LW Aq p• q FTIO,t11Ti gµ-DGWAREST 0.IPERMGWPE R ii§ IVaQy1E e- MROII� ES LOCATED IN SIDEWALKS AND TANS shot HAVE PECEsrRNN 6 PARTICLE R ceRcns* SITS r ' SHALLCONTRACTOR �I aF INSTALLATION I* WI nNFlar. n STORM CONFIRM M:N mLaurvcFsTHEIR ° erca 1 Dl 1 II IK% ADIewouturatlon � W Y — wLli ZLL U OfLL�y GLLMRYNORIGICX�MERCf cf) Q !r wLCB,mO O LL z � w � Know what beo '°"'°'^A'4u0 Alc Q �� Call e 1 nO RECORD INFO ONLY (SEE NQTE PELOW) City of Fort Collins. COT UTILITY PL4N 4P APPROVED CHECKED BY'. CHECKtt ,y �1-ryr/p W � 0 OR , AJA ties SM1eet --At n_ ST1 �` Df28$ EfIS ATTACHMENT 2 Grading As -Built Drawings NORTHERN ENGINEERING p� 6 WRONG FREMA IFaumEHPNPI ; i I D,PD,a � pvMple leirp .q L � •, 4 I I � I � I I I OWNER KARMA. LIVINCSTON 830 N SHIELDS ST FOITTOOLLINS, COIR CO BOSif III IT iF OWNER II Cm OFFORTCOLI I I T11 I OOULAFORTEAVE 11111 FORTCOWNS 113 COeos]1 II I II I IIIEI El j j E �IXGTNG 100TYR CITY REGULATED BOupnvv_j AUDIT V NFOUSTATHEE) �F li ;j vI nlFtc sMEEr� r:� EXTATING ECINCEPTEE SIDEWALK� [ RlsnxG 5idM1 �(( P=jF ` - OWNER- L� ■ -- CITYOFFORTCOWNS _ '� �Oo MNtOF Pow« FORTCOWNS, �r r�•� �yti��rr ri Y — \ cn eosli LIMIT Bill MIX rr 8 ,®D.�/ \ DWPERNNp I vWMO� I ��'�.,%-\`_m Y DN®rMW s,a +a a ']IaowAW e°uluMr—_ LOTO LOTS LOT V' .rt SLAB•83 SLAB-03.26 SW=81.18 /LOT1 — I LOT41"' \ ° \ sO j \ \ Pn B x l�Jl C14 .n LOT Ie id b�Bl3.N &IltlfElO I I TT BY W�� OWNER NAUTACNARLESRCONNIEL I ' 804 WOOD ST FORTCOWNS, CO MS11 � I FOR 6UB=8255 � � 8IAM81.15 SLAB�0.0♦ JI YYkp W W 2 W W N LLI z J_ U � I IFULIFFNERNMORLAWITE TREE PROTECTION NOTES: EKlsno,I�W,.®E«PROrECDUInn ISEaE,N.mH.wtprONE_ _ ' SEIIBIwED MCu ORFILLAFAaxRIW n[rPErH°UNIESSAG�NI�EDM n CRFERESTERwsEvuwTEDMOuwov[OMEwsnRRacE ] vYEgWExIanKOpi¢u.WFOM¢HCAGf V.91TEImo1 EOE CF FYBIMOTRHS 4 WRING THE CONsmucrxN STAGE OF DEVELOPMENT ME ANNUITANT SHALL PREVENT ME CLEANING OF EQUIPMENT OR NAT RAL ON THE STORAGE OR UNI OF WROTE MATERSAL SUCH AS FUND ORTS MNf IE4H8811pADRf.OxTq�REOSLnCIBIrLYmwLWWYMNDE.SOLVENTS ASPHALT CONCRETE MOTOR Olt ON ANY OTHER MARCH NFL HARRATULTOTHELPECTATIEL3 EPmNW ME GRIP LINE OEAx. PROTE]EG ♦�SUED LI«FE�uwKEm FREE OR GROUP OF TREES SIEMENS) BE a�czERauri�Ex°GR MERGERS u ELY IS MODAMAGEGATTACMIENT, PORES, SIGNEORRRxHSWVBETASTEED rOMYgMTECTEOMEE. iRFE5EMAIL WMACRNIGE 3PREIECIW MPoZRFEXfY1GFlEC1ED WCxMwENK1MNE HE MLASCMuxIpwOTECTEDMEES AxOSEPARNpx 9Rp1ROBV1'Kt'pIWYR8rIPLYSIp.K Fp1y1ELLNptf �iKK1EMV f 1pOcrpHIX1 UHOCLEMW4MFaS ROb 0.1CM59FWtb 1xAx6¢HI iEE1fI1CYlIEIWIRMW NO URm'FAEM rNM ERECMG IWi({I(irIE MiLNEYM;II EEEA WfBAIFILLMIMl1R M MOM "CHO EFOCEE'RAMER EMETRETDSTSIxx ARorE NOIECId NMEIIE#&WLMpypHBrr OFEgM91Of WYMEEaTCnIGIwON,OEwcxi SSI ilE{WYff.Ni:dELLME➢xv MClxcuETAL T-PoSTE TANESA 1SWAVS,L9W.NCRM WIC YMYW C£RivIW1EEFTAPMTAp rYIEERSGOF ryEQ.aYETrtFQ 6TW �mpMEMOGTIE OUTSIDE PEDOMETERS of WON Al BNM3 ONMA HERS swu a rRv®m TIE cm sauarexM ]EnAt SSDAIWOS.' EEnpwlM mEcm EOREsv FRESH TO CUUMBIG ADD BRUNEI NORTH w D w M 12OF1N1 ( IN FEET) Ina- SUN, LEGEND: PROPOSED STORM INLET MKONEXPEDOONECUR EXISTING CONTOUR RROPOSEDONALE "AFTERESED CURB AND ATTEND PREPAUSED LEFT LI HE EXISTING RIGHT OF WAY PREPARED RIGHT OF VARY "PSTING POEM FLOODIPLAIN BOUNDARY EXISTING PLODDINGLY EXISTING TREEspG 't PROPOSED FIRE HmRMT A MEANDERED ELECTRIC nuNSFORMR D PROPOS S SPOT F EXISTING SPOT x SPOT ELEVATION \ PROPosEDSLOPES =w PEDESTRARACCESSRWPS - yl CARL PROPOSED CONCDEEP) E DEEP) PROOFREADER NOTES TAPoROXIMATEINHEN:OCREARIE°FALL T�s jo��TM":� IETHEIES ARE RESPONSIBILITY OF THE CMTRwc ExiSTAMAX OF THE AGENT �ENTEKENLL OM CONSC1TRuc*ON*THE COME SHARE LOCATING ALL UNDERGROUND UN LITTER AND BULL PE RESPONSIBLE FOR FOR ALL EMBLEM UNDERGROUND UTILITIES ' UTILIATYTrnTHEM EN.s OTHER EAAEMIGHswAAD OTHR SURVEY WORWTON. S MR MINE GAVE #12-Ml DATED MARSH HMAE MEN MNS PLAN ECT MOOED FROM THE SPECIAL FLO'oo�DAREAEAs q�ON ALL RAMS LOCATED CHILD THE FUTURE FLOOwR.v SEMLLR CONSTRUCTED IN A NUMBER THE ENSURES THE FINAL FINISHED SAUDI BAT OR SEEM EXISTING MENATIO E LOGS I ME 2 ME LOCATED IN THE MET MMEN THE FLOWMAY IS Eo OOIXYAV CASH H ONLY BE S REDEEM OSDEVELOPEO PROPOSED V.ETLWD FRRER.Y TO UNGULATE FIRM. MCROGRADxG TO SE COMPLETED IN THE FIELD.1 INPUT FROM CEDAR CREEK. SEE EMPIRE TISECTION I. 1 OF THE Ep RB USE CODE FOR ALLOWLE A4YGT : HIN THE IVER WEE RTO FLOSERTUABN EWNTSRDFFEBTFOR AGENT CRAL INFORMATION AND REQU S THE TOP OF TEXAS dATMM•NMME THE WWY EIEVwTXM6 RESIPED TOR MI iIIEIWN 10 TIRE Ell IN MEET as E MAINTAINED AND OF SO AS TO ENs PREPARED FUNCTION IN iarEmmaesWcn°xs 7lAPrRCV Fort COl linty. PLAN AF 1 ZU A =w i W Z N O Z w �E k! TAX s BIG€ m m� 8 8• 8: Z J a 0 Z Ile Sheet G1 Of 28 Sheets TOP fl"CUME RVEEENE \ ■ IPER CEOMLfEExI \ \ ■ ON FR' I LITY OFFO )(580 NS \ ERE, YEARPoBO FORT A J CO 0022 . 80.511 ■ r RE EEEaw- RE qsqs 2� ■, /' �- ■ ■ W OLE--- W 2 t®� L� W sun.m.ea W _ to Z U Gy ■ OWNER: --1 ■ IHI?ACINRIFSRiLONNIEL r MST _T F CO NS DO MIZE ■ ■ I w =HWOFNNI — Qse m \ Owrc ARE. �ryEN�LnaEnO \ ARE, ANNE, INNER AN MPMntI�'1 MaIN�pMVY'N ®IULgr w pgIEC,EDEXIETNCm ETF[u vyL DE Y mIIPRL �Ce NO CUT OR HILLFOUEENCHDPTH IFR�TEEMIST UNLESS As,u BIG CUT EBEAR OSEA ED r Y IllfMID IpCPMGF 0.E11 M I W! SIEOFFN61MGl1EF8I. WRING ME T M SHAULL PREVENT ME [ DI LxT PRTHE ♦VOaTMO}NCNFMOrs WTIENEVFAIgNFF,EWEUwIE roSTORAGE OR CIT AMSOR LL OF WA AE ALL OG5 MVM'LExHdbCUOBECWFDWED SIFT%VIILvDID 1\OOYVWE. SOLVENTS ASPHLOT CONCRETE MOTOR OIL OR My OTHER WTER14 FARAMULTOTTEMEORGRouELA'EOFE WITHINTHEDwPUNEOFNNPROSTEO - EXCAVATION EXAME Or s. CUBS w�MUBNEE BACKHU BEFORE ErHERROGEER NAME Aolxn TO DIN ODTADD WATER ME TREE IMMEDIATELY a NO DAMATIN G ATTACHMENT WIRES. SIGNS OR PER WTS MAY OF +ETIT ED TO My mmEDTED TREE. ^� ..wN TREESO PEORToaYIATORSI.`IEI:RESTURDYSToc: FORSHELDNTOOF CONSTRUCTION ORLANDONI�INGAR`EAS I"HTHT�FHOT PROTECTEDNO CLOSER THAN SIX TO FEET FROM ME TFUNKORON I vIPLNEis HSE�ROWw MIN INTHIS MTMeii(UNGAROOUUNCERCH TREE wOvEOUUIIREDWINUFI5 WIF`: TION LeER EQUUNLESS ET sror:cE EOUMPMEONE EUT, wTIMALS DF+n9 FILL w GOT wM OFFI�ISE) FEETwPRT AND TYLNG A RGROx ox ROLE FRED ST NrNOLEnm FOns,En CLJWED .E.aDTHE OUTSIDE PENII.EreR X. of SUGH.RE.WIN NEEzs,xo MuauuElaNmm Mang s,ER„m.F mErnmNoumx� ,. caNIRFc,aNSHnu� NE. 61TE NEEHND,..TH nIEcm FOHEmI. ® NORTH NO 0 NO W imrM (IN FEET) I Inch - W Il LEGEND:EXTEFFI' BUYERS! FEWER PROPOSED STOW YWE c t PROPOSED OFFER "let PROPOSED SNALE PROPOSED CORR ADD ER — — Z C7PROPOSED LOT LINE R PROPERTY BOUNDARY Z PASTING RIGHT OF WAY PRO BEDx ONTOEwnvEXISTING TGAYR W FLOODxwIN EDuewwv 1EEEEEZ EXISTING FIOODWAY O ZE EXISTING z W PRCENG EDFIREHYDRANT PROPOSED ELECTRIC MwsrwRER PROPOSED) SPOT ELEVATION EXISTIN EXOEoGOT SPOT LE NTaN BOOKS f8 kd MEN P. DESMI.NN;cEssRN.Es PROPOSED FE)} PR CONCRETE a§ FORMER AREA o NOTES: APPROXIMATEATENSTOYMNONTHEREORAWINGRE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE EXISTENCE OF R F < UNDERGROUND UPLITEX IN THE ALL LINEN ALLUNDNUROUNDUTINE'ESOHIOS"wLa a Po�IBLEFEETFOFRNL UNK2 REFER TO ME FLAT FOR LOT HEAD TRACT SEES, UTILITIES T9. LOT OFIGmINN, IS uEIR fELu BLAE EEMONDSN OirtEVED WTp M ID,21q¢ SURVEY OrM8 INFORMATION HHAVE XSPEE REMOVED FROM ME SPECIAL.EL0.b IW/ImMEP DEPICIdON 4 ALL PATHS LOCATED WITHIN THE MAY SET BE T ELEVATIONG. WR A MARBLE THE THE FINAL iXl6 SHE GRn[E �NID TXFE OIM EN BOXES NLY LEVY LISTED L N THE ELECTORAL IS REMI ED TONE oNPROPOSED WE OINMEE AND FORUTFTLa0 UEota "�°'°" G y Z MEBECRIVER 00°En ME D ME COME FOR ALLOWABLE MISS WERNNM W Q PREUDDRE W J ODDPYANF.H FOR MO ONALINFORMATIONARM) a REQUIREMENTS, U E THE FOR PROTECTION ELEVATIONS 10TYP STOR�ixTHE MINIMUM EuvNTwrus laallnEn Z sows o ENSURREE Iis PURPOSESANDIFUP:cnONuiNDERPE`TUNTY ELL Q LLJ Q Q V City Of Fort . PLAN .a I' APPROVED, E� CHECKED Ee 4�yN, .4 S OF CHECrcE a N E.W " Sheet /a 4Go . III IWI A) d G2 Of 2tf Sheets j ATTACHMENT 3 Water Quality Forebay Spillway As -Built Drawing NORTHERN ENGINEERING Water Quality Pond (Forebay) Volume Calculations Project: 687-001 By: ATC Original Date: 8.1.13 As -Built Calculation Date: 5.24.16 Note: Volume calculations utilize Conic Method Design Volume = 0.11 Ac-Ft at WSEL 4970.54 Pond Stage Depth F Surface Area of Contour SF Incremental Volume CF Total Volume CF Total Volume AF 4969 0 2990 4970 1.00 4259 3602 3602 0.083 4970.77 0.77 5302 4083 8342 0.191 4971 1.00 5614 4916 18518 10.196 *Water present, utilized design contour at elev. 4969 **Interpolated Water Quality WSEL - As -Built Condition Provides Excess of 0.08 Ac-Ft. C wn.se wns) wn.T ` ` 4MW ` �Oa T T �� L \ Zw71w wn.x ___ ���D!l1111TTT��R1 CO-T \ wn13 >� �� 111AD9911T / ) I Cw)am T za X=Ta] r` wran wxiT wrae� GI •- 10 0 10 20 30 Feet ( IN U.S. SURVEY FEET ) 1 inch = 10 ft. 0 w]a5R T w n."T msla.W r / '°/ / UM37 ry � 1 \ I ' wn.T47 \ � T \ i 4 w \ AW4T44 \\a w)LE1 i D:\Projects\687-001\Archsurv\Received\NE Survey\2016-06-06_Updated pond topo\687-005 AB Pond Weir 6-6-16.dwg, 6/6/2016 2:14:44 PM, DWG To PDf.pc3