Loading...
HomeMy WebLinkAboutSite Certifications - 10/07/1998$TEWAR,r&kssocWE$ Consulting Engineers and Surveyors September 28, 1998 Mr. Jay Barber Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Jay, RE: OakRidge Business Park 26th Filing P.U.D. On the 20th day of July, 1998 we shot elevations on the existing storm drainage facilities on site. The elevations are shown on the "As Built" drawing included herewith. I noticed that the "As built" elevations are more or less 0.25 feet lower than the design grades RE design FF = 78.5 vs "As Built" FF = 78.23. This is general true throughout all elevations. This does not cause a problem because the shots are relative to each other. After this adjustment I find that the "As Built" Elevations and grading on this site is in substantial compliance with the approved design Grading Plan prepared by our firm and dated September 10, 1997. If you have any questions regarding this certificate please let me know. Sincerely, FRANKLIN D. BLAKE, P.E. & bac James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 970/482-9331 Fax 970/482-9382