Loading...
HomeMy WebLinkAboutLot Certifications - 05/27/1997 (6)TS7� Mr. Basil Hamdan City of Fort Collins Stormwater Utility Department P.O. Box 580 235 Mathews Street Fort Collins, CO 80522-0580 Re: Drainage Certification Lot47; Dakota-Ridge=Phase 3 7 Project No. 10-746-050 Dear Basil: May 22, 1997 On May 20, 1997 our office conducted a Field Survey of the Storm Drainage Facilities on Lot 47. The two Storm Drainage Facilities that impacts said Lot is a drainage swale that traverses the back lot line and the 15" storm drain and area inlet that runs east to west with the inlet close to the westerly property line. I have included a copy of our field notes and a portion of the Grading and Drainage Plan, Sheet 7 of 18, on which also I have drawn the existing drainage swale, which shows that the swale does conform to our approved design. If you should have any questions or concerns, please feel free to contact us at any time. Respectfully, TST, INC. CONSULTING ENGINEERS S/te ve F. Humann, P.E. RAD/Ir Enclosures 14 .� va-t 'y 2 e nrn�� U TST INC. ! Consulting Engineers 748 Whalers Way— Building D 1 Fort Collins, CO 80525 (970) 226-0557 102 Inverness Terrace East Suite 105 Englewood, CO 80112 Metro Denver (303) 595-9103 (303) 792-0557 Fax(970) 226-0204 Fax (303) 792-9489 O Zj I Oct Qk cr aft Z IbI sa- t of A Ll tit Ns" zk 14: vi N t4: 21e� NP Z —,j7xW 1259 'VOCJ�f� RCP IMP r