Loading...
HomeMy WebLinkAboutLot Certifications - 11/01/2005 (5)North -Star �`. design, inc. October 16, 2005 Jay Barber City of Fort Collins 700 Wood Street Fort Collins, CO 80524 Fax:221-6619 Mr. Barber, This letter and attached information is provided to certify that the Phase 1 drainage improvements at Park South Commercial Plaza Subdivision, Fourth Filing described below have been constructed in substantial conformance with the approved plans dated April 5, 2005. All elevation information is based on surveys completed by King Surveying (10/12/05). A site visit was also completed on 9/30/05. This certification includes the following improvements: • The ponds have sufficient volume (see attached stage -storage table) but will need to be certified again after construction of the Phase 2 improvements. • The elevations on the outlet structure conform to the approved design. • The building finished floor is 0.05' below the design elevation • The cross slope on the main east -west drive is steeper than design elevations and exceeds 6% cross slope. The owner is aware of this construction change and has accepted the slope as constructed. • The pans and curbs on site appear to conform to the grading plan and convey runoff to the on site pond • The landscape areas are under construction and not all areas were complete at the time of the site visit. In general, based on the site visit and the information provided by King Surveying, the site has been constructed in substantial conformance to the approved plans for the site. Please call me if you l gy,,9,kpy questions or if you need any additional information.. "PLO R E li/ q'�i��i ,S �p KqoCr . C> 6!\l P1. 700 Automation Drive, Unit I Windsor, Colorado 8055D 970-686-6939 Phone • 970-686-1 1 88 Fax d ]. LOCATION: PROJECT NO: COMPUTATIONS BY: SUBMITTED BY: DATE: east pond PROPOSED DETENTION POND STAGE - STORAGE TABLE (100-YEAR) Horsetooth Car Wash 170-04 PPK North Star Design Inc. 10/16/2005 100 yr Detention Volume Required = 0.025 Water Quality Capture Volume Required = 0.035 Total 100 yr Volume Required = 0.060 WQCV 100 year HWEL west pond WQCV 100 year HWEL Stage (ft) Surface Area (ft) Incremental Storage (ac-ft) Total Storage (ac-ft) 5041.59 0 5042 320 0.001 0.00 5043 1059 0.015 0.02 5043.55 2353 0.021 0.037 5043.85 3059 0.038 0.055 5044 3412 0.049 0.06 Stage (ft) Surface Area (ft2) Incremental Storage (ac-ft) Total Storage (ac-ft) 5042 0 5043 1607 0.012 0.01 5043.55 2029 0.023 0.035 5043.85 2260 0.038 0.050 5044 2375 0.045 0.06 0.072 0.104 HORSETOOTH ROAN eXlsnxc vaN rN NOW ��. R25' s.5' 2' 15 0 20 SCALE: 1' - 20' LEGEND FLoNXLrNE -P HIGH POINT - FINISHED F-OOR 'CC TOP OF CONCRETE EF6T'.NG CWOJRS 1, — EXISTING INDEX CONTOURS PROPOSED CG^.TOURS 4905� PROeOSE] T-FT CUT "O.,Re PPOPoscD • ...::owe, _-- = L Gs a _DT::. F. Cs_O 2 r - 5 IFIFEI EAO-V,N* L� oo�m ` ssww — m ow C oUmo n 1 I r i J Q UZ cc 0Fn UJ >? '. O0Ez S = ~ Or N F cc ONO co < LL _ � a a Q s