March 12, 1999
Mr. Basil Hamdan
City of Fort Collins Stormwater Utility
Development Review Division
235 Mathews
Fort Collins, Colorado 80522-0580
RE: Harmony Safeway Marketplace.
Final-Drainage,Certification
Dear Basil,
This letter is intended to provide further certification of drainage facilities located at the
Harmony Safeway Marketplace. In my initial certification letter of December 9, 1997, I listed
the following items that needed to be completed:
Per the approved plans, these items still need to be completed
-- Trickle pans in the open channels along Harmony Road
Storm sewer pipe under McMurray
Orifice plate at the outlet structure - Pond N.
These items have now all been completed
I have attached a copy of the McMurray Storm sewer, with the design and As -Built elevations
shown. The As -Built elevations have been provided to our office by Landstar Surveying.
Please let me know if you have additional questions regarding this project.
Sincerely,
PPxA
OL
Roger Curtiss P.E. - Northern Engineering Services
cc: Michael Davison - Wyatt & Associates
Chuck Ecker -Resource Construction
420 SOUTH HOWES, SUITE 202, FORT COLLINS, COLORADO 80521, (970) 221-4158, FAX (970) 22 1-4 159
l c ,
�;n Res
Aug-04-99 09:46A'Northern Engineering 970 221 4159 P.01
J
December 9, 1997
Mr. Basil Hamdan
City of Fort Collins
Utility Services Stormwater
235 Mathews
Fort Collins, Colorado 80522
RE: Harmony Safeway Marketplace
Drainage Certification
Dear Basil,
The following letter is in regard to the Harmony Safeway Marketplace project, located at the
northwest corner of Harmony Road and McMurray Avenue. This is a partial certification of the
drainage facilities installed to date per the approved drainage and erosion control plan for the
project. It is our intent to finalize this certification once the remaining items have been completed..
Per the approved plans these items have been completed:
All of the onsite storm sewer pipe
Detention Pond N, including the Overflow weir
Open channels along Harmony Road
Storm sewer pipe under Innovation Drive
Storm Sewer pipe under the main site entry off of Harmony Road
Curb Inlets along Monte Carlo
Trickle pans in Detention Pond N (These pans were installed in lieu of Riprap pads at the
pipe outlets, per verbal approval by Basil)
Per the approved plans, these items still need to be completed
Trickle pans in the open channels along Harmony Road
Storm sewer pipe under McMurray
Orifice plate at the outlet structure - Pond N.
In an effort to obtain a TCO for the Safeway Store, the owners are escrowing to the City of Fort
Collins for all of the improvements that remain to be completed. Their list includes the storm
drainage system improvement items listed above, as well as several other items unrelated to the
storm improvements.
Aug-04-99 09:47A Northern Engineering 970 221 4159 P.02
Attached is a copy of the As -Built elevations and contours for Pond N. It was found that the
invert out of Pond N is at approximate elevation 69.1. The overflow weir will overtop at an
elevation of approximately 73.83. The required volume for Pond N was calculated to be
approximately 104, 200 cubic feet. This would be provided at an elevation of approximately
73.77, below the spill elevation of 73.83.
There were several downstream improvements that will be accomplished by others, or by the
developers of the pad sites along Harmony Road. We designed this project such that all runoff
from developed areas is routed through he northeasterly pond (pond N). There is a note on Sheet
C2 of the approved Utility plans which states that as Subbasins S-3 and S-5 develop, outfall
capacity must be verified. Here is a status report on what has been done:
The storm sewer pipe has been installed under Innovation Drive
The channel around the Light and Power substation has been reshaped along the easterly
fence line.
Pipes have been cleaned at the crossing of the Irrigation Ditch
Channel has been regraded North of the Ditch.
No capacity checks or elevations have been included as a part of this certification.
As you know, this site has several future building pads that were not developed with Safeway.
Attached also is a "Long Term" Erosion Control plan to be implemented by the owner. These
interim measures are intended to control site erosion until a permanent vegetative cover can be
installed as weather allows. I have also attached a copy of the long term erosion control plan for
disturbed areas. Implementation of this long term erosion control plan will begin as soon as
weather permits.
As mentioned above, it is our intent to provide the City with a certification of the items remaining
to be completed.
A request was made by the Stormwater Utility for the developer of this project to verify the
elevation that the Regional Pond for Golden Meadows will overtop its banks, and to verify the
Minimum opening elevations for adjacent residences. Safeway has agreed to do this work in an
effort to cooperate, and will provide the City with these elevations as soon as Landstar has taken
them, probably within the next two weeks.
Thank you for your time and consideration. Please feel free to call if you have any questions
regarding this letter.
Sincerely
Roy
ss P. . - o ern n ineenng ervices, Inc.
cc: Dennis Wyatt - Wyatt and Associates
Katie Press - Safeway
STORMWATER
FlCy I%fr
DEC 19 1997
„•n:cF'J01JASCOTIA
.nCr.ry, 7, 0 ra;ifOrili3 Street, Suite 2100, San Francisco, C-A 94-101
cx 3; 1c, San Francisco, CA 94119
ce-:. ,"r: a;c lal ; 397-Oi91Telex: 00340602
December 15, 1997
City of Fort Collins
281 N. College
Fort Collins, CO 80521
Attn: Mr. Ward Stanford
Re: Irrevocable Standby Letter of Credit Number S010/81695/98 for USD167,085.50
issued by The Bank of Nova Scotia, San Francisco Agency
Gentlemen:
At the request and for the account ot06gt@W@3Mhc., 4th & Jackson Streets, Oakland, California,
94660, we hereby open our Irrevocable Standby Letter of Credit Number S010/81695/98 in your favor for
drawings up to the aggregate amount of USD167,085.50 (One Hundred Sixty Seven Thousand Eighty Five
and 50/100 United States Dollars) effective immediately at our office at 580 California Street, Suite 2100,
San Francisco, California, 94104.
We hereby undertake to honor your sight draft(s) drawn on us bearing upon its face the clause
"Drawn under The Bank of Nova Scotia Letter of Credit Number S010/81695/98 dated December 15, 1997"
accompanied by the following documents:
1) This Credit
2) A signed statement on the City of Fort Collins, Colorado letterhead signed by an authorized
official stating that Safeway Inc. has failed to complete the various improvements as set
forth in connection with Safeway Inc. proposed New Store Project number 1552 situated
at 1426 E. Harmony Road, Fort Collins, Colorado.
We hereby agree with you that drafts drawn under and in compliance with the terms of this Credit
will be duly honored by us if presented at this office or by registered mail on or before the expiration date of
December 15, 1998.
Draft presentation before no later than 9:00 a.m. Pacific Standard Time on any business day shall
be honored before 5:00 p.m. Pacific Standard Time on the same business day by wire transfer in immediately .
available funds to any account designated by you (or any other reasonable means specified by you). Draft
presentation after 9:00 a.m. Pacific Standard Time and before 5:00 p.m�Pacific Standard Time, on any business
day shall be honored on the following business day in immediately available funds to any account designated by
you (or any other reasonable means specified by you). As used in this Credit, the term "business day" means
a day other than Saturday, Sunday or any other day in which Banking Institutions in the State of California are
authorized or required by law to close.
This Forms part of the Bank of Nova Scotia, San Francisco Agency Standby Letter of Credit
number S010/81695/98 for USD167,085.50
Page — 2
Except as otherwise expressly stated herein, this Credit is subject to the Uniform Customs and
Practice for Documentary Credits (1993 Revision), the International Chamber of Commerce Publication No. 500.
Very Truly Yours,
TI qi
I (:� W eq�
Vincent R. Inocencio "ssistantAg
Sr. Operations Officer
.THE BANK OF:NOVASCOTIA
81695 San Francisco Agency :`"December 17.,--1997.-,i
BRANCH _ .: ...DATE OF. ISSUE .. . _.._... _
IssulNy BANKS No.
ADVISING BANKS No
AMENDMENT TO LETTER OF CREDIT
-_
S010/81695/98
ADVISING BANK ..
APPLICANT - "-
:Safeway Inc
- Fourth & Jackson Streets
Oakland, CA 94660
BENEFICIARY
AMOUNT .. .. .. .. _
DATE OF ISSUE
City of Fort Collins
-.
281 N. College
DSD167,085.50
December 15, 1997 .
Fort Collins, Colorado 80521
'..
Attn: Mr. Ward Stanford
THIS AMENDMENT. IS TO BE CONSIDERED AS PART OF THE
Engineering Department
ABOVE LETTER OF CREDIT AND MUST BE ATTACHED THERETO
DEAR SIR(S)
THE ABOVE MENTIONED CREDIT IS AMENDED AS FOLLOWS:-:
Amount increased by DSD84,000.00 from`DSD167,085.50 t0"DSD251,085.50
(Two Hundred Fifty One Thousand Eighty Five°- 50/100 United States Dollars)
.n
-Moth iug_fo ows—.�_;-
Al
. '_ : ;Except so fai as otherwise e>�ressty st�ted.lhis decurF ',:r/
,
; xredt is -subject --to the Unttbrm Customs end Practice for
` Docidnent ' Cred2s (?a 3 Revisicn) Intern atonal Charotzt
of Commerce Pualxatrm No. `.
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED -
THE ADVISING BANK IS REOUESTED TO NOTIFY THE
ADVISING BANK'S NOTIFICATION -
BENEFICIARY OF THIS AMENDMENT
1 /9/ YOURS FAITHFULLY
REMARKS, PLACE, DATE, NAME AND SIGNATURE OF THE ADVISING BANK
AUTHORIZED SIGNATURE AUTHO IZED bIGN�rUFM
`i! t !�) I
ST®RhiMWATER
Harmony Safeway Marketplace P.U.D. DEC 19 1997
Incomplete Public Improvements, Security Estimate Review
Revision # 1; 9:30 am; _ 12-17-97
Wheaton and Harmony Intersection
30" Vert. C & G
City
HC Ramp Area
City
4" Sidewalk
City
Remove/Replace Asphalt
City
66 LF
$12.50
$825.00
40 LF
$8.00
$320.00
105 SF
$3.25
$341.25
185 SF
$5.50
$1,017.60
513 SF
.$2.40
$1,231.20
Included in -Wheaton & Harmony Sidewalk Ca/c's
58 SY
$25.00
$1,450.00
54 Tons
$70.00
$3, 780.00
$3,847.45
$5j117.50
Harmony Rd. & McMurray Intersection
30" Vert. C & G
City
HC Ramp Area
City
4" Sidewalk
City
Remove/Replace Asphalt
City
71 LF
$12.50
$887.50
60 LF
$8.00
$480.00
105 SF
$3.25
$341.25
630 SF
$5.50
$3,465.00
685 SF
$2.40
$1,644.00
Included in McMurray & Harmony Sidewalk Calc's
35 SY
$25.00
$875.00
83 Tons
$70.00
$5, 810.00
$3,747.75
$9,755.00
Harmony Rd. Turn Lane - McMurray to Wheaton
4" Sidewalk 9,096 SF $2.40 $21,830.40
City 9,560 SF $2.20 $21, 032.00
$21,830.40 $21,032.00
McMurray Ave
4" Sidewalk 1,015 SF $2.40 $2,436.00
City 1,280 SF $2.20 $2,816.00
$29436.00 ' $20816.00
Page 1
♦ T
Wheaton Dr.
4" Sidewalk
City
36" Storm Sewer Crossinq - McMurra
36" RCP
City
Remove/Replace Asphalt
City
Flared End Sections
60" Manholes
490 SF $2.40 $1,176.00
660 SF $2.20 $17452.00
$19176.00 $1,452.00
238 LF
, $13.12 $3,122.56
236 LF
$73:00
$17,228.00
65 SY
$25.00 $1,625.00
121 Tons
$70.00
$8, 470.00
2 EA
$800.00
$11600.00
2 EA
$2, 300.00
$4, 600.00
$49747.56
$310898.00
36" Storm Sewer Crossing - Innovation . Current construction did not pass inspection
and must be redone. Verified by Kehn Const.
36" RCP 0 $0.00
City
Remove/Replace Asphalt
City
Flared End Sections
30" Vert. C & G
4" Sidewalk
Harmony Rd.
Trickle Channel
city
Swales
city
Mill and Repave
Redo Entrance Area
Grind / Mill
88
LF'
$73.00
$6,424.00 "
0
$0.00
36
Tons
$70.00
$2, 520.00
2
EA
$800.00
$11600.00
40
LF
$8.00
$320.00
160
SF
$2.20
$352.00
$0.00 $11,216.00
728 LF
$4.50
$3,276.00
1, 512 SF
$3.50
$5, 292.00
LS
$5,136.00
LS
$5,136.00
257 SY
$25.00
$6, 425.00
62 Tons
$70.00
$4, 340.00
557 SY
$2.70
$1,503.90
$14,837.00
$169271.90
Page 2
Traffic Circle and Lemav/Ticonderoga
Median
Krager and Assoc.
$41,047.00
City
$410047.00
Sub -Total
$93,669.16
$140,605.40
Traffic Control
1 LS 15%
$14,050.37
$21,090.81
Temp. Asphalt Curbing
1,200 LF $4.50
$5,400.00
$51400.00
(Bldg. Insp. Dept.)
Sub -Total
$113,119.53.
$167,096.21
50% Contingency
1 LS 50%
$56,559.77
$83,548.11
Total Security
-
$1690679.30
$250,644.32
Present L.O.C.
$167,085.50
Additional Security Required
$83,558.82
Page 3
1Jnrn••7 safe" Pao
Lo 3
MONTE CARLO
r LoAGs �zNjO e Flnnneac l2eao
zo.az•flECUlflm SAN REMO PLACE '\ 6"1WE A�'1'' i Ri
='0' CIRCLES 1 I °t
L
vosm cR.nE
REFER TO FIMIZONTAL CONTROL 11' \\ P \�,.T: 6y I.S IZed
PLAN FOR SIDEWAD( LOCATION NI `:�____________—_
I 8 GEOMETRICS. /�1 — LINL C_'ep-1 T1+6T TI{B E1eY4T10 �.(S
A _ 1% r 15 TYPE R � Wso MH_ _______ _ _____ I H______G/, Cp_Y6 xs N:A s I _,// r \T CURB INLET v� 1 , 2e of AT e.E j,J
__ . I 1 ��________ WVI
_ _ _iNjF 1 `\\ P R=48J}.TO i _ _ -�' I SJb ST nT\c\H� 1•
EI00=R.OY ,4 14'__�_ HHi MONACO PLACE ' I 1 TNF 714 'fie �•'L CG_ \ni,rH
_ ����_ /�/ '/ .i•'� ` 1 I N @,rr\ei\1S 49 SHC,,, 1.
3. 6NCflEiE iXICKI£ P.W SILPE 0.`.AS _ _ _ _ �_/i•��` 1� Y"/' ' \I . 1 lu FH
_ _
(SFE MEET CIS MF ttTNU
PROPOSED SECTION A -A `�"� _�"_-__��mil \ 'ice ---_ ---h ` `\ b i°o { 1 - T w-Vrw EN R wERa°w ( 6,
19]z' flmUWFD
20' I 11 `\`` `�_____ •\`•• .� .�. .. i' ' 'ii i 'fb TW. ) 111 I I I �NAH It
G `• t.�c+- 'Z�d adn
_ S
FLPROniCMDE -__t\_in
ass
mmm w-m wsL i 1 Is. 11 FF ELEV=
m°o-2m' `rwmci RA
e Pi M MAL S I CIS) FF ELEv1 ;II
RET
3' CONIRMRAN Si O'sa 1 (79.48) e1,
r
1 I I 11
IEEE stm C15 mfl WAU Fn/pELEV / II
11
PROPOSED SECTION H—H I I n.r i j a'` — 1 1 f TNi
r Try II RTO HORIZONTAL CONTROL PLAN ALL. N FOR A
1 1 �� ne ,du• I `I I1 I 1 II _ SIDEFER EWNCATIONS R LOCATIONS* GEOMETRY.
. 6.Y �769>, 1 LONGS
.!T i 1 IT EUO iXIN . n.W 11 j I II REFER TO SITE PLAN BY WATT k ASSOC. FOR
11 1 1 II SITE DETAILS, IE. HANDICAP R.1MP LOCATIONS.
4 I eT )L am NOR
T9� .76) I) �� '� 1 •14 �\ ncr/ 1 1 II II
i.H 11
1 T j
T�,,�P
TI'T
e.Oz) ) azG s} 6 e. I' I I I II
/ It
641 rate .,C JG. .. �. y :��1 T.S.0
is 1 1 .1.I1/
4- 0 40 81P75=T �
AIIIIIII
Lu
74 75 Scale 1" 40'
( T Til.W T.W
I I ■ ...
AQi UTILITY NOTIFICATION
CCE/N�T/EAR OF2OO COOLORAD
W \ TNu I
53 p 00 REMO
1 1 li $ OR WTV7W A1-8-92-1987
DVANCE
Ijl I ` \ �—_ i 1\ I 1 N BEFORE rou wa GNi OR nuv�M
jY�A \ 1 \ �_l♦` ; \ 1 It FOR THE NARKING OF UNCEAGRMIND
NEN9ER ununEs.
7J4 4� 11 II
A I 1
♦♦♦ l I ii lit
is
n u
NOTE nm I II I
--GRATE INLET
ELEVATIONS SHOWN IN PARENTHESIS HAVE BEEN _ \`� \ 1 � � \\ GRATE INLET_ =-� INV. EL 497082
PROVIDED BY OTHERS. HORIZONTAL LOCATIONS FOR THE �.
\ ♦ INV. EL. 4971.06 1 I RCP 11
ELEVATIONS SHOWN AS EXISTING IS APPROXIMATE ONLY. / -�-�� `\` \\ ` >� — I' 1 i 1111t 18"RCP
CONTRACTOR SHALL VERIFY THE HORIZONTAL AND VERTICAL / EXIST. CF TEF !�rAnoN `�`.\ II Ip
11 THIS DRAW1Nf H45 NFcu PREPARm BY
LOCATION OF ALL EXISTING ELEVATIONS SHOWN AND NOTIFY % �� j `� / \ 1 II 11 0I4�R4 ANO H45 Nbf BEII1 P.PP�T•EO
i FCFkN FTO HORIZONTAL \
ENGINEER OF ANY DISCREPANCIES. PMN OFORBCS IOEWAL% L AI ON` �`\ ``� i / \REFER TO zNTia CONTROL `\ II 11
i --- ♦ ♦\` . i f/JJBO0.MM� li II 11 GOOFaoFNTED, OR REVIEWED FOR
\ �. `. : : R\�GEOMETRIC3IOEN'Ml( LOCATION II 1 1 It .6, :°CCIIRPLT BY I�N'IMQ9TELTS, IVG
_________ �- `_,\_` __ __� _ _ yC_„___�1__i____ II .•.,n�"-___ END 18"RCP INV. EL. 4970 2. 7 \ \ \ \_ ` ` �_ / \ �_ Nr mis _
q 7: -ter--- CITY OF FORT COLLINS, COTARADO
_____
_ _ 1 II
n.
- � �'-r�--rf/T ✓• --� -------r---x INV. EL. 24m RCP 497 .it T177Id7'Y PLAN APPROVAL
u s 11 ,wvfla\ER'Tb:..q'v-
i _ _ EXIST. MANHOLE h 36• —>----STZ
j It BUDfir-ERRY VALVE °f O1�'�
ul
OPIP Mlwm no arm unmr
___________________________ ___--___
________ _____ _ _ _______— _____ - nc� umn oat
HARMONY ROAD (FK`HWAY T88) 1 0 CggiTE,9 NE Rm A PROPOSED EDGE OF PLAAN T xlx. °NHO� pie n,
e D.svx lsm DEi,R sxRr I]/IQ (SEE C10 FOR PLAN h F,,qs ,,� �, y,T
r
IV Revisions 13� Date
INV
0
LF�'
Obi
NORTHERN ENGINEERING SERVICESI r'N)C41 9K3.07 .....
420 SOUTH HOWES SUITE 202, FT. COLLINS, COLORAI 80521 J SCALE: 1" = 40'
DESIGNER :RAC GAS CHECKED BY: RAC
(970) 221-4158 it DRAFTSMAN: CADD PREPARED:05/27
HARMONY SAFEWAY MARKETPLACE
GRADING PLAN
I
GRATE INLETI 12"RCP
INV. EL. 4971.06 1 J MSL
24 R.C.P.�&
RE
I 1 EXIST TELE. RED. FLARED ENDS
COORD'REIAOVAL
AND @ELocArSoN
REMOVE EXIST HYDRANT FROM EAST SIDE OF MCMUR Y, '.. W/ �$ WEST, STORM MH-4A
& RETURN TO CITY. CITY WILL PROVIDE A NEW HYDRANT. 1 SiA 0+34.51 8' DU
CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLATION OF THE NEW HYDRA,T
ON THE WEST SIDE OF MCMURRAY, AS SHOWN `\
REMOVE AND REPLACE E T USXJ TO NEAREST RM MH-4
JOINT LINE EXIST /Ci5P114LT �'TO ULIMfRISMSHOWN ANDREP\ I - �P TEND 8%I WATER RI 'O /'
STA. 1+11 J2 ---
OSED WE
EXIS
�EXJST
6' 00.)
RCP
O
___ .__ __....
C;+ApE. TO MATCH EYLSL.OlMNN0.-
EXIST 36' WATER- --RESOD-ALL_DISIIKBED-ABEAS-----
- •'MAINsrtl ACC -T7 z1L (ppa' EXIST
N 89�29)I5IH" E )VEIL -PW£ - _ __Q9%5 _._ _ ``'<`__..
FLARED END SECTION\'. LIXIST. CESS MArvHOLE F Ill '«
PING 25 5]LF. 36 SiA 0+00.00 <
WDLEk M �Sy CL III R.CIQ.
4XB v S 84'4774 E 18" CLASS 6 RIPRAP (BURIED) W/
t-"�— I , --- 120 CLASS B BEDDING
__ ..._ 69.23LF. 38 bS4 (12'K24.V)
P CL III RUC ,.
N 45'00'00' E 4 4
3
NTS III DETAIL A
W \\y'].y�, Sd I i F�•j INV. EL E. 4965.45
'A OR `4 I F INV.GRATE INLET
r. /
i Y / B INV. yELP 4970.82
R lE 1 1 RCP ICxd6'BA
\ \ —y R W INV. 49 1 Be
OST
I+g L SIAHDPRD PO i R t IFx A-::K3 y\\
TIRE FAN _ _ \
URB^y _ \
II; PSSE LT
w•
t. vm
emu a�rsr�raL \\
__ BD UTLTY, DRAmAGE ANO _-_- - -,
__. _ w b'dl •� l.r,°T°'. - 4975
BYF. 95Lf 3 A'� w I ur ut F « Q.YY LF. IS' CII�
OOSRARC4)(
_777RSe>il'OS R.0 R UTS E 00" ypi f n .cn a cP.F _ �Y 0�SpQp Dp4A
�,�• x FE.6
--... _.� _ LI
v10 FEa AD (HIGH Y 68 area, F=�FDaDDm y
STORM SEWER LIE 3 3sak I'm
c
HARMONY RQAD (HIGHWAY 68) V' ,tea"/ g M
___--___ ____ I__ ____ _____-
Lew STORM SEWER
STORM SEWER LINE 3 PROFILE STORM SEWER LINE 4 PROFILE E'°" '" LINE 5 PROFILE
o -
z
as6o M
4980 w" 498I+n w -
0
oD va. __ ___ ffl C 3 aE.
3 S G Ig
4975 Bs Lr 3G' acP ss-L_F.aB•+�LP.- _. 4975 4975 -
-
ti-eses _ o osox Im&:
n - - xCL. \ L n
An-, A -- 4970 4970
AN0 JnQ JmA .p-- 06
1 TRICKLE JO 2' TRICKLE SJ 11 'do aN =-
Po3xz 0 veR Ossz
n, LL®a
4965 4965 :, of ,4
w M
�� n
= aasso " °
496D _ _
P
_'
_ -- 4955 955 — --
2+00 1+00 0+00 W J 2+00 1+00
No. Revisions B Date
1
REVISED PER O.C. DEs
I OS/IB/s]
2
REVISED STORM SEWER AUONMEM AND PROPIU ou
W/3D/9]
3
REVISE MCWIRRAY STORMS2SEWER RAC;
11/f0/97
4
REVISED STORM ALIGNMENT AND PROFILE COL
0Y/m/BB
DNA
NOOKS,
MY
1
I
i
I
1
I
I.
1
I
E
I
'
\
` l l PWORI
�• I x
rtW
I
i
MIIN YlW
WTf6A
• (MOMTP TO m[
LMXC FIIW
SELL SO tl TK
MARC Ow.a NOT
NO xuE.
CAn
Imm.
on]
ME.�'
CAM
•
L
rY(
pA.
AA
NA AS
o[
Ar10Nl
SOAR
T,n
aEaRaRa
4�wW.
.na
Nrrr P.TE.
OM4Jl
s
'aaa� r��,me
n.CFPe
WA
M.fYM I
STANDARD
PRECAST WYE
E@
•, a
'-
PLA
YANNOLE PHASE,
o MOTE OTT LIKU I
D Axm oaux uO
0 •Wu•Mw (Taa<u•)
D DOES
PLAN KW
INKCION a END ��OND .Ra a FOR
ITO E
rz. U
MO
_--_I._m.
III♦—
_
m—m_.m_m—
_-m_m_mm—_—
mmmM_mmmmmm—
m�mmm■mmm�
STANDARD ELBOW
W/ MANHOLE TEE
LV
PLADES
PLASTORM
1)1.t
3EWEA
a
L! 8
CULVERT
,
�IL �
Mrm
m
�-NO AV84LE I A � �zNpE
�E2
RMO+E EXISTINGNGf
R C P.
k REPILCE W/ 2CP
MATCH DUST. SLmk EVEN
TS
RLET-
O+AV
• q _ D B SO TYPE RRN�LT
s IT IE waomEqZm
O L„ v
STORM SEWER LINE 6 PROFILE
CALL UTILITY NOTIFICATION
49851
4985
4985
4985
-
-
4980
4975
=-
��
- -mp
v
--
4980
4975
4980
4975
"1
a
Y
_'�
, ++
0K3K`-4980
4975
-- -
�tg
- ._�
NG
_
4970
4970
__
SEARS
_
'_'
+i
t 0
W_ 94
--
4970
4970
—'-
--w
N<c l
--
-
4965
-
I4965
4965
AGE 0,35x'I
-`A��tr_
L`
- �-
4965
-
--
COT
Hfe 5
_-
a
_
4960
4960
I
.
II
RID5
E
oo
'G� a.
x
>
_
_
=4960
=uff
0+00 1+00
2+00 1+00
rfiE�I�gIG SERVICES I Pro)ect:
A2n smrrT+ NnWRs sT11m9: 202. FT COLONS. COLORADO 80521 SCALE: 1
yVV
Print Date: Eq,,At O9py.,[o^�^
OOTqT"
emt
Floe o�x�ne�EnT ITT q CKED BY: XXXXX .m0� r
DARED: 03 11 97 .iz_
CENTER OF COLORADO
1-800-922-*87
OR -67OO OE�ao
C/EL z BUSINESS BAYS IN P ANLE
BEFORE YOU DIG, GPADE OR EXCAVATE
FOR THE WARNING Or UNDERGROUND
EMBER UDUTIES
50 a 50 100
nor
Scale 1" = 50'
CITY OF FORT COLLINS, COLORAD(
UTILITY PLAN APPROVAL
ro: AMID°
ANN
CHECKED Bf / 2.
AUC
CHECKED ON. THE Y Y
CHECKED SO
HARMONY SAFEWAY MARKETPLACE
STORM SEWER
PLAN & PROFILE
Shee