Loading...
HomeMy WebLinkAboutSite Certifications - 03/25/1995STEWART&AiSSOGATES Consulting Engineers and Surveyors March 24, 1995 Mr. Basil Hamdan Stormwater Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522 Dear Basil: 30 ��,1-5 Re: Phase Two construction at ,One-Prospect.P.U.D?(1601 Prospect Parkway). We have surveyed the as -built elevations of the building, parking lot curbs and drainage pan which were recently constructed on the east part of lot 1 of One Prospect P.U.D. at Prospect East. These elevations are shown in red on the attached plan. The first lift of pavement and all proposed landscaping has been installed along the north and east sides of the building. the west parking lot is based and ready for paving. The silt fence called for along the east and south sides of the project has been removed because all vegetative and structural erosion control measures are in place. ` This project is constructed in substantial compliance to the planned grades and facilities, and erosion control measures are all satisfied except for some silt clean up in the concrete drain pan along the south side of the construction site. Please call if you have any questions. Sincerely, Phillip I. Robinson, P.E. & L. S. Vice President rsc cc: Mr. Bruce Anderson, Wyatt Construction James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382 4502 A 5� ._ e. & V _: