Loading...
HomeMy WebLinkAboutSite Certifications - 07/20/1993STEWART8&SSOC ATES Consulting Engineers and Surveyors July 20, 1993 Ms. Kate Mahler Storm Water Utility City of Fort Collins P.O. Box 580 Fort Collins, CO 80522-0580 Dear Kate, This is to certify to you that the overflow drainage swale along the East line of Lots 7, 8, and 9, Overland Hills First Filing was regraded. The swale was staked and graded on July 13, 1993 and an "As Built" survey was made, under my supervision, on July 14, 1993 of the swale. The "As Built" elevations are shown on the enclosed copy of Sheet 3 of 8 of the Overland Hills First Filing Utility Plans. If you have any questions regarding this swale, please call._ 4 Sincerely,„„�� a Richard A. Rutherford, P.E. & L.S. : 5028 President =*� jm cc: David Stringer �'o`�'l••:t &L.`; 'I�f%Z`••••• o•N• encl. ,(-- OF Z James H. Stewart and Associates, Inc. 103 S. Meldrum Street P.O. Box 429 Ft. Collins, CO 80522 303/482-9331 Fax 303/482-9382"