Loading...
HomeMy WebLinkAboutSite Certifications - 08/29/2013LR�Opgm ENGINEERING n: S Ayy Letter 238 WALNUT STREET, SUITE 200 FORT COLLINS. CO 80524 970.420.5345 of Transmittal: TO: JAY BARBER (CITY OF FORT COWNS STORMWATER) FROM: JOHN GOOCH DATE: AUGUST 29, 2013 PROJECT. • OPIUM CREEK FARM NORTH. FIUNC NO.3 C PROJECT NO: 600-005 RE: DRAINAGE CERTIFICATION We are transmMnr the following: ✓ 1 copy (signed & sealed) of the Drainage Certification THANK YOU, JOHN GOOCH, PE ASPEN ENGINEERING CC: FILE SC GROUP INVESTMENTS ENGINEERING May 29, 2013 Mr. Jay Barber City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 Re: Drainage Certification for Spring Creek Park (Spring Creek Farms North Filing No. 3) Dear Mr. Barber, The purpose of this letter is to provide the grading certification for Spring Creek Farms North Filing No. 3, which is located southwest of the Police Facility in Fort Collins, Colorado. Aspen Engineering reviewed the record survey, prepared by Edmonds Land Surveying, Inc. on August 16, 2013, and also visited the site on several occasions between August 17t' and August 27, 2013. Based on the provided record survey and visual observation, Aspen Engineering asserts that the proposed grading appears to meet the intent of the approved grading and drainage plan, with the exception of some of the contouring along the west bank of Pond 200 being steeper and located further west than shown in the approved plans. Aspen spoke with and provided Wes Lamarque an exhibit showing the asbuilt contours versus the proposed contours for Pond 200 to confirm the slight difference in contouring was acceptable. Mr. Lamarque confirmed the pond contours were acceptable. Aspen has provided the asbuilt rating curve for Pond 200, which provides for a water quality/detention volume of 2.51 acre-feet at elevation 4940.15, versus the proposed detention volume of 2.37 acre-feet at elevation 4940.05. It's important to note that because the west side of the park/pond was required to be raised 1.20' to accommodate City of Fort Collins cover requirements over the two 18" storm sewer pipes, the free -board (top of weir) elevation of the pond was increased from 4940.05 up to 4940.50. Accordingly, the flowline elevation of the overflow weir was also raised from 4939.70 to 4940.15, thus maintaining the 0.35' of weir height per the approved plans. This change has little to no impact on the park/pond, with the exception of the pond volume capacity increasing, which is a benefit to future development adjacent to the park/pond (west of Joseph Allen Drive). Please refer to Exhibits 'A' and 'B' for the asbuilt Pond 200 contours and the asbuilt rating curve. Grading within the park/pond area appears to provide positive conveyance of storm water to the southeast comer of the park/pond, in accordance with the approved grading and drainage plan. Grades within the park/pond area vary from approximately 1.2% to 28%, thus providing positive conveyance of stormwater runoff to the proposed water quality/ detention pond outlet structure, located in the southeast comer of the park/pond. The water quality/ detention pond outlet structure appears to have been constructed correctly and meets the intent of the approved plans and detail for the structure. Please refer to Exhibit `C' for asbuilt information on the structure. Overall, the grading and.drainage for Pond 200 appears to meet the intent of the approved plans for the Spring Creek Farms Filing No. 3 project, with Aspen submitting this certification for the City of Fort Collins' records. Please do not hesitate to contact me with any questions. Sincerely, FtYA ``OZ51 1-19-13 JOHN GOOCH, PE ASPEN ENGINEERING 1 "7? t� aWR o W Z Z -N V. V- 3 W Q ?la Karp Hdaso` — . 15 lu Q v ^ �1 I s 1 i i 1 1 LU r l� s t t 1 11 • o 0 Y 4 6 't 1 i s 4 m S 1 N ,601BIT `B ' Spring Creek Park Asbuilt.Rating Curve 8-29-13.txt SPRING CREEK FARMS NORTH FILING NO. 3 Pond 200 ASBUILT RATING CURVE JRG 8-29-13 PROPOSED 100-YR VOLUME = 2.37 ACRE-FEET at ELEVATION 4940.05 PROVIDED 100-YR VOLUME = 2.51 ACRE-FEET AT ELEVATION 4940.15 THE 100-YR VOLUME OF 2.51 ACRE-FEET FOR POND 200 is achieved at elevation 4940.15. COVER REQUIREMENTS OVER THE TWO 18" RCP PIPES REQUIRED THE WEST..SIDE-OF THE PARK/POND BE RAISED UP, THUS INCREASING THE FREE-BOARD•ELEVATION FROM 4940.05 TO 4940.50..THEREFORE, THE 100-YEAR WSEL INCREASED FROM 4940.05 TO 4940.1, THUS MAINTAINING THE 0.35' OF FREEBOARD CALLED FOR IN THE APPROVED PLANS. s THE 2.51 ACRE-FEET ASBUILT VOLUME WILL BE CARRIED FORWARD IN THE DESIGN FOR THE SPRING CREEK FARMS NORTH FILING NO. 4 PROJECT AS THE STORAGE CAPACITY OF POND 200. #units=Elevation,ft,Area,it2,voluine,acft,volume,acft # Elev Area Cumml Avg Cumml Conic # ft - ft2 acft acft 4940.5000 42601.8423 2.8661 2.8319 2 S�jkr=i D 4940.0000 39468.0272 2.3951 2.36� 4939/.0000 34683.7275 1.5440 1.5105 0 ggga�5 4938.0000 29788.0447 0.8039 0.7712 4937,.0000 15838.8974 0.2802 0.2558 , 4936.0000 .4164.8610 0.0506 0.0406 4935.0000 189.2940 0.0006 0.0004 4934-.7200 1.6710 .ti 0.0000 0.0000 Page 1 _, 1 �J 411, _ 51:eg `R�a€ � R i� L y1y�ii ,sasasassesasossl I. ti.......... mum I.►•J...........m.l . IMMUMMMEMMEMMMumul 1................1 I.....aa.........I 1...............- 1..............' I 1......---mama. 1.....1 uom"m 1T=..■ I..mma ,.....1 ,m....l Immam. Imam.. mama ImamIMMI •.....1 ■.....1 ......1 ,.mall, ,.._..., on Lh6��.n mi'Join