HomeMy WebLinkAboutSite Certifications - 12/20/1995 (2)RMINC. Engineering Consultants 209 S. Meldrum Fort Collins, Colorado 80521 303/482-5922 FAX: 303/482-6368 Mr. Basil Hamdan City of Fort Collins Utility Services Stormwater 235 Mathews Street Fort Collins, Colorado 80522 RE: Arapahoe Farms TbWhhome_s P;U:_D_=Phase I1 Drainage Certification PROJECT NO.: 607-004 Dear Basil: z" /z Olt S December 13, 1995 L` V i/ On December 1, 1995, RBD,Inc. field verified the elevations at the Arapahoe Farms Townhomes for Phase II. The attached Drainage Plan and Grading Plan shows the elevations found. Also, please find the detention volume calculations for the south pond located in the southeast corner of the site. The detention capacity is adequate for the completion of Phase III construction. The finished floor elevations of the building units are higher than the surrounding areas and will be protected from developed runoff. The drainage around buildings `G', `H', `I' and `J' follows underdrains in swales around the perimeters where shown on the drainage plan. Runoff from phase II of the developed site will be conveyed to the north pond by two channels, one is the private drive on the south side of units `E' and `F' and the other is Swale `F' north of the buildings. The private drive is paved having adequate flow capacity for runoff from the developed site. Final grading of the south pond with a concrete pan was completed. The pond has inflow from Harmony Road via 15' curb inlet with three 24" diameter pipes (equivalent area to a 42" diameter pipe as shown in the drainage plan). The three 24" diameter pipes were used to avoid conflicts with existing utility lines within the Harmony Road R.O.W. Thank you for your time and consideration of this Certification submittal. Sincerely, RBD Inc. Engineering Consultants Gs�c� Terrence McEnany, P.E. Project Engineer cc: James Company Denver 303/458-5526