HomeMy WebLinkAboutLot Certifications - 12/20/2006oct*L 19 or. 07: osp
z &0v Aw
ZVG474EE ING CORPORAMN
161c Lad &re f sw
LOWIM74 CO 80537
970-667.8010
Fur No. 970467-8024
STORMWATER
RECEIVED
Sl RECEIVED
Sand to: Froaar0
'�
r •�
�lttea>t
r LZOlp—
I % l e.. CU , CASPa»jatNa : G ��
Farmmnbes OQ t — �It �� PbavAe 1 �!J ! a,
�O�Af�c�a,�a
0 vaear 0lk*AUP. QPleuramnuismt [D.Plawa+ ww jOForyoarrParfaammeM ..
to
avItcii,4 lo(Z3/0,6
Oct.19 06 07:05p
p.2
Citv of Fort CoULTis
aierrc a stormwater a :+aste..ater o water
CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-544 and
City Land Use Code § 3.2.2 (e)
STORNIWATER
RECEIVED
OCT 2 0 Z006
(,(Print) .�u � li G✓G%f-ice a Colorado registered professional engineer,
have personally inspected the above referenced property in the City of Fort Collins, Colorado, and verify
that. construction of all stomrwater facilities and grading there is complete, and that the elevations and
drainage patterns shown on the attached drawing(s) which were developed from a survey performed on
(Date) DctaUa?= U f ZAO(oaccurately and truly depict the elevations and drainage patterns as
they existed on the date of the survey. Based on this information, I certify that (check one):
The elevations and drainage patterns of the lot are in substantial conformance with the City
approved drainage and grading plan or revised grading plan for the party information
attached). SEE NOTE.
O The elevations, and draurage patterns of the lot as measured are in general conformance with the
City approved drainage plan or revised grading plan with exceptions (information attached). In
my professional judgment the elevations and grading of the lot as corm o ucted is functionally.
adequate and Will allow for stormwater drainage consistent with the approved drainage plan.
SEE NOTE. ;
I-
NOTE:
A COMPLETE awaftwbon must be submitted, trndoding but not Ibnited to dnawbrgs of the W5 is showing tin approved design or
ra" design and as -Inuit surveyed elevations of all sMxtu es -and drainage and grading teahues (e g. swakm retabdng walls, lot
cornam). written �anatlon of discrepancies, etr. to:
Fort Collins Utilities (970) 221-MO
700 wood sheet
Fortcallins, co MM
At Least Two weeks prior To Requesting A Certiflrale Of occupancy For The Property
Oct.19 06 07:05p
p.3
GRADING CERTIFICATION
STORMWAT E
RECEIVED
OCT 2 0 2006
30 0 30
LOT 46 �■
1221 BATELEUR LANE SCALE 1"=30'
HEARTHFIRE PUD 2ND FILING
SHOT
FT. COLLINS, COLORADO x� PE'CCOS ENGINEERING
I, Thomas M. Donnelly, a duly registered Professional Land Surveyor In the State of Colorado do hereby state that
the elevations shown on this Grading Certificate are the direct result of field shots taken October 6, 2006 by me
or by personnel under my supervision, andcF field conditions on the date of the survey.
::::
�04;37620
IDonnelly
►+orcE
n la.. y
cammenhi am lei•
cn
n b e
aetbn hosed an any aefsct to thts sarvey rlthN THREE
any n " s
Thomas M
•
'.
yam after you flat discovered such defect In no
for and on behalf of
., lo�q/ob:
avant, may any action based upon any defect In this
CDS Engineering Corp.
'•. .••
•.....•
mom t haremown years from tt�e
date be commenced certification
the
SCALE- 1• - 36
ngineering
PROA=NO. 3969
DATE: 10/09/06
CorporationGREG
165 d ST
2n
LOVELA9D o) 667 A8 10 80538
BULLARD
DRAVMG No, 3969—L46
FIELD BOOK: N/A
REVISION Na
DRAWN: TMD
CHECKED: M,iD
SET 1 OF 1
Oct.19 06 07:05p
I
4
. A
IL
TOF=0&52
FG-04.52
V-
A7 971,
&I
-64:5-L
ENGINEERING
CORPORATION
W SW.Md V
LGVELW. CMMKM 9=
SCAM- 1 20' (0") yes-MIO
p. 4
RECElVtD
OCT 2 0 2006
CENT: BETI
BULLARD
ws amm"m caft-MIN
Oct.19 06 07:06p
p.5
STORMWATER
RECEIVED
DRAINAGE CERTIFICATION FORM
OCT 2 0 Z006
Please fill out all applicable items in this certification
form for single family, multi -family and commercial
properties.
Write "OK" for items checked or actual number checked in
field.
Use "N/An for items that are not applicable to the property
that is being certified.
A. Drainage facilities certification
tJA 1. Pond Certification
-volume verification
a.t000graphic records and volume
b.cross-sections and spot elevations
-positive fall to pan
-side slopes
-invert elevation
-spillway elevation
-placement and size of riprap
-side slopes
-grading
-orifice plate installation and size-
-compaction of bean
-structural integrity of pond
1 A 2. Swales
-location (are they within easement).
-dimensions and cross-section verification
-longitudinal slopes and side slopes
-spot elevations
Oct.18 06 07:06p p.6
STORMWATER
RECEIVED
OCT 2 0 2006
-permanent erosion control measures (drop structures,
riprap, etc....) -
-tie-in to pipes, pans, curbs, etc....
-weir size (elevations, size, opening, etc.)
-available freeboard
-landscaping infringement on swales
OA 3. Pipes
-size and type
-slopes (as -built and comparison to minimum 0.4%
slope)
-pipe capacity calculations if slopes are
significantly altered
-invert elevations -
-installation and backfill material
-cover
-encasement and clearance from other utility lines.
close by
-joints
NA4. Concrete Pan Channels
-size
-slope
-super elevation
-cross .section
-thickness
-elevations
IA S. Inlets
-size and type
Oct.19 06 07:06p
STORMWATER
RECEIVE®
-size of opening ;or name of standard used)
-grate elevation_
invert elevation
-box size
6. cross pans
-size
-type
-grade
-elevation
-cross-sectional depth
-tie-in to curb and gutter
NA 7. Culverts
-size
-type
-invert elevation
-headwalls
NA 8. Underdrains
.size
-type
-cover
backfill
-geotextiles
-cleanouts
9. Curb cuts
-size
OCT 2 0 2006
-tie in to swale, pipe, etc...
B. Certification of Grade, Blevations Adjacent to Drainage
Facilities:
Oct,19 06 07:06p
P. e
,+9 99,Z-minimlm opening elevations
5006,) -top of foundation elevations
4r*2 -comparison to 100 year WSEL's (Freeboard
requirements and floodplain issues)
C. Certification of Erosion Control Measures:
STORMWATC`wR
RECEIVED
OCT 2 0 2006
1. Permanent Measures:.
-Permanent vegetation (6^ bare spots and weeds under
control)
-riprap
-riprap bedding
-drop sections
-sediment basins/water quality ponds
-netting mats/blankets
-mulching
iJA 2. Temporary Measures:
-mulching
-inlet filter installation
-check bale dams
-seeding and temporary vegetation
-silt fence
D. Site Cleanup After Construction
construction clean up
smoothing of ruts
-reseeding
E. statement of Camtipliance
This certification is signed and stamped and by signing
this form the engineer(s) attests that they have inspected
Oct.19 06 07:07p
p.9
STORMWRTER
RECEIVED
OCT 2 0 2006
the site and to the best of their knowledge the as -built
conditions of the drainage facilities are as described in
the above form and in the redlined plans enclosed.
=ailure to properly disclose all (mown information could
result in the rejection of this certification and prevent
the release of any Stormwater Utility holds on Building
Permits and/or Certificates_ of occupancy.
F. Signature and Stamp by a Colorado Registered
Professioaal 4nQ+Mmr.
10