Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Grading Plans - 11/15/2005
November 10, 2005 Mr. Chad Gray 1712 West Stuart Street Fort Collins,,Colorado 80526 STORMWATER RECEIVED NOV 10 2005 Re: Final Grade Survey Proposed Single Family Residence Hearthfire Estates, Phase 2 3314 Buteos Court — Lot 38 Fort Collins, Colorado Terracon Project No. 20055086 Gentlemen: Irerracon Consulting Engineers & Scientists Terracon Consultants, Inc. 301 North Howes Fort Collins, Colorado 80521 Phone 970.484.0359 Fax 970.484.0454 www.terracon.com I hereby state that the elevations and drainage patterns shown on the enclosed Final Grade Survey Plan were developed from a survey performed on the referenced property on November 9, 2005, and accurately and truly depict the elevations as they existed on this date. The relative elevations as depicted may change subsequent to the date of the survey, due to the subsidence or upheaval of soil, addition or removal of soils by acts of man, erosion by wind or water or other factors. Therefore, this survey may not accurately depict the elevations and drainage pattern of the referenced property after the date of the survey. David A. Richer, P.E. 27712 Professional Engineer P.E. Number nber 9, 2005 Date of Survey The elevations and drainage patterns shown on the attached Plan are the Professional Engineer's findings of the finished ground grades around the residence on the date shown above and generally conforms to the attached "approved" grading plan for the lot with the exceptions as noted. You, the Homeowner, must maintain these elevations and grades to properly drain the water away from your house. The Builder of your home will not cover damage to your home caused as a result of changes made in the finished grades. In addition, it is our understanding that any residential warranty agency providing limited warranty protection on your residence on behalf of the Builder will not cover structural damage caused as a result of changes made in the finished drainage grades. Therefore, it is your responsibility, the homeowner, to maintain the grades as set by the Builder and as stated by the Engineer. Delivering Success for Clients and Employees Since 1965 More Than 70 Offices Nationwide I f 96.4 (96.00) NO PIN FOUND LOT 38 96.1 HEARTHFIRE 2nd 13,402 S.F. '� 97.0 96.7 • 96.7 p 95.7 LOT 39 Q 97 1 Q 97 96.8 p STORMWATER RECEIVE© NOV 10 2005 9 �'OG� 0 97.5 99.1 �° sRcy 97.2 Q 98. c ��so tiT 9�'�cyFo L.O. 97.2 98.6 F F.F.F. 93.6 \ 100.2 8. 97.9 98.6 97.77 98.8 NO PIN FOUND 97.9\ • 98.2 Ir UTILV \---EASEMESEMEM BUTEOS COURT 97.7 97.8 (97.27) NO PIN FOUND LEGEND • DIRECTIONAL FLOW ELEVATION POINTS DIRECTION OF FLOW O TBM=S/E/C PROPERTY PIN DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES. • 97.2 .5 LOT 37 )96.0 94.9 (94.00) NO PIN FOUND TBM PC \ Aqtc �y o i ACE \ \ \ \ \ Vol 12 \. \ / 96.80 / 10' U.E. \5p96 f 5100 �\ A \ J FUM 'BUTEOS 6"Pvc WA IJRT FG=99.00 _ o co - I ' 37 50 Q�jO (STA: 1+78.00 o ooLHG=97.70 6 b j g6.00 9s Ao 9 35 FG=95.90 34 �IRMMddm F/I: OUT 10 Y JSIVE T 0 STORMWATER RECEIVED 2005 LOT 39 I HERBY STATE THAT THIS IMPROVEMENT LOCATION o erA L CERTIFICATE WAS PREPARED FOR MR. GREG MARTIN; f��J:•�: THAT IT IS NOT A LAND SURVEY PLAT OR IMPROVEMENT' a�, SURVEY PLAT; AND THAT IT IS NOT TO BE RELIED UPON FOR THE ESTABLISHMENT OF FENCE, BUILDING OR OTHER FUTURE IMPROVEMENTS. I FURTHER STATE THAT THE IMPROVEMENTS ON THE ABOVE -DESCRIBED PARCEL ON THIS DATE 11/10/05 EXCEPT UTILITY CONNECTIONS, ARE ENTIRELY WITHIN THE BOUNDARIES ON THIS PARCEL, FIGURE 1: IMF EXCEPT AS SHOWN; THAT THERE ARE NO HI ENCROACHMENTS UPON THE DESCRIBED PREMISES BY IMPROVEMENTS ON ANY ADJOINING PREMISES, EXCEPT AS INDICATED; AND THAT THERE IS NOT APPARENT EVIDENCE OR SIGNS OF ANY EASEMENT CROSSING OR BURDENING Project Mngn ANY PART OF SAID PARCEL, EXCEPT DRIVEWAY. DAR DAVID A. RICHER, P.E. No. 27712 DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES.