HomeMy WebLinkAboutLot Certifications - 02/10/2006 (5). , Feb 06 06 12: 22p
P.2
L tLities
eiectric a stormwater a 'wastewater o i%-ater
CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-544 and
City Land Use Code § 3.2.2 (e)
Date:. *' oe
Permit Applkation No.
Address:I l 11 / •K
Subdivision: ZwMaLoA
1,(Print) L �f� , a Colorado registered professional engineer,
have personally inspected the above referenced property in.the City of Fort Collins, Colorado, and verify
that construction of all stormwater facilities and grading there is complete, and that the elevations and
drainage patterns shown on the attached drawings) which were developed from a survey peiformed on.
(Date) 211 f Di0 accurately and truly depict the elevations and drainage patterns as
they existed on the date of the survey. Based on this information, 1 certify that (check one):
_ The elevations and drainage patterns of the lot are in substantial conformance with the City
\approved drainage and grading plan or revised grading plan for the property (information
attached). SEE NOTE.
❑ The elevations and drainage patterns of the lot as measured are in general conformance with the
City approved drainage plan or revised grading plan with exceptions (information attached)_ In
my professional judgment the elevations and grading of the lot as constructed is functionally.
adequate and will allow for stormwater drainage consistent with the approved drainage plan.
SEE NOTE.
By:
'ature, PE stamp]
l f o551�5rSVJ : 1:�u�tc.0 oeo5�s7
address of signing -party)
NOTE:
A COMPLM cerfirrcatim must be submitted, including but not united to drairRigs: ot7Ae lothite showing the approved design or
revised design and as -bulk surveyed elevations of all structures -and drainage and grading features (e g, swales, retaining walls, lot
cornerswritten informationlexptanation of discrepancies, etc, to:
Fort Collins utilities (970) 221-UW
700 Wood Street
Fort Collins, CO 80521
At Least Two Weeks Prior To Requesting A Certificate OF Occupancy For The Property
YqD �►��a�
Feb 06 06 12:22p
p.3
GRADING CERTIFICATI
LOT 30
1209 TOWN CENTER DRIVE
HEARTHFIRE PUD 2ND FILING
FT. COLLINS, COLORADOI
30 0 30
SCALE 1"=30'
x LE INDICATES GROUND SHOT
PER COS ENGINEERING
-11
I, Michael J DeDecker, a duly registered Professional Land Surveyor In the State of Colorado do hereby state that
the elevations shown on this Grading Certificate are the direct result of field shots taken February 1, 2006 by me
or by personnel under my supervision, and arel to represent field conditions on the date of the survey.
ji / !% t• NOTICE According to Colorado law, you MUST commence any legal
action bused an any defect in this survey within THREE
Michael J DeDecker PLS 20676 76 yam after you first discovered such defect. In no
For and on behalf of'. event. may any action based upon any defect in this
CDS Engineering Corp. g'. /r��Q�� survey be commenced acre than TEN years from the
date of the certification shown hereon.
SCALE: 1" - 36 ngineering JOHN PROJECT No, 9435.54
DATE: 2-06-05 Corporation MAWING Na 9435—L30
FIELD BOOK: N/A 155 2nd ST SW WALZ REVISION No.
DRAWN: TMD CHECKED: M,lp LOVELAND. COLORADO 80538 ENTERPRISES
(970) 667-8010 I 94EET 1 OF 1
Feb 06 06 12:23p J p.4
2�
r
40
37
J
IN
AC
A t
rt
i%
Cl)
7K
M
M
<
M
Feb 06 06 12:23p
p.5
DRAINAGE CERTIFICATION FORM
Please fill out all applicable items in this certification-'
form for single family, multi -family and commercial -
properties.
Write "OK" for items checked or actual number checked 'in '
field.
Use "N/An for items that are not applicable to the property
that is being certified.
A. Drainage facilities, certification
�jA 1. Pond Certification
-volume verification
a.topographic records and volume
b.cross-sections and spot elevations
-positive fall to pan
-side slopes
-invert elevation
-spillway elevation
-placement and size of riprap
-side slopes
_grading
-orifice plate installation and size_
-compaction of berm
-structural integrity of pond
NA 2. Swales
-location (are they within easement),
-dimensions and cross-section verification
-longitudinal slopes and side slopes
-spot elevations
Feb 06 06 12:23p
p.6
-permanent erosion control measures (drop structures,
riprap; etc....)
-tie-in to pipes, pans, curbs, etc....
-weir size (elevations, size, opening, et"c.).
-available freeboard
-landscaping infringement on swales
14-A 3. Pipes
-size and type
-slopes (as -built and comparison to minimum 0.4%
slope)
-pipe capacity calculations if slopes are
significantly altered
-invert elevations
-installation and backfill material
-cover
-encasement and clearance from other utility lines
close by
-joints
�IA 4. Concrete Pan Channels
-size
-slope
-super elevation
-cross -section
-thickness
-elevations
Jk 5. Inlets
-size and type
Feb 06 06 12:23p
p.7
m
gA7.
-size of opening (or name of standard used)
-grate elevation
invert elevation
-box size
Cross pans
-size
-type
-grade
-elevation
-cross-sectional depth
-tie-in to curb and gutter
Culverts
-size
-type
-invert elevation
-headwalls
8. Underdrains
size
-type
-cover
backfill
-geotextiles
-cleanouts
NP-.9. Curb cuts
-size
-tie in to swale, pipe, etc...
B. Certification of Grade Elevations Adjacent to Drainage
Facilities:
Feb.06 06 12:23p
p.8
150 $7.2 -minimum opening elevations
50 99.5 -top of foundation elevations
95071*6 -comparison to 100 year WSEL s (Freeboard -
requirements and floodplain issues)GR1lhct►z��sL�'t�
C. Certification of Erosion Control Measures:
c,r „
1. Permanent Measures:
-Permanent vegetation (5" bare spots and weeds under
control)
-riprap
-riprap.bedding
-drop sections
-sediment basins/water quality ponds
-netting mats/blankets
-mulching
2. Temporary Measures:
-mulching
-inlet filter installation
-check bale dams
-seeding and temporary vegetation
-silt fence
D. Site Cleanup After Construction
-construction clean up
-smoothing of ruts-
-reseeding
Statement of Compliance
This certification is signed and stamped and by signing
this form the engineer(s) attests that they have inspected
• .Feb. 06 06 12:24p p.9
the site and to the best of their knowledge the as -built
conditions of the drainage facilities are as described in
the above form and in the redlined plans enclosed.
Failure to properly disclose all known information could
result in the rejection of this certification and prevent
the release of any Stormwater Utility holds on Building
Permits and/or Certificates.of Occupancy.
Lowot. Signature and Stamp by a Colorado Registered