HomeMy WebLinkAboutLot Certifications - 04/10/2007 (29)Apr 09 07 07:03p
p.2
U�`cites
electric a stern water a r"-9stvA :ter • water
CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-544 and
City Land Use Code § 3.2.2 (e)
Date:— a/ �s .. �
Permit Application
•' '• �� �F
Subdivision: 7•u1 1' r • ' ._ig
S ATER
RECEIVED
APR 1 o 2007
�j-
1,(Print) �� L a Colorado registered professional engineer,
have personally inspected the above referenced property in the City of Fort Collins, Colorado, and verify
that. construction of all stormwater facilities and grading there is Complete, and that the elevations and
drainage patterns shown on the attached drawing(s) which were developed from a survey performed on.
(Date) Am iL to azo accurately and truly depict the elevations and drainage patterns as
they existed on the date of the survey. Based on this information, I certify that (check one):
The elevations and drainage patterns of the lot are in substantial conformance with the City
approved drainage and grading plan or revised grading plan for the property (information
attached). SEE NOTE.
❑ The elevations and drainage patterns of the lot as measured are in general conformance with the
City approved drainage plan or revised grading plan with exceptions (information attached). In
my professional judgment the elevations and grading of the lot as constructed is functionally .
adequate and will allow for stormwater drainage consistent with the approved drainage plan.
SEE NOTE. .
-5 nature, PE sta
;.- 11Q5 ,2►a�,S-r�.�r�1N,
CC 7
(address of signing party)
NOTE:
A COMPLETE certification must be3idimitt ed, including but not Gmfied to drawings of the lotle to showing the approved design or
revised design and as-bw'h surveyed elevations of all structures -and drainage and grading features (e g. swales, retaining watts, lot
comers). written " of discrepancies, etc. to:
Fort Collins utilities (970) 221-6T00
700 wood street
Fort Collins, CO t1 W
At Least Two weeks Prior To Requesting A Certificate Of Occupancy For The Property
FPr 09 07 07:05p
P.8
GRADING
CERTIFICATION
-"•g k — OF=97.
/ 7.1
STORMWA
RECEIVE
APR 10
,
30 0 30 LOT 271109 TOWN CENTER DR
HEARTHFIRE PUD-
SCALE 1"=30, 2ND FILING
X® PEERCATES EGROUNNDD' GOT FT. COLLINS, COLORADO
I, Michael J DeDecker, a duly registered Professional Land Surveyor in the State of Colorado do hereby state that
the devotions shown on this Grading Certificate are the direct result of field shots taken April 6, 2007 by me or
by personnel under my supervision, and are to represenj field conditions on the date of the survey.
N0110E:
AaoordYhg to Coloroda law, you MUST cammwnce any legal
octlon Eased an any defect in this survey w Khin 7HREE
Michael J DeDecker PLS 20676
For and on behalf of
7
�y
ymm attar you rust dhromxed ach defect In no
event. may any action bawd upon any defect In thie
CDS Engineering Corp.
•'•
/
date of th owtWwation share herrmn. EN a from the
SCALE: 1` = -V
gineering
Corporation
165 2nd ST SW
LOVELAND, COLORADO 80538
970 667-8010
JOHN
WALZ
ENTERPRISES
PROJECT NO- 9435.60
DATE: 4-09-07
DRAW= No. 9435 L27
FIELD BOOK: N/A
Na
DRAWN: TMD
CHECKED: MJD
OF
SIEET 1 1
Apr 09 07 07:05p
.9
is
BAR
ENGINEERING
CORPORATION
TITLE
MASTER GRADP
ALLEGE
AVE, SUITE 12, FORT
COLLINS, COLORADO 80525
1
HEARTHFIRE
0) 226-5334
(970) 226-4451 FAX: (970) 282-0311
FT. (
Apr 09 07 07:04p
DRAINAGE CERTIFICATION FORM
p.3
STORMWATER
RECEIVED
STORMWATER
RECEIVED
Please fil-- out all applicable items in this certification
form for single family, multi -family and commercial
properties.
Write "OK" for items checked or actual number checked in
field.
Use "N/An for items that are not applicable to the property
that is being certified.
A. Drainage facilities certification
W1. Pond Certification
-volume verification
a.topographic records and volume
b.cross-sections and spot elevations
-positive fall to pan
-side slopes
-invert elevation
-spillway elevation
-placement and size of riprap
-side slopes
_grading
-orifice plate installation and size-
-compaction of berm
-structural integrity of pond
kk 2. Swales
-location (are they within easement).
-dimensions and cross-section verification
-longitudinal slopes and side slopes
-spot elevations
APR 10 2007
Apr 09 07 07:04p
p.4
-permanent erosion control measures (drop structures,
riprap; et-
-tie-in to pipes, pans, curbs, etc....
-weir size (elevations, size, opening, etc.)
-available freeboard
-landscaping infringement on swales
14& 3. Pipes
-size and type
-slopes (as -built and comparison to minimum 0.4%
slope)
-pipe capacity calculations if slopes are
significantly altered
-invert elevations
-installation and backfill material
-cover
-encasement and clearance from other utility lines
close by
-joints
MA 4. Concrete Pan Channels
-size
-slope
-super elevation
-cross _section
-thickness
-elevations
Ply 5. Inlets
-size and type
ST®RMWATER
RECEIVED
APR 10 2007
Apr 09 07 07:04p
p.5
-size of opening {or name of standard used}
-grate elevation
-invert elevation
-box size
6. Cross pans
-size
-type
-grade
-elevation
-cross-sectional depth
-tie-in to curb and gutter
7. Culverts
-size
-type
-invert elevation
-headwalls
B. Underdrains
.size
-type
-cover
backfill
-geotextiles
-cleanouts
OA 9 . Curb cuts
-size
STORMWATER
RECEIVE®
-tie in to Swale, pipe, etc...
B. Certification of Grade Slevations Adjacent to Drainage
Facilities:
APR 10 2007
Apr 09 07 07:04p p•s
STORMWATER
RECEIVED
APR 10 7007
8_- -minimum opening elevations
97.Ob -top of foundation elevations
-comparison to 100 year WSEL's (Freeboard
requirements and floodplain issues) ( zl�' LVJ3
C. Certification of Erosion Control Measures:
NA1. Permanent Measures:
-Permanent vegetation (6" bare spots and weeds under
control)
-riprap
-riprap bedding
-drop sections
-sediment basins/water quality ponds
-netting mats/blankets
-mulching
AW. Temporary Measures:
-mulching
-inlet filter installation
-check bale dams
-seeding and temporary vegetation
-silt fence
D. Site Cleaaup After Construction
f construction clean up
f smoothing of ruts
-reseeding
E. Statement of Compliance
This certification is signed and stamped and by signing
this fo-m the engineer(s) attests that they have inspected
Apr 09 07 07:05p p•7
the site and to the best of their knowledge the as -built
conditions of the drainage facilities are as described is
the above form and in the redlined plans enclosed.
Failure to properly disclose all Down information could
result in the rejection of this certification and prevent
the release of any Stormwater Utility holds on Building
Permits and/or Certificates.of Occupancy-
F. Signature and Stamp by a Colorado Registered
Professional. Engineer. STORMWATER
RECEIVED
APR 10 7007