Loading...
HomeMy WebLinkAboutSite Certifications - 04/12/2001North Star �Awmw design, inc. April 10, 2001 Basil Hamdan City of Fort Collins Stormwater 700 Wood Street Fort Collins, CO 80522 Mr. Hamdan , -7"3o/ze6% This letter is in reference to the drainage and site certification rewired for the recent construction at the Bank of Colorado, Oakridge Business Park, 28 Filing in Oakridge Business Park, Fort Collins. A survey has been completed on the recently constructed parking lot, storm pipes and detention/water quality pond in this development. Attached are calculations showing the required detention/water quality volume for the pond and the actual volume provided by the pond. The pond provides slightly less volume than is required and the 100-year high water elevation is slightly higher than was designed. Since this survey, the contractor has removed additional dirt from the pond in an effort to achieve more volume. The pond was not resurveyed after this effort. A sheet is attached showing the design elevations and redlines showing the `as constructed' elevations. As you can see, the parking lot, in general, will function and runoff will flow in the intended direction. A sheet is also enclosed which shows the storm pipes that were designed for the site with redlines showing the actual Gas constructed' inverts for the pipe. As you can see the pipes have been installed within construction tolerances. I certify that, based on the information provided to me by Fredrick Land Surveying, there is adequate volume provided in the pond and the drainage pipes have been installed in substantial compliance with the approved plans. Please call me if 3fo-u ha _ Qr re ire additional information. Sinc 0.,�P KliOF'• •9Fo ,4 • 1306 .CC Patricia Kroetch, 9�'0F••.•,,,,.••'�,��' North Star Design, Inc. �S10N R1• �� 700 Automation Drive, Unit I Windsor, Colorado 80550 970-686-6939 Phone 0 970-686-1188 Fax f Proposed Detention[Water Quality Pond - Stage/Storage LOCATION: Bank of Colorado PROJECT NO: 114-03 COMPUTATIONS BY: PPK SUBMITTED BY: NORTH STAR DESIGN DATE: 3/13/01 V= 1/3d (A+B+sgrt(A'B)) where V = volume between contours, ft3 d = depth between contours, ft A = surface area of contour Stage (ft) Surface Area W) Incremental Storage (ac-ft) Total : Storage (ac-ft) 68.4 0 , 69 596 0.003 0.003 70 1096 0.019 0.022 70.83 1811 0.027 0.049 71 1957 0.035 0.056 71.76 3780 0.058 0.108 Required WQCV = 0.022 acre-feet Required Detention volume = 0.027 acre-feet Total Volume Required = 0.049 acre feet ASBUILT POND VOLUME Stage (ft) Surface Area (fe) Incremental Storage` (ac-ft) Total Storage (ac-ft) 68.4 0 69 572 0.003 0.003 69.5 780 0.008 0.010 70 1011 0.010 0.021 70.04 1031 0.001 0.022 70.5 1264 0.013 0.034 70.96 1549 0.015 0.049 71 1571 0.029 0.050 71.76 2018 0.032 0.081 Nater Quality Capture volume 100 Year WSL Dverflow elevation Nater Quality Capture volume 100 Year WSL Dverflow elevation wq.xls Pond Topo 0 II h V t3 0 U U] I r.+ ® � N 0 LJ R 1� LJ outfall curb (typ.) 0 Contour Areas HARMONY ROAD APPRDUMAR LOCATION OF EMI GAS LINE. g V Ig RELD VSRi PRIM TO CMMENGNG CMSTRUCntlV AP auNau, , GEAX_BUT ... ,• _ 'i 0 N MN6U' ELECTRICAL VAULT TO ® E 501N.M O ! PERFORATED CPE. WW]2Y W_ BE K-DkA.TED. WON 12'59S MP.R, 21G I49,B 8 4+ ]J.m N]. 51M n: B' VIUFAALNN �N /� i 1.0• � Y[uM CLLANQUT ,. FOR NU15C.WCE FLOWS d Y- SM2]0 — — ^iV' OF S EXISTING LOC.SnM E SDiS. COMMEWMENCING NCING PRICON ro �i RM a I.M R ]x y IY B' TARRING SACIXE CMMENCN4 CMSniL'CTM Y -/p 5j _ -3 T� . W/IB. B' SAW NEW EAST FTA - �{. • MIAM I BSS LF B- t5' E NH.]0 C NA D A FIRE uME. W RAL WAGANUI 94 I1 WATER SERVICE A F�--i4.5B SSA —1 PATRON PAVEMENT AFPRJxnATELY 528 V 6•.. I p Yl.y FOR CTY OF FORT DNA OP FWE UNE CURB STOP A YE1W FIT CCWXS REQUIREMENTS ry' ]25- BEND W/ T.q V WAk N 5090.]5 sM1]B WR E SP].]B TE MOM MAN a E .v9B.At mTUL OMNSPOJTS INTO C¢AWDICAKRE FIEJD LOCATE EASING 2' Ry By, a $L�'IRNO A SEWER SERVICE STU CONNECT ,0 APROAMATELr . FIVE GOWNED STUN JEXTEND AT SEINR $ERNCE 0 1 01 r SCORNS J 2% TO PROPOSED(wv.:.ae.el LTFAtia4 _ BUILDING J1GQ INV.713 N' L 67"1] p VNMAMux FF P 5105.24 y AT TOx CAI E0 CMMETE SCMINO SV:, SENIOR, AANMIXF ACEwALN Q1LKRl NY /K-49MOSp J ' I a] UE X 5]a.P NY F.AACK0 ii O 1 ^ ITT 6 1r P E 5161M tl RM a I LIGHT (rn 1 hu d ) III I Q l ✓A � X, w " XjWALL (A > QUI9T A� rTNT. wAe t p I GO VMF)MG 0 FOR NUX.A CE RE ,3J ZY } END PFAECRARD REF. um; ENCROSSWALK r/ �iJ r GMB N ;Soto IAN, NM.]1.42 : E KTAA OPENING ¢ I r Q c Iy - IXf• 1sp�.31F><`�' ; K C } RIOT mKE l ID / /\ ADS / DUCTNO DRUM WTI SOLD CASTmIRON GRATE W APPROVED EQUAL MAN LNE %M 1' RISER %PE AS SHORAN M PLANS UNDERDRAIN CLEANOUT FOR LANDSCAPE AREAS FtlA•1 MAtt veY r ! MNIxgE AYE AND SOLD uO \ EEHA I No R-n@-AL OR EQUAL I 1r AM MAN ME PRECAST 12' NIGER A$ PIONx M P4x5 UNDERDRAIN CLEANOUT FOR PAVED AREAS N O10O CALL URUTY NOTFlCATION C a o CENTER OF COLORADO Nr co 1N800.922.1987 N a534.6700w= �� mom A _6M ONE. DAYS N ADVANCE IITM xldd UR DIGSGIAW. RETURN OFUDEEGROUND O UOm EM Mf Y MBE' p WURES GGgM CSC ON Y cc Q d 0 a Q J d 0 W Z 0 Z J J 1)1) LL W I LL Ad W DD z ONYcl Z M LL Q T, Y m a O oWALL d WIN (FRI 4 D0-55 — EXISTING SANITARY SEWER SEI EGSD MANHOLE m FFLiI I ,�=11) - 5� TNG STORM SEVER AN MANHIXE W EXISTING WATERMA IN • _ _ - m?u ]z= r9Y .g --GAS— ENSlRNG GAS MAIN 4972 YA 1 UES EXIS TING ELECTRIC LINE T'P yxCAE RYA he P Ng£ D4 — % EXISTING FENCE 0 1ro11SlEG '�S EXISTING FIRE HYDRANT w i 1 y CURB EXISRNG WATER VALUE ,p h q" WT. • E%ISRNG STREET UGHi %LgvMLJ B I I Y2Y _ lY .>'� Y ® EXISTNG IELEPHaIE RETIES AL EX STING SIG4 20 10 0 20 AO tl •� ' W/ METALICCONCRETE -_A EXISTING TREES 6 • PLATE .. L" SCALE 1 20 *. Mp HIGH POINT DEvp1]5u11�/1G SlAnl BTUB TIE PVC INTO AT 1K ANT TF TOP OF FOUNDATION ELEVA ON a O a tl RAE, BINL rvv.,om �Y_5 ' O .. - EXISTING CONTOURS pIN X LL q>.\ yp /� 0 11KRIDliC p YNB-------- EN$RNG INDE% CONTOURS tl n • C Da 54 PROPOSED CONTOURS 0 —N city of Fort AN Collins.AP, APPROVAL y 'Y _ __------ 0 N CATMpF�wr lrcN A905 PROPOSED INDEX Ti m p _-Fssnxe e'IN__ - ___ 0 �}__ __q-.-=____ \ — --- PROPOSED FLONLNE w ATV M FORT , REPLACE -_ _________________ 1e SEEORGAnaxs. REFua APPp .i-]� '- CAWZTL PAN ro ENSTWG - Oat. � N � �TGN% M] _. " SHEET q a _ \ CHECKED BY: LILM m Dw NOTES NECKED BY:� l,. sLum.w. Ala] Da. �L—l9n 1. STORES OF 4:1 OR GREATER SHALL BE SOODED TO MINIMIZE OSION. PIEIXEO BY: E 2. ALL SPOT ELEVATIONS GIVEN ARE FLOWLNE OF CURB. M1b a III I - 0 • • 3. WATER ONES TO MAINTAIN A MINIMUM OF 45' AND AMA%IM I OF 5,5' OWM . • OF COVER MEASURED FROM FINISHED GRADE. CHECKED BY: �2 Z[�o0 3 OF 8 A ALL DUCTILE IRON PIPE (DIP) SHALL BE ENCASED IN PCIYMRI I. CHECKED BY: __� NoD No. 114-03 OAKRIDpE D ' D,aiF AtMhq( AnKAM Nvr x.Ws7a NVF-NYIF 1 NOTES �A F> r �'1 1. ALL STOW NINE SHALL K MASS III KIWORCED CONCRETE YZ. J -ri VO 2. ALL SrNM PYE SHALL HALE PRESSURE SEALED JgMS. 3. NINE SHALL SE MCI USNL CLASS C N CLASS 0 DECDNO ..::1.:1<CD DY: i PER DETAIL SHEET 6 4, SEE WET S I NA OUTLET DETAIL. 1fi: I l 11 ..e�L'i4EGi— 1r427-, 20 10 0 20 40 CHECKED BY _ H SCALE: 1' 20' YiHHNNN gh�IgqWq ggklklkltq gMgt�klql HNN.FHHHH F-x AmaM�i w w.. rrNr rr �1 Yv Lx SECTON z-z END VIEW w Y END SECTION FOR REINFORCED CONCRETE CIRCULAR PPE CONCRETE JOINT FASTENER GENERAL NOTES EO5E CON u-ew-m 2 CLINCHED ND SCNNS ARE w DE NRxam CONCRETE END SECTIONS MM 1N0.( M PNEDA AS MP.x®. 3. NSM C010101RA11N AND .KLT Or CONCRETE CITY OF FORT COLLINS, COLORADO END srnw 4q INK SHALL wrN. Bp�ap 8 9 IMr A. ONC ETE A+E JOINT pAST rxs. NHEW AFPEavED Illy. AYM N KANL N.4L H NSTMLEO b MAT uu OF M IKu FEET OF M WILE" lal L END OF ME RE ME WCANINCNLY La^I® T<CETHER. END S:LnN LEMO 11N NF THEM. IsauOFD IT ME DEwDowT. wI5 „Epr4, D-15 -F. City of Fort Collins. Colorado UTILITY PLAN APPROVAL APM Ep: Lnr uIA.NN DNN CAUnUTY ArGN CHECKED BY: 1. s0 .A7 E Oi COLCRA ) �/Ks 1.800.922-1987 CHECKED BY: �waNNHJNNH �uIrurr-� y -1i-QJ m 534=6700 N �^a aKCE DHN°""N Unit" wN Geu 2 ePNLss M ADVANCE CHECKED BY: kM. Hrg1E YOU INC.L4AOC, rR EXCAVATE PUYA k Rw<IM OeIA N MC WWER Oi IMMAJKVMO LKRDN FJn[S CHECKED BY: rr.TW uwM. DeN CHECKED BY 4990 1 1 1 1 1 1 1 1 1 1 1 1 1 4990 4985 4985 y O m; y PMnaN OF STOW FINE- qA n u_ �oL OF an 4980 iR jEY B1' ^x °^ 4980 H Kai,Hog wM zST s F 83k gJae £e ' 4 PD0P m 4975 1 mxn ¢pa 4975 JEN kss t* XISTNG x� ELS➢xG N NO Ve W R W _ _ — - -ro.w _ Fdt TEr 4970 — — ETHIC DErARx _ 4970 1 "I LF H'CLAWM 00.4x UOL. 1r MA55111 4S 8602L ID• MDi N JH HIE "I CMN AT MIE (LENGTH 5 FES) O l.wi .. ]A 13• ; SHALL a PRESSURE JOINT ACIN awA 4965 NINE CONINd nN AT s THE 4965 91MLK A MUSEUM SCALED ADINT 4' rnE mPxAs MM 6HIEDDING CIRA ULW 4960 �WR ST M B 4960 TOR �L O A 4955 4955 4950 4950 0+00 1+00 0+00 1+00 aD 3+2 1.87 — 975 4975 e1'-J wm .� -w -20 aotz 20 w 111 waG 10 zan 20,L — 4975 4975 0.2r-�J —w -20 + w 20 40;2II 2+50 —I NI ♦975 4970 4975 4970 N C� J� y Yp dm � OA `o a) E.mDINIs o�w z ono �3m -40 -20 non 20 _. - 40 •• Y IT 49M w80 0 2 0o d o w 0 3 Q E F 4975 0 W co 1.qx — — 3.tK — 4975 V W Z a N aw'+j Z = O N 3• c41J U0 -40 -20 20 40 .,o a U m m m L1.. .. �Qay 00 1+50 3 (DN Y o G 0 -J 0n •vr zWx z1H \ SHY/p � Q N U 4970 4970 O w -20 On 20 n m 40 a 4975 4975 znx M23 4970 D• 4970 -40 -20 20 40 w00 4975 4975 0 50 A3R — E A 4970 4970 —w -20 w 20Fz Non i Fz 4975 a at 4975 0 42 2.aNL 4970 49>0 -w -20 00+ 20 w FZ i S 1 4975 4975 7LI 4910 m -40 -20 1 0 20 w MCMURRAY DRIVE CROSS SECTIONS A W 0C II II n M aV O Q 0 SHEET 6 6 OF m ND. 114-03