HomeMy WebLinkAboutLot Certifications - 04/10/2015utlllfies
Cf}�
electric• stonrnrater. wastewater. water
Di
Fort
Wood St
PO Box 580
Collins
For CO 80522
Fort Collins,,
fv�
970.221.6700
�\
970.221.6679 fax . 970.224.6003 TDD
utilities@fcgov.com . fcgov.com/utifities
CERTIFICATION OF LOT GRADING
Pursuant to City Code § 26-544 and City Land Use Code § 3.2.2 (e)
Date: 04/10/2015
Permit Application No. B1400629 CO faltcus'( '&/7sts_ ,
Address: 1331 Hearthfire Court, Fort Collins CO, 80524 �
Lot: 59
Subdivision: Hearthfire P.U.D 1st
(,(Print) Cody A. Gelsendorfer , a Colorado registered professional engineer, verify that the
above referenced property in the City of Fort Collins, Colorado, has been inspected by me or an appropriately
qualified professional under my direct supervision, and verify that construction of all stormwater facilities and grading
is complete, and that the elevations and drainage patterns shown on the attached drawing(s) which were developed
from a survey performed on (Date): 03/23/2015 , accurately and truly depict the elevations and drainage
patterns as they existed on the date of the survey. Based on this information, I certify that (check one)
The elevations and drainage patterns of the lot/site are in substantial conformance with the City approved
drainage and grading plan for the property (information attached). SEE NOTE.
Y" The elevations and drainage patterns of the IoUsite as measured are in general conformance with the City
approved drainage plan with exceptions (information attached). In my professional judgment the elevations
and grading of the lot/site as constructed are functionally adequate and equivalent to the specifically
approved drainage plan, and will affect stormwater drai e on and off the site i9Fla manner Consii
with the approved drainage plan. SEE NOTE.
JO L/ By
: �4A/a -
�R4a E IS CF��S (signatur , P s mp, mail address)
r�' Et'Cfb;. 1501 Academy Court, #201
a x
41326 m Fort Collins, CO 80524
(970) 416 - 7891
(address & telephone number of signing party)
NOTE: A COMPLETE certification must be submitted at least two weeks prior to a request for a Certificate of Occupancy
for the lotlsite, Including but not limited to drawings of the lot/site showing the approved design and as-bulit surveyed
elevations of all structures, drainage and grading features (e.g. swaies, retaining walls, lot corners), written
information/explanation of discrepancies, and other information necessary to confirm the above certification to:
Fort Collins Utilities
700 Wood Street
Fort Collins, CO 80521
(970) 221-6700
Rev. 1r27/12 Submit Two Weeks Prior To Requesting A Certification Of Occupancy For The Property
GRADE CERTIFICATION
LOT 59 BLOCK _ SUBDIVISION HEARTHFIRE P.U.D. 1ST
COUNTY OF LARIMER STATE OF COLORADO
ADDRESS 1331 HEARTHFIRE COURT, FORT COLLINS
cuaD
R=224.50'
rL=95.40'
\ c
SEA
TOF-99.2 S
FF-100.3
FF-98.5
BFF-80.4
X BB3 \
A99X
C
LOT 59
13,452 SOFT,
I, STEVEN PARKS. A DULY LICENSED LAND SURVEYOR IN THE STATE OF COLORADO DO HEREBY STATE
THAT THE ELEVATIONS SHOWN HEREON WERE DETERMINED FROM THE RESULTS OF AN ACTUAL FIELD
SURVEY MADE BY ME OR UNDER MY SUPERVISION ON 03/20/2015 AND THE INFORMATION SHOWN HEREON IS
TRUE AND CORRECT TO W;BM QF MY BELJEF AND KNOWLEDGE
u : 38!6
LS 38345 ••e'FroMAI
KING SURVEYORS
650 E. Garden Drive I Windsor, Colorado 80550
phone: (970) 686.5011 I fax; (970) 686-5821
www.kingsuevryon.com
DRAWN BY: EWL
SCALE: l'"=30'
DATE: 03-23-2015
JOB N0. 2015192
CLIENT: LAMAR VALLEY
HEAR FIRE CT.
\ ` 1 •. \
579s
s, •y�Jo I.I \ v�
` \ \ TRACT H f
•
V SEE SHE 38
59
r �
9
\ \ 59
\
\ PM
\ \ J
\ \ g> 9 TpN.9�'6 B� �J
\ r
\ \ 6
6 e
\ +(n2r� \
\ \ C> m c w
\ \ r, 6
�m m\
\ I�
\ qm = \ ° at
EXIST WHITING PETROL -p -I
\ ( WATER 4UVPLY 9 STOP x
>>
\ p m` \ c
\ o \\
���'� ma's+
QUALITY
`x ENGINEERING
W WW.QUALITY-ENGINEERING.COM
CERTIFICATION OF LOT GRADING
Date: March 10, 2015
Permit Application No. B1400629
Address: 1331 Hearthfire Court, Fort Collins, CO.
Lot/Block/Subdivision: Lot 59 Hearthfire P.U.D 1 st
Exception:
The southeastern lot comer does not match the overall subdivision grading elevations; however, grading
intent is still met. The elevation difference of 1.45' between then site plan grade and existing grade is to
match the elevation of the valley pan that runs parallel to the eastern property line.
QUALITY ENGINEERING, LLC (970) 416-7891 1501 ACADEMY CT, SUITE 201 FORT COLLINS, COLORADO