October 25, 2001
Mr. Glen Schlueter
City of Fort Collins
P.O. Box 580
Fort Collins, CO 80522-0580
RE: (Northern.Hotel
Dear Glen:
NOLTE
BEYOND ENGINEERING
On A
i0, a6 Go/
At the request of the City of Fort Collins Stormwater Utility Department, Nolte
Associates, Inc. survey gathered the following information on Tuesday, October 23,
2001:
1. Invert elevation of the 8" storm drain at the existing "boiler room" located
below the sidewalk on Walnut Street.
2. Location of storm sewer clean -out located at the northwest corner of the
Northern Hotel.
3. Location and invert of the 18" storm sewer and inlet in Walnut Street.
It is our understanding that the City of Fort Collins removed the storm sewer manhole
indicated as existing on the previously approved plans. When this removal was
completed, the 8" storm sewer was connected to a new 18" storm sewer and flows were
directed to" a new street inlet. The type of connection between the 8" and 18" is unknown
to us. The City of Fort Collins did install a clean -out with a pit and cover identified as
"water service".
The attached plan (sheet 2 of 3 from the approved plans) reflects record data that can be
gathered by a visual survey. Nolte Associates, Inc. did not size the 8" and 18" storm
drain, nor did we design the connection between the 8" and 18" storm drain. Our work
did not include documenting the location and nature of other utilities in the area.
Sincerely,
NOLTE ASSOCIATES, INC.
Tom Ochwat, P.E.
Senior Engineer
NOLTE ASSOCIATES, INC.
1901 SHARP POINT DRIVE, SUITE A
FORT COLLINS, CO 80525
970.22 1 .2400 TEL 970.221.2415 FAX
WWW.NOLTE.COM
NOLTE ASSOCIATES, INC.
1901 SHARP POINT DRIVE, SUITE A
FORT COLLINS, CO 80525
970.221.2400 TEL 970.221.2415 FAX
WWW.NOLTE.COM
BEYOND ENGINEERING
TRANSMITTAL MEMORANDUM FROM FORT COLLINS OFFICE
TO: Storm Water Utilities Dept.
City of Fort Collins
700 Wood Street
Fort Collins, CO 80521
ATTN: Mr. Glenn Schlueter
The Following Items Are Being Forwarded:
DATE: 10/25/2001
PROJECT: NorthernHotel
NOLTE JOB # : FC018300
® Attached
via Courier
I LW I I I I.Awanuly
Letter of Explanation & Overall Utility Plan -Record Drawing (sht 2 of 3) 1 1
Remarks:
For Your
As
For Your
Use
Requested
Review
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
C.C.: By: Tom Ochwat (for Rob Van felen)