Loading...
HomeMy WebLinkAboutLot Certifications - 12/19/1996 (4)FFM PARK ENGINEERING CONSULTANTS IZI�°1 I��a December 17, 1996 J� O Mr. Basil Hamdan City of Fort Collins Stormwater Utility 235 Mathews Street Fort Collins, Colorado 80522 RE: -iNeenant@, . FiceiBu Jinn-ONPDrainage Certification Dear Basil: Si ,RMWATER RECEIVED DES 18 MS Enclosed is a completed Drainage Certification Form and a red -lined print of the Drainage and Erosion Control Plan for the referenced facility. We have completed an as -built survey and inspection of this project and find that it has been completed in substantial compliance with the approved Plans prepared by us. If you have any questions, please call. Respec y in" ed Donald W. Park, P.E. cc: Mike Stajduhar, Neenan Company file 10736001.doc 1240 Main Street Longmont, CO 80501 (303) 651-6626 FAX (303) 651-0331 •'Y 1 DRAINAGZ CNI(•1'IFICA ION FORM Please fill out all applicable items in this certification form for single family, mn1.r_i•-family and commercial properties. Write 'WOK" for items checked or actual number checked in field. Use "N/A" for items that"are not applicable to the property that is being certified. A. Drainage facilities certification 1. Pond Certification -volume verification a. topographic records and volume b. cross -sections and spot elevations -positive.fall to pan -side slopes -invert elevation -spillway elevation -placement and size of riprap -side slopes -grading -orifice plate installation and size -compaction of berm -structural integrity of pond 2. Swales -location (are they within easement) -dimensions and cross-section verification -longitudinal slopes and side slopes -spot elevations JAM-24-96 WED 13:58 M -permanent erosion control measures o�C' (drop structures, riprap, Pr.r....} -tie--in to pipes, ,pans, curbs. etc.... -weir size (alpvations, site, opening, etc....) - available freeboard landscaping infringement on swales j2& -size and type Oe -slopes (as -built and comparison to minimum 0.4% slope) -pipe capacity calculations if slopes are significantly altered r- -lttvei'l, g1GVd�lUtld 3�. -installation and backriii manorial l2� -cover -wnnasPment', and cl.eara.nce from other utility lines close by �= -joints Q� 4. Concrete Pan Channels -size -slope - -super elevation -cross-section -thickness . -- -elevations -- 5. Inlets -size and type -size of opening (or name of standard used) -grate elevation -invert elevation -box size 6. Cross pansle?" Aer0141_ -size -type -grade_ -elevation -cross-sectional depth -tie-in to curb and gutter 7, Culverts -size �Q- -type -invert elevation "A -headwalls' B. Underdrains -size -type -cover -backfill- -geotextiles Jf11R GY VV n"V "'. -cleanouts 9. Curb cuts -size -tie in to swale, pipe, etc...._ B. Certification of Grade. Elevations Adjacent to Drainage Facilities: -minimum opening elevations -top of foundation elevations comparison to 100 year W3DL's (Freeboard requirements and floodplain issues) c. Certification of Erosion Control Measures: 1. Permanent Measures; -Permanent vegetation (61, bare spots and weeds under control) 11C ,rw�wd' J/"''�� 1??7 -riprap - riprap bedding -drop sections u� -sediment basins/water quality ponds -netting mats/blanketsAA -mulching 2. Temporary MeasuYes: AelAL -mulching -inlet filter installation - -check bale dams- -seedin d temporary vegetation AZ d0 JeaaG«a � .r�i�•� /997 -silt fence D. Site Cleanup After Construction -construction clean up -smoothing of ruts -reseeding T dam/ f�"�f /1 ?7 - E. Statement of Compliance This certification is signed and stamped and by signing this form the engineer(s) attests that to the best of his knowledge the as -built conditions of the drainage facilities are as. described in the above form and in the redlined plans enclosed. Failure to properly disclose all ]mown information could result in the rejection of this certification.and prevent.the relcace of any Stormwater Utility holds on Building Permits and/or certificates of Occupancy. F. signature and Stamp by a Colorado Regi Engineer. 0 I BASIN OS1 A=0.64AC. �W , ELEY 'Bp 9A HIOAO CUR uEv. Beee.Aa I ed, aTv .ec0oo A 11 TPI iHARP P0I — DRIVE sT� 0.00.lro vPl..n �R hpp.�/ �6 6-} Ate] IN A - D� 4.5 US _ TML) BASINL} I 1 l BURIED WRAPA\ _ Ic A=0.54 C ���� �` 1 T; A"T_ TRACT; � IPA �g NATURAL POND s VOL zz 2ft,6¢o. C.F. xj§ MAX VOW �96.0 `PD�Me A rlq � UTILITY N 1 I; ✓ ;' ACCESS E, v I A IH �.Beese 1 LO ,3Ys BASF a ' A - Q 1 O I ON 1 m I;Q111, Wall, 1 LLJ %G1. EA °cn f A;SI N OI A1.15 A( I I 3 ``• FUTURE Q f2!/6RADInG \ 1 ern' S m I X z L2v IN I �� WdvT < 11: I A 6M1 1 Y u L INV. N) -TS A.BT INV. E) WBMbaG -- / .' \-N - f 1 op j Ox nA US T J Dr- 24.8 COS N TA RIPRAP RBOB RIEAP- T qOp P�OINWE V R Bp1 • INVHIN 95q�{5 or INV OUT J6IN$9HI4l9 ORIE7E PATH GIN IREPCO CONDITION S IXiIGI:AI I3 C. I R \ R \ _ v� � r`\\ E f—ST�V x_ � --,-' Agx4 vnm \MiSFi_ SEC A —A SEC B—B ------------� -� L _- BASIN F \\ - 1 v-e0' --y _ WAY MAY Y.041 .72 LOT 2 A\ 3.1Q AC. TRACT C \ \• SEC C—C SEC D—D 1 PROMDE 2' OPENING-�-- -lop FUIDREI �N - N FOR`MAURICE PARKINd \A 1 - CLA 6 N. 8.0_ _ —I \ t NO ' W g� a9 m I�—r - e' cuw .xo CAI vF \TLBA S 1`N''9�E SEC E—E CURB CUT DETAIL L'U. / V Al.. \� I DUILDING l &S ��\ \ N WRS SEMENT ' .� .. _ ,Ow 1\ PAVEMENT s NOTES: T ALL PANS TO BE SPILL UNLESS OTHERWISE NORD. I0\ AC. 2. THE BASE FLOW ELEVATION FOR THIS SIZE VARIES BETWEEN 4899.0 TO 49W.8. \FU111RE �i / V., (' ACCESS AND L 3 BASE FLOW ELEVATION LINES SHOWN HEREON M PARKING 1 r�Per FROM FEMA FIRM PANEL N0. 080102 W12 C. .4000 ENO MENT f11 _ i` S I N Tip, T� 6N9Y wnLR µp� _ 4A,• -J; BASIN B 1 ' J ( DRAINAGE SUMMARY TABLE \BA A = 1.42 AC. ---- -- j BASIN AREA COEFF. OIOD O1IX10 q' BASIN A 2.P ACoe) Te all Al as O YR 1'L 4 ILEVA ,Isoz.a2 LOT ,� 1 Nva� BASIN wnc 0e1 ee as ml as BASIN C 078 AC 0a lam 65 az A 5 COO — I 1YII Lopes % 1 yi. ul- 1 1.IIIna.'al. BASIN TWAT 0.22 rl as 2.2 a. BASIN 115 AC Dee 30 as ee os AA NEENAN OFFICE E,/, ✓ %/ � BASIN 372 AC ore pees 55a3 BUILDING II Iw ao _ 0, ' F.F. 4902.00 E VADON > ` /. Dtl.. ' ��•� BASING 1.27 AC 0.25 2.5 a5 11 O'S t ♦ e]xL�P i% .�� • .. �� .. C I:, 7=S'iI TOTAL 11 v5 AC M 6 as 4.e3 as FDIVIDE J' OPEHIM ��tMl CTS / T /'V// .0. owd A ' BASIN EST 0.64 Ac on 2 T m AA CF OIL�.!- — ': -••• BASIN 052 o.an¢ ovv z6 at aL —_ ..r W, �� �f s cr, N MAN f in e �: i� TRACT �4-' ; , ` MP a'M F Yams C11 P Y �i TOP OF BANK M nI (Tpeem y Ep 6M �JI� G / PWDRE WVER VM. NOYgTR(N " 1'�2 ( 'ice .I( _ `y .o `mel'wmii "`oM1W.,"�r1e' m. ao 0 20 w eo A — 1.L / -AC, a° EM. PIPES + p. 'T i / �' `� ! ORIGINAL SCALE. I'=e0 �yA -31 12 }PVC,Ii� LLMQ - 7 _ ,tee LASTIHC SANOTARY sslaH RENSED: 4 10 96 5 10 96' 6 10 96 /z 179 r WEEK 30_ 617J' - - HOLE PARK ENGINEERING fu�SM4 SANITARY YKH u OSED SANITARY SEAT" CONSULTANTS - ENSTIM RATER 1,RE PI 1)11 RATE HYDRANTR 12w MAIN STREET LONC,AONi CO. 80501 (2303)651-662E TASTING ATEN V LN `I PFI�RoINE �o . AN NEENAN OFFICE BUILDING II LA POUDRE RIVER 0 °°° DNARRLArzR QI eBY°PPAARKS AM'xo 4ERLAlNR are orrwrTriiNS. -- 1H+0=0SE0 STwu SEVER y I By !� PNaOsrD HAY BALES GRADING AND DRAINAGE PLAN = PRI SILT FENCE mI 102 AT R." fl£VARON W) pnlE CA0 M SHEET NO 1D]-36 2/23/% NEWORI 12 OF .P