March 19,1996 ,) p `VRECEIVED
\� (/ MAR 2 0 1996
Mr. Basil Harridan
City of Fort Collins Stormwater tility
235 Mathews
Fort Collins, Colorado 80524
Re: North Lemay Plaza PUD Drainage Certification
Dear Basil,
This letter is in reference to the site grading and drainage certification for the above -mentioned
PUD. It summarizes the results of our field examination and computations performed to certify
that the as -constructed elements succeed in operating according to the approved design.
Ayres Associates surveyed the site in May and August 1995. The as -constructed elevations
are shown on the accompanying marked grading plan. We note that a check mark next to an
elevation indicates that the as -constructed elevation equals the design elevation. The site was
visited on March 18, 1996, to verify the removal of a tree adjacent to the area inlet at the
southeast corner of the site. The tree has been removed.
We note the following items:
• Surveyed spot elevations in the parking lots, drainage swales, drainage divides, and area
inlets located in the Phase I area were within 0.10 foot of design elevation shown on the
Grading and Paving Plan by Parsons & Associates, Inc. (approved November 18, 1994) and
subsequent revisions provided by Parsons on March 23, 1995. The building first floor
elevation, 56.0, agrees exactly with the design elevation and is 1 foot above the pond
overflow elevation (the entrance off of Lemay Avenue) and 1 foot above the computed
detention pond 100-year water surface elevation of 55.0. In the Phase II area, which is not
yet developed, most spot elevations are within 0.2 foot of the approved interim condition
grading plan shown on the marked grading plan. The actual 55-foot contour, which
corresponds to the peak 100-year detention pond water surface elevation, encompasses a
slightly larger area than the design 55-foot contour; therefore, the actual.storage volume at
that elevation should exceed the design volume.
• The "special' area inlet located at the southeast corner of the site varies from the approved
design in several ways. First, the inlet was rotated approximately 90° due to a conflict with
an existing telephone vault. The actual size is 48 inches by 102 inches (the design shows
an inlet of 48 by 103.5 inches). The size difference results from use of a different grate than
that specified. The as -constructed inlet and grate provide an open area of 17.8 square feet
(computations shown on the attached sheets), exceeding the required 14.3 square feet
computed in the drainage report. The outlet pipe draining the area inlet is a 42-inch
diameter RCP; the design called for a 36-inch pipe.
Owen Ayres & Associates, Inc.
Engineers/Scientists/Surveyors HAMD-3A.LTR
3665 JFK Parkway, Building 2, Suite 300, P.O. Box 270460, Fort Collins, CO 80527 34-0368.00
(970) 223-5556, Denver Metro (303) 572=1806, FAX (970) 223-5578
Printed on recycled paper
Mr. Basil Harridan
Page Two
March 19, 1996
• The area inlet at the southwest corner of the PUD is of the design dimensions and is located
at the design elevation. The 18-inch RCP pipe draining this inlet lies at a slope of 0.21
percent (design grade is 0.25 percent). The slope reduction is a result of changes at the
southeast area inlet described above. The required capacity of the 18-inch RCP is difficult to
determine from the approved drainage report. The report states that the pipe is intended to
convey nuisance flows and is designed for the 10-year discharge of 11 cfs; however, the
computations in the report show a pipe capacity of only 5.3 cfs. The slope reduction
reduces the pipe capacity to 4.8 cfs (as shown in the attached computations).
• The largest difference between design grades and actual grades occurs on top of the berm
at the southwest corner of Phase II. The design elevation in that location is 56 while the
actual grade is 55.5. This should not be significant for two reasons: (1) there are design
spot elevations of 55.5 on top of the berm elsewhere, and (2) the existing grades of the
pond just south of the area indicate a top -of -bank elevation of 55.0; water will overtop at this
location prior to overtopping the berm along the south edge of Phase II.
The as -constructed site grading and drainage facilities fulfill the intent of the design grading
plan. This letter does not certify that erosion control features are complete. Please call me if
you have questions regarding our findings.
Sincerely,
Owen Ay s & Associates, Inc.
4
Scott Qu en, P.E.
Civil Engineer
SQ:sp
Enclosure
HAMD-3A.LTR
34-0368.00
CC
O
I ,
NORT! G
C
C
F
Storm Sewer Line A - N. Lemay Plaza PUD
Worksheet for Circular Channel
Project Description
Project File
untitled
Worksheet
North Lemay Plaza PUD
Flow Element
Circular Channel
Method
Manning's Formula
Solve For
Discharge
Input Data
Mannings Coefficient 0.013
Channel Slope 0.002100 ft/ft
Depth 1.50 ft
Diameter 1.50 ft
Results
Discharge
4.81
ft3/s
Flow Area
1.77
ftz
Wetted Perimeter
4.71
ft
Top Width
0.00
ft
Critical Depth
0.84
ft
Percent Full
100.00
%
Critical Slope
0.005701 ft/ft
Velocity
2.72
ft/s
Velocity Head
0.12
ft
Specific Energy
FULL
ft
Froude Number
FULL
Maximum Discharge
5.18
ft3/s
Full Flow Capacity
4.81
ft3/s _
Full Flow Slope
0.002100 ft/ft
gLl a r a rweod e7a� .
Mar 19, 1996 None FlowMaster v4.1c
08:53:34 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
-
� EYTNO RqP T.fJ
FER S Ef--I-, CURS• •
��-- �C 'E b\a (Cm or FORT.CIXCNS G1/'1CR GIrA
LKRB k POwER)
EYSIFL -/ G lP1 'S1
eklis
'4-[FX:5'wG BOX -0 BE RQOGRO
- -
`\T COu A6 .wgMp. /YEYP[M
Todd. R/w3 ilfiiRC Ia\i I \P..4C,LJ. .-. �� IG --.'y :nDLE .A
%PAV.NO
tit 55r A1� 5 , 4542 LEGEN.
sold
ERS
o / 5 .r'YJOS.R \ i • MG LO.POVq
PV - I-_ d _ ___-_ E m G CONTOA
\� :u0/ 0 IT OF PROPoSE CONTOURI A u
I Inter �A C' ICO'FEAR c jm
0 o wro \ E
d.1, v'. -\may' )/Ir� PROPOSED
.c wIu
i `h ( II J. : - III' / rdddI t MISTING r SgiAP, SEP"
a I 1q•'r" I eµv _ :aa,:.. E r G s as, ORAN PIPE
IdId
\ �I�y PROPOSED SJ.au JWH PIPE
_IdIddid,
v �:[ A f _ - G PGOPOSEJ %IEIa LLRS k OMER
I I�- 1PAa ///� \_ I T.O.W. TOP OF 00,
1 I crfriRNSEJ �..� / / Flow PARc..
r -. . I �.� •; . n G i J.J . I \ _
dd MCRrm
MOP
nWa 5 5, '- SIR 54
J�• ... 5 LiJ ___H
r t.G ss:u- '�.-- safss `0 yi .
♦ J
`PW_0 SS I6j'
NFss I"'roE i / ... N.l���
(r
MEAD RY Sfv r r
/ �n� ' LRgI oemw s
- Rv_ eI - _ V� )Hs
� `v
— — r. 4
15� 16
y— _.. _. wf Usn
Y —
d. in BE RIdmilwa II
C..nS ['�j a 5
dl
I -AS: 2 ORD 1 woSE OLx. Y(M. euuf5 R3601) -
�- —
STORMWATER
i LavrP,me E. - s e... " GRA?r:.0 SCn:.E RECEIVED
ASC S 3" 01PLETIsa W-HSE::A q r0
rou o D c s 5 r` » j ^�� / MARL 0 1996
%ALE ol d,lS.wWPACE. cdI q4 �� y
, GRAI I IE BROO"IF F. . W EPWSE • ... G( j Inch 30 :L./l-
�r
——
Ti:(d
eh —
"" �'.-� 1}ARS l.TS ASSOCIIIITE�, IPjr MA U D SP,�'
s., -R1 , O v - --3 I A/L.- .-_ ,.5=ss ,. U �. - _ ��( o"—coN + Y PLAZA P.
432 Link ix Ane s _ 1' 2s),ry
Ft. Collin P. C losr f :-1524 Roe= RYU Checker GAO I "r DT A
r �i� c0NS11Ui > Esc, ::.:RS 3� ; 2.. �` ,, PHA E I GRADING AND PAVIn